Roxgold Reports 2019 Second Quarter Production Results

17.07.2019  |  CNW

TORONTO, July 17, 2019  Roxgold Inc. ("Roxgold" or the "Company") (TSX: ROXG) (OTCQX: ROGFF) is pleased to report its 2019 second quarter ("Q2")  and first half ("H1") production results from the Company's Yaramoko Gold Mine located in Burkina Faso ("Yaramoko").

Highlights:

  • Produced 34,354 ounces of gold in Q2 for a total of 68,006 ounces in H1 2019
  • Realized record quarterly plant throughput of 113,866 tonnes which exceeded increased nameplate capacity of 1,100 tonnes per day by approximately 14%
  • Continued ramp up of production from Bagassi South with first production stopes established in Q2

John Dorward, President and CEO commented, "The first half saw a solid operating performance at Yaramoko with gold production of 68,006 ounces and we continue to remain on track to achieve our annual production guidance of between 145,000 and 155,000 ounces. The processing plant continued to outperform achieving record throughput and operating approximately 14% above nameplate capacity during the quarter. Stoping operations at Bagassi South commenced during the quarter positioning production from Yaramoko to be stronger during the second half of 2019."

Operating Summary:

At the 55 Zone, 83,829 tonnes of ore were mined at 9.3 grams per tonne ("g/t Au") and 1,509 metres ("m") of development were completed.  During the quarter, approximately 76% of ore mined came from stoping activities with five open stopes available at the end of the quarter.  During the quarter, decline development reached the 4862 level, approximately 460m below surface.  At Bagassi South, ramp-up activities continued to progress with 26,011 tonnes of ore mined during the quarter and 1,417m of development completed.  Consistent with our production guidance, Yaramoko is expected to produce stronger quarters in Q3 and Q4 due to increased stoping operations mining higher grade ore at Bagassi South.

The plant processed a record 113,866 tonnes at an average head grade of 9.0 g/t Au for the quarter.  Plant availability was 97.6% and overall recovery remained high at 98.2%.  The unit throughput rate through the plant has consistently increased since the completion of the Bagassi South expansion resulting in throughput rates exceeding nameplate capacity by approximately 14%. 

Yaramoko Production Metrics 








 Q2 2019

 Q1 2019

 Q4 2018

  Q3 2018

  Q2 2018

Total Development (metres)

2,926

2,264

1,785

1,479

1,124

Ore mined (tonnes)

109,840

98,140

88,277

87,975

86,831

Ore processed (tonnes)

113,866

106,816

82,241

78,357

75,417

Head grade (g/t)

9.0

10.0

10.8

12.3

14.4

Recovery (%)

98.2

98.3

98.2

98.5

98.8

Gold ounces produced

34,354

33,652

25,844

30,532

35,828

 

Upcoming Catalysts

  • Q3 - Séguéla development update
  • Q3 – Further exploration results from Séguéla
  • Q4 - Yaramoko regional exploration results
  • Q4 - Results of Séguéla Preliminary Economic Assessment ("PEA")

Qualified Persons

Iain Cox, FAusIMM, Interim Chief Operating Officer for Roxgold Inc., a Qualified Person within the meaning of National Instrument 43-101, has verified and approved the technical disclosure contained in this news release.

About Roxgold

Roxgold is a Canadian-based gold mining company with assets located in West Africa.  The Company owns and operates the high-grade Yaramoko Gold Mine located on the Houndé greenstone belt in Burkina Faso and is also advancing the development and exploration of the Séguéla Gold Project located in Côte d'Ivoire.  Roxgold trades on the TSX under the symbol ROXG and as ROGFF on OTCQX.

This news release contains "forward-looking information" within the meaning of applicable Canadian securities laws ("forward-looking statements"). Such forward-looking statements include, without limitation: statements with respect to Mineral Reserves and Mineral Resource estimates (including proposals for the potential growth, extension, update and/or upgrade thereof, the anticipated timing thereof and any future economic benefits which may be derived therefrom), the timing and delivery of any future updated resource models, anticipated receipt and maintenance of permits and licenses, future production and life of mine estimates, production and cost guidance, anticipated recovery grades, and potential increases in throughput, future capital and operating costs and expansion and development plans including with respect to the 55 Zone and Bagassi South, and the expected timing thereof (including with respect to the delivery of ore and future stoping operations), proposed exploration plans and the timing and costs thereof, the anticipated operations, costs, proposed funding, timing and other factors set forth in the Technical Report, and sufficiency of future funding. These statements are based on information currently available to the Company and the Company provides no assurance that actual results will meet management's expectations. In certain cases, forward-looking information may be identified by such terms as "anticipates", "believes", "could", "estimates", "expects", "may", "shall", "will", or "would". Forward-looking information contained in this news release is based on certain factors and assumptions regarding, among other things, the estimation of Mineral Resources and Mineral Reserves, the realization of resource estimates and reserve estimates, gold metal prices, the timing and amount of future exploration and development expenditures, the estimation of initial and sustaining capital requirements, the estimation of labour and operating costs, the availability of necessary financing and materials to continue to explore and develop the Yaramoko Gold Project in the short and long-term, the progress of exploration and development activities as currently proposed and anticipated, the receipt of necessary regulatory approvals and permits, and assumptions with respect to currency fluctuations, environmental risks, title disputes or claims, and other similar matters, as well as assumptions set forth in the Company's technical report dated December 20, 2017, and entitled "Technical Report for the Yaramoko Gold Mine, Burkina Faso" available on the Company's website at www.roxgold.com and SEDAR at www.sedar.com. While the Company considers these assumptions to be reasonable based on information currently available to it, they may prove to be incorrect.

Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. Factors that could cause actual results to differ materially from those in forward-looking statements include: changes in market conditions, unsuccessful exploration results, possibility of project cost overruns or unanticipated costs and expenses, changes in the costs and timing of the development of new deposits, inaccurate reserve and resource estimates, changes in the price of gold, unanticipated changes in key management personnel, failure to obtain permits as anticipated or at all, failure of exploration and/or development activities to progress as currently anticipated or at all, and general economic conditions. Mining exploration and development is an inherently risky business. Accordingly, actual events may differ materially from those projected in the forward-looking statements. This list is not exhaustive of the factors that may affect any of the Company's forward-looking statements. These and other factors should be considered carefully and readers should not place undue reliance on the Company's forward-looking statements. The Company does not undertake to update any forward-looking statement that may be made from time to time by the Company or on its behalf, except in accordance with applicable securities laws.

View original content:http://www.prnewswire.com/news-releases/roxgold-reports-2019-second-quarter-production-results-300887004.html

SOURCE Roxgold Inc.



Contact
Kelley Stamm, Manager, Investor Relations & Communications, 416-203-6401, kstamm@roxgold.com
Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Roxgold Inc.
Bergbau
-
-
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.