• Sonntag, 22 Dezember 2024
  • 16:35 Uhr Frankfurt
  • 15:35 Uhr London
  • 10:35 Uhr New York
  • 10:35 Uhr Toronto
  • 07:35 Uhr Vancouver
  • 02:35 Uhr Sydney

Melkior's 2020 Work Plan and Updated Presentation

17.12.2019  |  The Newswire
Timmins, December 17, 2019 - Melkior Resources Inc. ("Melkior") (TSXV:MKR) is pleased to announce that it has posted an updated corporate presentation outlining the company's plans for 2020:

  • http://www.melkior.com/rch-content/uploads/Melkior-Corporate-Dec-2019.pdf

The company is pleased to outline the following Winter 2020 programs:

  1. 1.Carscallen Project (Timmins):

    1. a.Following the November 2019 drilling success (23.5g/t gold over 8 meters with .036% copper over 81 meters) the company has commenced a Down-Hole Geophysical Survey to refine our follow-up drilling targets.

    2. b.Approximately 2,400 meters of follow up drilling to test the high-grade mineralized system to depth and strike is currently being planned. We will be targeting expanding the high-grade gold zone and also locating the source of copper in the system.

  2. 2.White Lake Project (Hemlo):

    1. a.A maiden drill program of approximately 1,200 meters is being planned to test anomalies identified in the Jan 2019 VTEM and follow-up on strong gold occurrences (>1,000g/t, 19.2g/t and 82.3g/t (2018 Sample)).

The company is also pleased to outline its Spring/Summer 2020 program:

  1. 1.Maseres Project (Urban-Barry):

    1. a.A reassessment of the property data was performed by SL Exploration identifying 7 Targets of focus for 2020.

    2. b.A refined soil and boulder sampling strategy has been developed to investigate the distinct targets along the 12KM conductive trend.

Jim Deluce, CEO of Melkior remarks, "We look forward to advancing Melkior's three projects in 2020. Gold had a strong 2019 and with the recent increased M&A in the mining space we believe it is setting the stage for a strong 2020."

ON BEHALF OF THE BOARD

Keith James Deluce, CEO

For more information, please contact:

Melkior Resources Inc.

E-mail: info@melkior.com

Tel: 705-267-4000

The reader is invited to visit Melkior's web site www.melkior.com.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the

TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Copyright (c) 2019 TheNewswire - All rights reserved.


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Melkior Resources Inc.
Bergbau
A2P0Z5
CA58549W3030
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.