• Sonntag, 24 November 2024
  • 12:05 Uhr Frankfurt
  • 11:05 Uhr London
  • 06:05 Uhr New York
  • 06:05 Uhr Toronto
  • 03:05 Uhr Vancouver
  • 22:05 Uhr Sydney

Desert Mountain Energy Receives Drill Permits for First Two Holes of its Helium Exploration Program In Arizona's Holbrook Basin

15.05.2020  |  The Newswire
Vancouver - Desert Mountain Energy Corp. (the "Company") (TSXV:DME), (OTC:DMEHF), Frankfurt: QM01)) is pleased to announce that the Arizona Oil & Gas Conservation Commission today granted the Company's drill permits for the initial two holes in its planned helium exploration program in Arizona's Holbrook Basin. The two initial holes are situated in the Eastern portion of the Basin some 35 mi. from the iconic Pinta Dome, Navajo Springs and E. Navajo Springs gas fields. These three fields produced an aggregate of 9.23 Bcf of gas grading 8-10% Helium over a 15-year period, among the richest helium fields in the world.

The two holes are planned to be simple, vertical gas wells drilled to a maximum depth of 2790 ft. They will test a total of five possible pay zones which the Company believes are highly prospective and range in depth from 1020 ft. to 2690 ft. These holes offset an old potash well drilled in 1965 by a mineral resource company (ARKLA Exploration NMA #7) as a stratigraphic test that blew out due to extreme unanticipated gas pressure. Targets for the Company's upcoming program were developed over the past eighteen months as a result of comprehensive studies of historic geologic reports and drill log data, field studies and mapping, a 2-D seismic study and most recently, an advanced Remote Sensing Study utilizing infrared spectral analysis to locate certain neutron-deficient target isotopes generally associated with the presence of Helium. This airborne geophysics survey provided strong results that corroborated our other targeting work. (See PR dated April 20, 2020).

The Company will be finalizing contracts with a seasoned drilling contractor shortly for a rig and will announce a tentative June start date for the program in the near future. The drill program will be overseen by the Company's Head of Exploration and Technical Operations, Robert Rohlfing, a highly experienced driller and executive who has drilled over 250 wells in his career with a very high success rate. According to Mr. Rohlfing, "We are very pleased with the Commission's decision to greenlight the Company's drill permits at this time. We were very careful in our initial targeting decisions to choose areas that provide for the least environmental impact at the surface together with the optimal locations downhole for successful commercial Helium production without the need for fracking."


About Desert Mountain Energy

The Company is an exploratory resource company engaged in exploration and development of helium, oil & gas and mineral properties in the Southwestern United States. Until September 5, 2018, the Company also owned the Yellowjacket Gold Project in Atlin, British Columbia, which it had been developing. The Company has its executive offices in Vancouver, Canada. The Company was incorporated under the laws of the Province of British Columbia, on April 30, 2008, and was formerly named African Queen Mines Ltd. It initially received certain southern African assets in a spin off transaction related to the acquisition of Pan African Mining Corp. by Asia Thai Mining Co., Ltd.


ON BEHALF OF THE BOARD OF DIRECTORS OF Desert Mountain Energy Corp.

"Irwin Olian"
Irwin Olian, Chairman & CEO



For more information, contact:

Desert Mountain Energy Corp.
Irwin Olian, President and CEO
E-mail: tigertail@desertmountainenergy.com
Phone: (604) 788-0300



The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of the content of the information contained herein. The statements made in this press release may contain certain forward-looking statements that involve a number of risks and uncertainties. Actual events or results may differ from the Company's expectations.
Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Desert Mountain Energy Corp.
Bergbau
A2JHVK
CA25043D1078
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.