Goldcliff Resource Corp. Begins Drilling at Nevada Rand
Between six and eight core holes will be drilled as part of an approximately 1000 metre maiden drill programme. Details of the programme were discussed in a recent News Release dated December 19, 2019. Drilling is anticipated to take 30 days. Assay laboratory turn around is between six and eight weeks.
Ed Rockel, P. Geo, qualified person as defined by National Instrument 43-101 supervised the preparation and verification of the technical information contained in this release.
For further information, please contact George W. Sanders, President, at 250-764-8879, toll free at 1-866-769-4802 or email at info@directroyalty.com.
Per: “George W. Sanders”
George W. Sanders, President
Neither TSX Venture Exchange nor its Regulation Service Provider (as that term is defined in the policies of the TSX Venture Exchange) accept responsibility for the adequacy or the accuracy of this news release.