• Montag, 23 Dezember 2024
  • 04:24 Uhr Frankfurt
  • 03:24 Uhr London
  • 22:24 Uhr New York
  • 22:24 Uhr Toronto
  • 19:24 Uhr Vancouver
  • 14:24 Uhr Sydney

TMAC Announces Q4 2019 Operating Results

20.01.2020  |  Business Wire

TMAC Resources Inc. (TSX:TMR) (“TMAC” or the “Company”) reports fourth quarter 2019 results for production and certain operating metrics.

FOURTH QUARTER 2019 PRODUCTION SUMMARY

  • Production: 24,650 ounces of gold produced
  • Sales: 24,650 ounces of gold sold
  • Mining: 1,560 tonnes per day (“tpd”), with a grade of 7.0 g/t Au
  • Processing: 1,440 tpd, with a feed grade of 7.1 g/t Au, and 82% recovery
  • Doris underground development metres: 2,080 metres

Jason Neal, President and Chief Executive Officer of TMAC, stated, “In the fourth quarter we produced 24,650 ounces of gold, which was the low end of our expectations. As previously disclosed, available grade in the fourth quarter was negatively impacted by the deferral of mining the BTD East Limb due to rehabilitation work, which has been the most significant driver of the fourth quarter being weak. While December recovery achieved was 85% on 11.3 g/t Au, plant throughput in December was poor at 1,140 tonnes per day largely due to unplanned power generator maintenance, which required us to run only one of two concentrator lines for 14 days. The improvement in December recoveries included the initial benefits of the scavenger column project. Low throughput in December brought down average throughput for the quarter and put the lowest weighting on our best month for plant recovery.”

Jason Neal continued, “The improved development rates achieved in the third quarter were sustained in the fourth quarter. Our mining rate for the fourth quarter was 1,560 tpd at 7.0 g/t Au, which included 1,240 tonnes from Doris at 7.6 g/t Au and 29,100 tonnes at 5.0 g/t Au from surface mining the Madrid North Naartok East crown pillar. By the end of the fourth quarter, we were mining in the high-grade Doris BTD East Limb, which will contribute to first quarter production and available plant feed in 2020.”

QUARTERLY PRODUCTION RESULTS

Q4 2019

Q4 2018

2019

2018

Gold Production (oz)

24,650

34,080

139,510

110,970

Plant Throughput (tpd)

1,440

1,800

1,620

1,270

Feed Grade (g/t Au)

7.1

7.8

9.0

9.4

Recovery (%)

82

82

82

79

Mine Production (tpd)(1)

1,560(3)

2,310(2)

1,440(3)

1,300(2)

Mined Grade (g/t Au)(1)

7.0(3)

7.4(2)

9.3(3)

8.1(2)

Development Metres (m)(4)

2,080

1,620

7,720

6,470

(1) Includes incremental ore from development

(2) Includes production of 90,200 tonnes at 5.9 g/t from surface mining the crown pillar at Doris; without this material, underground production alone was 1,330 tonnes per day at a grade of 8.6 g/t for Q4 2018 and 1,060 tonnes per day at a grade of 8.6 g/t for full year 2018

(3) Includes production of 29,100 tonnes at 5.0 g/t from surface mining the crown pillar at Madrid North Naartok East; without this material, underground production alone was 1,240 tonnes per day at a grade of 7.6 g/t for Q4 2019 and 1,360 tonnes per day at a grade of 9.6 g/t for full year 2019

(4) Development metres for Doris underground only

ABOUT TMAC RESOURCES INC.

TMAC operates the Hope Bay property located in Nunavut, Canada. The property and operations are remote but not isolated, serviced by both a port and airstrip. Hope Bay is an 80 km by 20 km Archean greenstone belt that has been explored by BHP, Miramar, Newmont and TMAC over a period spanning more than 30 years. In that time, more than $1.5 billion of expenditures have been spent in exploration and evaluation, surface infrastructure, and mine and process plant development. TMAC began producing gold in early 2017 from Doris, its first mine at Hope Bay, and processed gold at the Doris Plant which originally had nameplate capacity of 1,000 tonnes per day and expanded to 2,000 tonnes per day midway through 2018. There is potential to grow TMAC’s established deposits considerably at depth, and then grow resources further through the prioritized exploration of the more than 90 other identified regional targets. TMAC is now permitted to produce from both Madrid and Boston.

FORWARD-LOOKING INFORMATION

This release contains “forward-looking information” within the meaning of applicable securities laws that is intended to be covered by the safe harbours created by those laws. “Forward-looking information” includes statements that use forward-looking terminology such as “may”, “will”, “expect”, “anticipate”, “believe”, “continue”, “potential” or the negative thereof or other variations or comparable terminology.

“Forward-looking information” is not a guarantee of future performance and management bases forward-looking statements on a number of estimates and assumptions at the date the statements are made. Furthermore, such “forward-looking information” involves a variety of known and unknown risks, uncertainties and other factors, which may cause the actual plans, intentions, activities, results, performance or achievements expressed or implied. See “Risk Factors” in the Company’s Annual Information Form dated March 11, 2019 filed on SEDAR at www.sedar.com for a discussion of these risks.



Contact

TMAC Resources Inc.

Jason Neal
President and Chief Executive Officer
647-480-3111

Lisa Wilkinson
Vice President, Investor Relations and Strategic Development
647-480-3110
Lisa.Wilkinson@tmacresources.com
www.tmacresources.com


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
TMAC Resources Inc.
Bergbau
-
-
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.