Bonterra Resources Inc. Intersects 13.76 g/t Au Over 4.5 Metres at Gladiator
The Company suspended its winter 2020 drill program on March 17 due to the Coronavirus Pandemic and on April 2 reported assays received to date from drilling completed at the Gladiator deposit. All assays for the Company's exploration programs are completed at the Company's Bachelor Mine assay laboratory. While maintaining safe work practices, the assay lab is currently operating on a 4 hour per day basis and has reported partial results of hole BA-20-07 drilled at the Gladiator deposit. The results reported include an intersection of 5.93 g/t Au over and intersection length of 11.0 m (estimated true width of 3.97 m) which includes a higher-grade interval of 13.76 g/t Au over an intersection length of 4.5 m (estimated true width of 1.5 m). Assays remain pending from the rest of hole BA-20-07 and parts of other holes completed at Gladiator. Hole BA-20-07 is presented on the attached cross section.
Greg Gibson, President and CEO of the Company commented "This recent result on the north zone occurs approximately 110 m below surface on part of the north zone where the drilling remains relatively widely spaced. This intercept supports our current strategy to both expand and in-fill near surface resources at Gladiator to advance the Gladiator deposit."
Analyses and QAQC
Gold analyses of Gladiator drill core are completed at the Bachelor Mine assay laboratory. The Company employs an industry standard QAQC program that includes duplicate analyses from pulp and coarse rejects and the use of Certified Reference Materials and blanks. Check assays on a minimum of 10% of the samples are completed at ALS Laboratories ("ALS") in Val-d'Or. Check assays for hole BA-20-07 and other holes in progress at the Bachelor lab will be completed at ALS when regular work activities resume.
Boris Artinian, P.Geo and Chief Geologist for the Company supervises all exploration activities on the Gladiator project. Mr. Artinian is a Qualified Person as defined by NI43-101. Jamie Lavigne, P.Geo and VP Exploration for the Company has approved the information contained in this release. Mr. Lavigne is a Qualified Person as defined by NI43-101.
Vertical Cross Section
To view an enhanced version of this graphic, please visit:
https://orders.newsfilecorp.com/files/1528/54855_460a47bcb4bb8bea_001full.jpg
FOR ADDITIONAL INFORMATION:
Investor relations: Allan Folk
ir@btrgold.com
2872 Sullivan Road, Suite 2, Val d'Or, Quebec J9P 0B9
819-825-8676 | Website: www.bonterraresources.com
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Cautionary and Forward-Looking Statements
This press release contains "forward-looking information" that is based on Bonterra's current expectations, estimates, forecasts and projections. This forward-looking information includes, among other things, statements with respect to Bonterra's exploration and development plans. The words "will", "anticipated", "plans" or other similar words and phrases are intended to identify forward-looking information. This forward-looking information includes namely, information with respect to the planned exploration programs and the potential growth in mineral resources. Exploration results that include drill results on wide spacings may not be indicative of the occurrence of a mineral deposit and such results do not provide assurance that further work will establish sufficient grade, continuity, metallurgical characteristics and economic potential to be classed as a category of mineral resource. The potential quantities and grades of drilling targets are conceptual in nature and, there has been insufficient exploration to define a mineral resource, and it is uncertain if further exploration will result in the targets being delineated as mineral resources. Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause Bonterra's actual results, level of activity, performance or achievements to be materially different from those expressed or implied by such forward-looking information. Such factors include but are not limited to: uncertainties related exploration and development; the ability to raise sufficient capital to fund exploration and development; changes in economic conditions or financial markets, environmental and other judicial, regulatory, political and competitive developments; technological or operational difficulties or inability to obtain permits encountered in connection with exploration activities; and labour relations matters. This list is not exhaustive of the factors that may affect our forward-looking information. These and other factors should be considered carefully and readers should not place undue reliance on such forward-looking information.