Huntsman Exploration Inc. Outlines Plan for Multi-Phase Drill Program at Baxter Spring Gold Project
Concurrent to drilling activities, an extensive ground program to support planning and permitting for the Phase II of drilling is also being developed. The Company intends to aggressively follow-up on historical work targeting both known and underexplored areas of the property.
Peter Dickie, President and CEO for Huntsman, commented, "We are excited to commence activities at Baxter Spring in Nevada - a project that has shown evidence of both moderate-grade, disseminated gold and high-grade structure. Field work at Baxter Spring will mean Huntsman will be operating on two fronts, with further drilling at the Canegrass high-grade nickel project in Western Australia set to commence this month."
Project Highlights and Next Steps
Baxter Spring Gold Project, Nevada
- Drill tested mineralization with 128 historical RC and core holes.
- Oxide and vein structures (historic results).
- Numerous untested targets identified.
- Historically, only shallow drill tested, with potential to find additional mineralization at depth.
Baxter Spring is a historically explored property in an area of Nevada that has demonstrated substantial gold endowment. Nearby projects include the historical Manhattan mining camp and the current Round Mountain Mine. Previous work on Baxter Spring has produced both high grade intervals in drilling (eg. BX-13: 8.81 g/t over 7.6m and BS-8: 60.4 g/t Au over 12.2 m incl 240 g/t Au over 3.1 m) in addition to several intervals of moderate grade, over substantial widths (BSC-1: 0.71 g/ Au over 69.04m). Numerous areas of the property have indicated geochemical targets that have not been fully explored, and a number of areas have not seen any exploration to date.
Neil McCallum, P.Geo., of Dahrouge Geological Consulting Ltd., a director of the Company and a qualified person as defined by National Instrument 43-101, supervised the preparation of the technical information in this news release with respect to Baxter Spring and Flint projects.
On Behalf of the Board of Huntsman Exploration Inc.
Peter Dickie
President and Chief Executive Officer
For more information, please contact 1-855-584-0160 or info@huntsmanx.com.
Neither TSX Venture Exchange, the Toronto Stock Exchange nor their Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Forward Looking Statements: Statements contained in this news release that are not historical facts are forward-looking statements, which are subject to a number of known and unknown risks, uncertainness and other factors that may cause the actual results to differ materially from those anticipated in our forward-looking statements. Although we believe that the expectations in our forward-looking statements are reasonable, actual results may vary, and we cannot guarantee future results, levels of activity, performance or achievements.
SOURCE: Huntsman Exploration Inc.