• Sonntag, 22 Dezember 2024
  • 19:57 Uhr Frankfurt
  • 18:57 Uhr London
  • 13:57 Uhr New York
  • 13:57 Uhr Toronto
  • 10:57 Uhr Vancouver
  • 05:57 Uhr Sydney

Eagle Plains Acquires 100% Interest in Donna Gold Project

02.07.2020  |  Accesswire

CRANBROOK, July 2, 2020 - Eagle Plains Resources Ltd. (TSXV:EPL) ("EPL" or "Eagle Plains") has executed an agreement with Summa Silver (formerly Pinnacle North Gold Corp.) whereby Summa has relinquished its option on the Donna property located 60km east of Vernon, BC. The claims are now held 100% by Eagle Plains, subject to an underlying 2% NSR royalty.

Donna Project Summary

The core claims of the Donna property were acquired in 2016 by Eagle Plains through an agreement with ALX Uranium Corp., with additional tenures subsequently added through staking. The Property is located in the Monashee Mountains within the source headwaters of the historic Kettle River and Yeoward Creek placer gold camps. The claims lie within one of the largest clusters of anomalous values in gold and typical associated pathfinder elements identified in the British Columbia Regional Geochemical Surveys stream-sediment program carried out in the joint Federal - Provincial programs from 1985 -1990. Active placer mining activity occurs along creeks draining the property area. Drilling completed in 2011 returned intercepts of up to 2.0 m grading 8.72 g/t gold.

The Property is underlain by a sequence of marine sediments comprising carbonaceous black argillite, limestone, and volcanic rocks of Permian to Lower Triassic age. Locally these rocks were intruded by stocks and plugs of mafic-intermediate composition. The project area is considered to hold good potential to host intrusive-related gold mineralization.

Donna Project History

The Donna showing was discovered in 1973 by El Paso Mining and Milling Company ("El Paso"), during follow-up of anomalous gold values generated by a regional stream sediment sampling program. Trenching by El Paso in 1974 in an area defined by an As-Au-Ag-Pb soil anomaly exposed numerous narrow quartz veins which returned assays including 29.5 g/t Au and 89.4 g/t Ag over 2.29 m in Trench 4, and 122.4 g/t Au and 39.3 g/t Ag over 0.8 m in Trench 8 (Ainsworth, 2010).

Subsequent work carried out between 1975 and 2009 by previous operators consisted of trenching, silt sampling, extensive soil and biogeochemical surveying and limited drilling. Between 2009 - 2011 ESO Uranium (later named Alpha Minerals) conducted exploration programs consisting of reconnaissance stream sediment, rock geochemical and detailed soil surveys to define targets for a total of 20 diamond drill holes. Alpha and Interconnected Ventures Corporation carried out the most recent work on the property in 2014 comprising an induced polarization ("IP") geophysical survey followed by a four-hole, 492m diamond drilling program. All four holes intersected gold mineralization. The best intercept was in DDH14-21 which returned 2.0 m of 8.72 g/t gold. This drill collar is located 1.5 km west of the area of historic trenching and drilling, significantly expanding the area of known gold mineralization (Koffyberg, 2015).

The above results were taken directly from the BCMINFILE descriptions and assessment reports filed with the BCEMPR. Management cautions that historical results were collected and reported by past operators and have not been verified nor confirmed by a Qualified Person, but form a basis for ongoing work at the Donna property.

Since acquiring the property in 2016, Eagle Plains has carried out annual systematic exploration including a 470 line-km geophysical survey in 2017 which followed a comprehensive compilation of all historical work. The property boasts a GIS database consisting of rock, soil, silt, till, trench and drill-hole results within and adjacent the property area.

Pinnacle North optioned the property in January, 2019 and commenced a single drill-hole on the property in October, 2019. The hole was not completed to target depth due to budgetary constraints.

Technical aspects of this news release were reviewed and approved by Charles C. Downie, P.Geo., "qualified person" for the purposes of National Instrument 43-101-Standards of Disclosure for Mineral Projects, and a director of Eagle Plains Resources Ltd.

About Eagle Plains Resources

Based in Cranbrook, B.C., Eagle Plains continues to conduct research, acquire and explore mineral projects throughout western Canada. The Company is committed to steadily enhancing shareholder value by advancing our diverse portfolio of projects toward discovery through collaborative partnerships and development of a highly experienced technical team. Managements' current focus is to preserve its treasury while advancing its most promising exploration projects. In addition, Eagle Plains continues to seek out and secure high-quality, unencumbered projects through research, staking and strategic acquisitions. Since 2012, Eagle Plains has added to its portfolio a number of new projects exceeding 130,000 ha targeting mainly gold, uranium and base-metals in Saskatchewan, a highly-prospective mining jurisdiction which was recently recognized by the Fraser Institute as one of the top 3 jurisdictions in the world in terms of Investment Attractiveness. Throughout the exploration process, our mission is to help maintain prosperous communities by exploring for and discovering resource opportunities while building lasting relationships through honest and respectful business practices.

Expenditures from 2011-2019 on Eagle Plains-related projects exceed $20M, most of which was funded by third-party partners. This exploration work resulted in approximately 30,000m of diamond-drilling and extensive ground-based exploration work facilitating the advancement of numerous projects at various stages of development.

On behalf of the Board of Directors

"Tim J. Termuende"
President and CEO

For further information on EPL, please contact Mike Labach at
1 866 HUNT ORE (486 8673)
Email: mgl@eagleplains.com or visit our website at http://www.eagleplains.com

Cautionary Note Regarding Forward-Looking Statements

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. This news release may contain forward-looking statements including but not limited to comments regarding the timing and content of upcoming work programs, geological interpretations, receipt of property titles, potential mineral recovery processes, etc. Forward-looking statements address future events and conditions and therefore, involve inherent risks and uncertainties. Actual results may differ materially from those currently anticipated in such statements.

SOURCE: Eagle Plains Resources Ltd.



View source version on accesswire.com:
https://www.accesswire.com/595836/Eagle-Plains-Acquires-100-Interest-in-Donna-Gold-Project


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Eagle Plains Resources Ltd.
Bergbau
588696
CA2699062022
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.