• Freitag, 22 November 2024
  • 09:25 Uhr Frankfurt
  • 08:25 Uhr London
  • 03:25 Uhr New York
  • 03:25 Uhr Toronto
  • 00:25 Uhr Vancouver
  • 19:25 Uhr Sydney

Rockridge Announces Commencement of Summer Exploration Program at its Knife Lake Project

27.08.2019  |  GlobeNewswire

VANCOUVER, Aug. 27, 2019 - Rockridge Resources Ltd. (TSX-V: ROCK) (OTCQB: RRRLF) (Frankfurt: RR0) (“Rockridge” or the “Company”) is pleased to announce it has commenced a summer exploration program at its flagship Knife Lake Project located in Saskatchewan, Canada (the “Knife Lake Project” or “Property”). Rockridge entered into an Option Agreement with Eagle Plains Resources Ltd. to acquire a 100% interest in the Property that covers the majority of the Knife Lake Cu-Zn-Ag-Co VMS deposit. The contiguous claims total 85,196 hectares and are located approximately 50 km northwest of Sandy Bay, Saskatchewan. A 357kV powerline runs within 16 km of the Knife Lake Deposit area, greatly enhancing the project’s infrastructure.

Knife Lake VMS Project Map:
http://www.rockridgeresourcesltd.com/_resources/projects/Knife_Lake_Region_20190730.pdf

2019 Regional Exploration Program:

Research and the compilation of historic data has identified 11 highly prospective targets within the large landholding, and numerous second priority targets. The summer field exploration program has now commenced and will focus on a first pass evaluation of three priority targets: Gilbert Lake, Scimitar Lake and Machete. All of these targets are in the immediate vicinity of the Knife Lake deposit.

Gilbert Lake is a large priority target area 7 km west of the Knife Lake deposit. The target includes over 14 km of highly prospective VMS stratigraphy, contains a number of shallow EM conductors, and historic exploration has encountered highly favorable alteration and mineralization.

Scimitar Lake is a large target area centered 7 km east of the Knife Lake deposit and contains over 3.5 km of prospective VMS stratigraphy. Only three drill holes have been drilled historically on EM conductors identified with ground geophysics and two of the three holes contained shallow intercepts of copper mineralization including chalcopyrite and native copper. However, no assays were cited in the historical reports. The majority of known conductors remain untested both along strike and at depth.

The Machete target is located 8 km NNW of the Knife Lake deposit and contains 3.5 km of prospective VMS stratigraphy. This target hosts an airborne EM anomaly that has seen no documented exploration. The coincidence of the EM anomaly with the prospective Knife Lake VMS horizon have made it a priority target for follow-up.

2019 exploration of all targets will include geologic mapping, litho-geochemical sampling, prospecting, and soil sampling with the goal of making a new grassroots discovery in close proximity to the Knife Lake deposit.

Knife Lake contains typical VMS mineralogy which has been significantly modified and partially remobilized during the emplacement of granitic rocks. Therefore, the known deposit may represent a remobilized portion of a presumably larger “primary” VMS deposit based on general observations about the mineralogy, mineral textures and metal ratios in the deposit. Most of the historical work has consisted of shallow drilling at the deposit area with little regional work carried out and limited deeper drilling below the deposit. As a result, there is strong discovery potential both at depth and regionally.

2019 Regional Exploration Program, Priority Targets:
http://www.rockridgeresourcesltd.com/_resources/maps/Knife-Field-Program-Start-NR-20190819.pdf

Knife Lake Geology and History:

The Knife Lake Project is interpreted to be a remobilized VMS deposit. The stratabound mineralized zone is approximately 15m thick and contains copper, silver, zinc, gold and cobalt mineralization which dips 30° to 50° eastward over a known strike-length within Rockridge’s claim area of 3,700 metres, and a known average down-dip extension of approximately 300 metres.

Knife Lake Deposit Map:
http://www.rockridgeresourcesltd.com/_resources/projects/Knife_Lake_Location_and_Highlights_20190730.pdf

The deposit is hosted by felsic to intermediate volcanic and volcaniclastic rocks which have been metamorphosed to upper amphibolite facies. The deposit contains VMS mineralogy which has been significantly modified and partially remobilized during the emplacement of granitic rocks. The mineralization straddles the boundary between two rock units and occurs on both limbs of an interpreted overturned fold.

The Company completed twelve holes consisting of 1,053 metres of diamond drilling in the 2019 winter drilling program. This represented the first drilling on the property since 2001 and had two primary objectives: confirm the tenor of mineralization reported by previous operators and expand known zones of mineralization. Highlights from the drill program included previously reported hole KF19003 which intersected net-textured to semi-massive sulphide mineralization from 11.2m to 48.8m downhole. This 37.6 metre interval returned 2.03% Cu, 0.19 g/t Au, 9.88 g/t Ag, 0.36% Zn, and 0.01% Co for an estimated 2.42% CuEq. Additionally, previously reported drill hole KF19001 intersected net-textured to fracture-controlled sulphide mineralization from 7.5 metres to 40.6 metres downhole. This 33.1 metre interval returned 1.28% Cu, 0.12 g/t Au, 4.80 g/t Ag, 0.13% Zn, and 0.01% Co for an estimated 1.49% CuEq.

Knife Lake Plan Map and Drill Collar Locations:
http://www.rockridgeresourcesltd.com/_resources/maps/KN-2019-DDH-Location-20190808.pdf

Compilation and initial modelling indicate potential for expansion of the deposit at depth. The recent drilling focused on resource upgrade as well as infill drilling between historical holes. The program gave the Company’s technical team valuable insights into the property geology, alteration, and mineralization that will be applied to future regional exploration on the highly prospective and underexplored land package.

The Knife Lake deposit is a near surface VMS deposit starting a few metres below surface and the deposit remains open at depth and along strike for potential resource expansion. Recently Rockridge announced a maiden NI 43-101 resource estimate for the Knife Lake deposit (see the News Release dated August 14th, 2019) which consisted of an indicated resource of 3.8 million tonnes at 1.02% CuEq at a 0.4% CuEq cut-off (3.8 MT at 0.83% Cu, 3.7 gpt Ag, 0.097 gpt Au, 82 ppm Co, 1740.7 ppm Zn). In addition, there is an inferred resource of 7.9 million tonnes at 0.67% CuEq at a 0.4% CuEq cut-off (7.9 MT at 0.53% Cu, 2.4 gpt Ag, 0.084 gpt Au, 53.1 ppm Co, 1454.9 ppm Zn).

Qualified Persons:

Grant Ewing, P.Geo., a “qualified person” for the purposes of National Instrument 43-101 - Standards of Disclosure for Mineral Projects, and is the CEO of Rockridge Resources Ltd., has reviewed and approved the scientific and technical disclosure in this news release.

About Rockridge Resources Ltd.

Rockridge Resources is a new publicly traded mineral exploration company focused on the acquisition, exploration and development of mineral resource properties in Canada, specifically copper and base metal projects. The Company's flagship project is the Knife Lake Project located in Saskatchewan, which is ranked as the #3 mining jurisdiction in the world by the Fraser Institute. The project hosts the Knife Lake deposit, which is a VMS, near-surface copper-cobalt-gold-silver-zinc deposit open along strike and at depth. There is strong discovery potential in and around the deposit area as well as at regional targets on the 85,196-hectare property. Rockridge’s goal is to maximize shareholder value through new mineral discoveries, committed long-term partnerships, and the advancement of exploration projects in geopolitically favourable jurisdictions.

Rockridge Resources Ltd.

“Jordan Trimble”

Jordan Trimble
President and Director

For further information, contact myself or:
Nick Coltura
Corporate Communications
Rockridge Resources Ltd.
Telephone: 604-687-3376
Toll Free: 800-567-8181
Facsimile: 604-687-3119
Email: info@rockridgeresourcesltd.com

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THE CONTENT OF THIS NEWS RELEASE.

Forward-Looking Statements:

Statements included in this announcement, including statements concerning our plans, intentions and expectations, which are not historical in nature are intended to be, and are hereby identified as, “forward-looking statements”. Forward-looking statements may be identified by words including “anticipates”, “believes”, “intends”, “estimates”, “expects” and similar expressions. The Company cautions readers that forward-looking statements, including without limitation those relating to the Company’s future operations and business prospects, are subject to certain risks and uncertainties that could cause actual results to differ materially from those indicated in the forward-looking statements.



Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Rockridge Resources Ltd.
Bergbau
A2PBPE
CA77406R1082
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.