• Freitag, 22 November 2024
  • 20:01 Uhr Frankfurt
  • 19:01 Uhr London
  • 14:01 Uhr New York
  • 14:01 Uhr Toronto
  • 11:01 Uhr Vancouver
  • 06:01 Uhr Sydney

Providence Gold Mines Inc Update

09.03.2020  |  The Newswire
March 9, 2020 - Providence Gold Mines Inc. (TSXV:PHD) (OTC:PRRVF) ("the Company"), is pleased to announce that it is now proactively sourcing milling equipment to process the stockpile of material. Our trenching results to date have provided us with confidence that the stockpile represents the leftover milled material from the reported historical production up to 1916 of 200,000 ounces of gold. Due to the poor recovery methods of the time, our trenching results demonstrate that the stockpile still contains significant gold values.

The Providence Group of Gold Mines is located on patented claims near the mining friendly City of Sonora California, USA. Historically and in part referred to as the Motherlode district within the Pacific Northwest. The property has 6 historic mines was a known high grade producer up to 1916 and was reportedly shut down because of a dispute in 1916.

Five of the historic mines and associated stockpiles have yet to be assayed. Further sampling of all these existing historic mines is planned, with potential new discoveries. Connecting roadworks between these mines are already in place. Until the Company's involvement in 2017 there was no geological work of any kind completed our comprehensive geological programs have successfully identified numerous gold targets of significance near surface and beneath the known mined high grade mineralized shoots now modeled and designed for an initial 2,900 m core drill program.

Currently, further investigation of the stockpile is designed with the projection that deeper sections potentially represent earlier stages of the mine's recovered mineralization. The Company's ongoing objective is to establish overall projected grade and the best recovery methods of the material contained within the stockpile.

To date, the Company has taken 172 grab-samples including samples from 3 trenches, each 4 meters apart from the first stockpile, listed below (Table 1 to 3). The calculated weighted averages for the trench samples are as follows:

Trench 1 - 2.36 (g/t Au) over 12 meters, including 3.47 (g/t Au) over 7 meters.

Trench 2 - 2.45 (g/t Au) over 9 meters, including 4.80 (g/t Au) over 4 meters. Trench 8 - 23.16 (g/t Au) over 5 meters, including 253.60 (g/t Au) over 1 meter.

All trench samples are taken from the trench wall-floor corner at a depth of 1 meter. Each sample being 1 meter in length. Further sampling is required to determine the overall volume and average grades.

The samples were tested by Bureau Veritas Minerals of Sparks Nevada, using 30 gram lead collection fire assay fusion for total sample digestion with AA finish. All Au>10 ppm are automatically analyzed by gravimetric method

Table - 1

#

From

To

Length

Au

Trench

#

From

To

Length

Au

Trench

m

m

m

(g/t)

#

m

m

M

(g/t)

#

1

0.0

1.0

1.0

18.7

Trench 1

28

27.0

28.0

1.0

0.01

Trench 1

2

1.0

2.0

1.0

1.481

Trench 1

29

28.0

29.0

1.0

0.01

Trench 1

3

2.0

3.0

1.0

1.031

Trench 1

30

29.0

30.0

1.0

0.01

Trench 1

4

3.0

4.0

1.0

0.655

Trench 1

31

30.0

31.0

1.0

0.01

Trench 1

5

4.0

5.0

1.0

0.134

Trench 1

32

31.0

32.0

1.0

0.9

Trench 1

6

5.0

6.0

1.0

0.754

Trench 1

33

32.0

33.0

1.0

0.32

Trench 1

7

6.0

7.0

1.0

1.531

Trench 1

34

33.0

34.0

1.0

0.01

Trench 1

8

7.0

8.0

1.0

0.396

Trench 1

35

34.0

35.0

1.0

0.34

Trench 1

9

8.0

9.0

1.0

0.256

Trench 1

36

35.0

36.0

1.0

0.01

Trench 1

10

9.0

10.0

1.0

0.333

Trench 1

37

36.0

37.0

1.0

0.53

Trench 1

11

10.0

11.0

1.0

0.105

Trench 1

38

37.0

38.0

1.0

1.16

Trench 1

12

11.0

12.0

1.0

2.922

Trench 1

39

38.0

39.0

1.0

1.93

Trench 1

13

12.0

13.0

1.0

0.092

Trench 1

40

39.0

40.0

1.0

0.25

Trench 1

14

13.0

14.0

1.0

0.267

Trench 1

41

40.0

41.0

1.0

0.32

Trench 1

15

14.0

15.0

1.0

0.05

Trench 1

42

41.0

42.0

1.0

1.57

Trench 1

16

15.0

16.0

1.0

0.01

Trench 1

43

42.0

43.0

1.0

1.42

Trench 1

17

16.0

17.0

1.0

0.018

Trench 1

44

43.0

44.0

1.0

0.03

Trench 1

18

17.0

18.0

1.0

0.005

Trench 1

45

44.0

45.0

1.0

1.58

Trench 1

19

18.0

19.0

1.0

0.163

Trench 1

46

45.0

46.0

1.0

0.02

Trench 1

20

19.0

20.0

1.0

0.005

Trench 1

47

46.0

47.0

1.0

1.77

Trench 1

21

20.0

21.0

1.0

0.005

Trench 1

48

47.0

48.0

1.0

3.43

Trench 1

22

21.0

22.0

1.0

0.005

Trench 1

49

48.0

49.0

1.0

1.66

Trench 1

23

22.0

23.0

1.0

0.021

Trench 1

50

49.0

50.0

1.0

1.41

Trench 1

24

23.0

24.0

1.0

0.005

Trench 1

51

50.0

51.0

1.0

0.67

Trench 1

25

24.0

25.0

1.0

0.005

Trench 1

52

51.0

52.0

1.0

1.89

Trench 1

26

25.0

26.0

1.0

0.76

Trench 1

53

52.0

53.0

1.0

1.15

Trench 1

27

26.0

27.0

1.0

0.005

Trench 1

Table - 2

#

From

To

Length

Au

Trench

#

From

To

Length

Au

Trench

m

m

m

(g/t)

#

m

m

m

(g/t)

#

1

0.0

1.0

1.0

2.015

Trench 2

24

23.0

24.0

1.0

0.36

Trench 2

2

1.0

2.0

1.0

0.448

Trench 2

25

24.0

25.0

1.0

0.16

Trench 2

3

2.0

3.0

1.0

0.732

Trench 2

26

25.0

26.0

1.0

9.22

Trench 2

4

3.0

4.0

1.0

0.007

Trench 2

27

26.0

27.0

1.0

0.08

Trench 2

5

4.0

5.0

1.0

0.037

Trench 2

28

27.0

28.0

1.0

0.31

Trench 2

6

5.0

6.0

1.0

0.007

Trench 2

29

28.0

29.0

1.0

9.57

Trench 2

7

6.0

7.0

1.0

0.031

Trench 2

30

29.0

30.0

1.0

0.11

Trench 2

8

7.0

8.0

1.0

0.054

Trench 2

31

30.0

31.0

1.0

0.01

Trench 2

9

8.0

9.0

1.0

0.016

Trench 2

32

31.0

32.0

1.0

0.11

Trench 2

10

9.0

10.0

1.0

4.632

Trench 2

33

32.0

33.0

1.0

0.33

Trench 2

11

10.0

11.0

1.0

3.772

Trench 2

34

33.0

34.0

1.0

2.35

Trench 2

12

11.0

12.0

1.0

0.038

Trench 2

35

34.0

35.0

1.0

0.06

Trench 2

13

12.0

13.0

1.0

0.01

Trench 2

36

35.0

36.0

1.0

0.12

Trench 2

14

13.0

14.0

1.0

0.03

Trench 2

37

36.0

37.0

1.0

0.68

Trench 2

15

14.0

15.0

1.0

0.009

Trench 2

38

37.0

38.0

1.0

1.42

Trench 2

16

15.0

16.0

1.0

0.005

Trench 2

39

38.0

39.0

1.0

0.46

Trench 2

17

16.0

17.0

1.0

0.005

Trench 2

40

39.0

40.0

1.0

0.32

Trench 2

18

17.0

18.0

1.0

0.228

Trench 2

41

40.0

41.0

1.0

2.04

Trench 2

19

18.0

19.0

1.0

0.11

Trench 2

42

41.0

42.0

1.0

0.01

Trench 2

20

19.0

20.0

1.0

3.133

Trench 2

43

42.0

43.0

1.0

0.01

Trench 2

21

20.0

21.0

1.0

0.01

Trench 2

44

43.0

44.0

1.0

0.01

Trench 2

22

21.0

22.0

1.0

0.005

Trench 2

45

44.0

45.0

1.0

0.01

Trench 2

23

22.0

23.0

1.0

0.006

Trench 2

Table - 3

#

From

To

Length

Au

Trench

#

From

To

Length

Au

Trench

m

m

m

(g/t)

#

m

m

m

(g/t)

#

1

0.0

1.0

1.0

1.20

Trench 8

16

34.0

35.0

1.0

0.04

Trench 8

2

1.0

2.0

1.0

0.02

Trench 8

17

39.0

40.0

1.0

0.11

Trench 8

3

2.0

3.0

1.0

94.10

Trench 8

18

41.0

42.0

1.0

0.01

Trench 8

4

3.0

4.0

1.0

2.90

Trench 8

19

42.0

43.0

1.0

0.01

Trench 8

5

4.0

5.0

1.0

17.60

Trench 8

20

43.0

44.0

1.0

0.51

Trench 8

6

6.0

7.0

1.0

253.60

Trench 8

21

44.0

45.0

1.0

0.06

Trench 8

7

7.0

8.0

1.0

0.03

Trench 8

22

46.0

47.0

1.0

0.59

Trench 8

8

8.0

9.0

1.0

0.15

Trench 8

23

47.0

48.0

1.0

0.48

Trench 8

9

11.0

12.0

1.0

3.41

Trench 8

24

48.0

49.0

1.0

1.00

Trench 8

10

13.0

14.0

1.0

1.73

Trench 8

25

49.0

50.0

1.0

0.17

Trench 8

11

14.0

15.0

1.0

0.19

Trench 8

26

51.0

52.0

1.0

0.04

Trench 8

12

15.0

16.0

1.0

0.84

Trench 8

27

52.0

53.0

1.0

3.78

Trench 8

13

23.0

24.0

1.0

0.28

Trench 8

28

53.0

54.0

1.0

0.03

Trench 8

14

28.0

29.0

1.0

0.04

Trench 8

29

54.0

55.0

1.0

0.02

Trench 8

15

31.0

32.0

1.0

1.04

Trench 8

30

56.0

57.0

1.0

0.03

Trench 8

Qualified Person:

Brian Ray M.Sc., P.Geo. Head of Exploration and a qualified person (as defined under NI 43-101) has read and approved the technical information contained in this news release.

Private Placement Closed:

In addition, the Company reports that the previously announced financing has been closed for 850,000 units for $85,000 while the Company continues in its discussions to conclude an agreement in part with a primary investment company. Each unit consists of one common share at a price of $0.10 and one non-transferable share purchase warrant which entitles the holder to purchase one additional common share for a period of 12 months at a price of $0.15. There were no finders fees paid in connection with the financing.

We invite all shareholders and stakeholders to join the Providence Gold Mines portal on 8020 Connect. Join here: http://b.link/Providence


ON BEHALF OF THE BOARD

"Ronald Coombes"
Ronald Coombes, President & CEO



FOR FURTHER INFORMATION PLEASE CONTACT:

Ronald Coombes
Mobile: 1 (604)724-2369, Office 1 (604)688-8200
Email: info@providencegold.com



Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release

Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Providence Gold Mines Inc.
Bergbau
A2DUSU
CA7437541039
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.