• Freitag, 22 November 2024
  • 01:41 Uhr Frankfurt
  • 00:41 Uhr London
  • 19:41 Uhr New York
  • 19:41 Uhr Toronto
  • 16:41 Uhr Vancouver
  • 11:41 Uhr Sydney

Atico Mining Corp. Produces 5.55 Million Pounds of Cu and 2,487 Ounces of Au in Q3 2020

19.10.2020  |  Globenewswire Europe
Successful Production Continuity during Covid-19 Restrictions; Maintaining Production Guidance for 2020

VANCOUVER, Oct. 19, 2020 - Atico Mining Corp. (the “Company” or “Atico”) (TSX.V: ATY | OTC: ATCMF) announces its operating results for the three months ended September 30, 2020 from its El Roble mine. Production for the quarter totaled 5.55 million pounds of copper and 2,487 ounces of gold in concentrates, a decrease of 3% for copper and 25% for gold over the same period in 2019.

“The production results for the quarter were mostly in line with our 2020 objectives while the mine continued to operate under strict preventative protocols and health policies. The decrease in gold production is mainly driven by a lower head grade, expected in the mine plan for the quarter while operations still remain on track for record revenues in the second half of the year,” said Fernando E. Ganoza, CEO. “We will continue operating with the highest health and safety standards during these unprecedented times, while at the same time keeping a focus on delivering our 2020 production guidance.”

Third Quarter Operational Highlights

  • Production of 5.55 million pounds of copper contained in concentrates; a decrease of 3% over Q3 2019.
  • Production of 2,487 ounces of gold contained in concentrates; a decrease of 25% over Q3 2019.
  • Average processed tonnes per day of 860, no significant change over Q3 2019.
  • Copper head grade of 3.74%, an increase of 2% over Q3 2019.
  • Gold head grade of 1.87 grams per tonne; a decrease of 20% over Q3 2019.
  • Copper and gold recovery of 91.4% and 56.3%; an increase of 2% for copper and a decrease of 25% for gold over Q3 2019.

Third Quarter Operational Review

Overall production was mostly in line with Company budget for the third quarter. The decrease in gold head grade and production is primarily explained by the mine plan for the quarter and to a lesser extent by the lower than anticipated gold recovery. The operation remains on track to deliver on set guidance throughout the remainder of the year.

The Company continues to closely monitor developments around the Covid-19 pandemic and continues to maintain strict preventative measures at the El Roble mine site, La Plata project, as well as our corporate offices to safeguard the health of its employees, while continuing to operate effectively and responsibly in its communities.

Third Quarter Operational Details

Q3 2020 Total Q3 2019 Total % Change
Production (Contained in Concentrates)
Copper (000s pounds) 5,550 5,712 -3 %
Gold (ounces) 2,487 3,320 -25 %
Mine
Tonnes of ore mined 71,993 74,462 -3 %
Mill
Tonnes processed 73,603 76,532 -4 %
Tonnes processed per day 860 863 Nil
Copper grade (%) 3.74 3.66 2 %
Gold grade (g/t) 1.87 2.34 -20 %
Recoveries
Copper (%) 91.4 92.5 -1 %
Gold (%) 56.3 58.0 -3 %
Concentrates
Copper and Gold Concentrates (dmt) 11,956 11,757 2 %
Payable copper produced (000s lbs) 5,273 5,426 -3 %
Note: Metal production figures are subject to adjustments based on final settlement.

Concentrate Inventory

The number of shipments the Company can export in any given quarter depends on several variables some of which the Company does not control, hence there may be an inherent variability in tonnes shipped quarter to quarter.

Q3 2020 Total
Amounts in dry metric tonnes
Opening inventory 2,655
Production 11,956
Sales 9,285
Number of shipments 1
Closing inventory 5,326
Note: Concentrate figures are subject to adjustments based on final settlement.

El Roble Mine

The El Roble mine is a high grade, underground copper and gold mine with nominal processing plant capacity of 1,000 tonnes per day, located in the Department of Choco in Colombia. Its commercial product is a copper-gold concentrate.

Since obtaining control of the mine on November 22, 2013, Atico has upgraded the operation from a historical nominal capacity of 400 tonnes per day.

El Roble has Proven and Probable reserves of 1.47 million tonnes grading 3.40% copper and 1.88 g/t gold, at a cut-off grade of 1.93% copper equivalent as of June 30th, 2018. Mineralization is open at depth and along strike and the Company plans to further test the limits of the deposit.

On the larger land package, the Company has identified a prospective stratigraphic contact between volcanic rocks and black and grey pelagic sediments and cherts that has been traced by Atico geologists for ten kilometers. This contact has been determined to be an important control on VMS mineralization on which Atico has identified numerous target areas prospective for VMS type mineralization occurrence, which is the focus of the current surface drill program at El Roble.

Qualified Person

Mr. Thomas Kelly (SME Registered Member 1696580), advisor to the Company and a qualified person under National Instrument 43-101 standards, is responsible for ensuring that the technical information contained in this news release is an accurate summary of the original reports and data provided to or developed by Atico.

About Atico Mining Corporation

Atico is a growth-oriented Company, focused on exploring, developing and mining copper and gold projects in Latin America. The Company generates significant cash flow through the operation of the El Roble mine and is developing its high-grade La Plata VMS project in Ecuador. The Company is also pursuing additional acquisition of advanced stage opportunities. For more information, please visit www.aticomining.com.

ON BEHALF OF THE BOARD

Fernando E. Ganoza
CEO
Atico Mining Corp.

Trading symbols: TSX.V: ATY | OTC: ATCMF

Investor Relations
Igor Dutina
Tel: +1.604.633.9022

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

No securities regulatory authority has either approved or disapproved of the contents of this news release. The securities being offered have not been, and will not be, registered under the United States Securities Act of 1933, as amended (the ‘‘U.S. Securities Act’’), or any state securities laws, and may not be offered or sold in the United States, or to, or for the account or benefit of, a "U.S. person" (as defined in Regulation S of the U.S. Securities Act) unless pursuant to an exemption therefrom. This press release is for information purposes only and does not constitute an offer to sell or a solicitation of an offer to buy any securities of the Company in any jurisdiction.

Cautionary Note Regarding Forward Looking Statements

This announcement includes certain “forward-looking statements” within the meaning of Canadian securities legislation. All statements, other than statements of historical fact, included herein, without limitation the use of net proceeds, are forward-looking statements. Forward-looking statements involve various risks and uncertainties and are based on certain factors and assumptions. There can be no assurance that such statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from the Company’s expectations include uncertainties relating to interpretation of drill results and the geology, continuity and grade of mineral deposits; uncertainty of estimates of capital and operating costs; the need to obtain additional financing to maintain its interest in and/or explore and develop the Company’s mineral projects; uncertainty of meeting anticipated program milestones for the Company’s mineral projects; the world-wide economic and social impact of Covid-19 is managed and the duration and extent of the coronavirus pandemic is minimized or not long-term; disruptions related to the Covid-19 pandemic or other health and safety issues, or the responses of governments, communities, the Company and others to such pandemic or other issues; and other risks and uncertainties disclosed under the heading “Risk Factors” in the prospectus of the Company dated March 2, 2012 filed with the Canadian securities regulatory authorities on the SEDAR website at www.sedar.com.


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Atico Mining Corp.
Bergbau
A1JVJW
CA0475591099
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.