Rokmaster Intersects 26.20 metres of 4.53 g/t AuEq, including 3.30 metres of 10.09 g/t AuEq at Revel Ridge

29.03.2021  |  CNW

VANCOUVER, March 29, 2021 - Rokmaster Resources Corp. (TSXV: RKR) (OTCQB: RKMSF) (FSE: 1RR1) ("Rokmaster" or the "Company") is pleased to present assay results of diamond drill holes RR20-12 to RR21-33 from its ongoing drill program at the Revel Ridge Project. Results demonstrate the remarkable continuity of structurally controlled gold-polymetallic mineralization in the Revel Ridge Main Zone ("RRMZ") over a 1.2 kilometre vertical and more than 1.2 kilometre horizontal distance, with significant silver-zinc grades in an expanding Revel Ridge Yellowjacket Zone ("RRYZ").

Highlights & Update:

  • Successful RRMZ intercepts over broad step outs beyond current resource
    • 4.53 g/t AuEq over 26.20 m in hole RR21-28 incl. 10.09 g/t AuEq over 3.3 m
    • 3.18 g/t AuEq over 10.88 m in hole RR20-16 incl. 7.14 g/t AuEq over 1.48 m
    • 2.05 g/t AuEq over 12.70 m in hole RR21-25 incl. 3.83 g/t AuEq over 2.62 m
    • 3.41 g/t AuEq over 8.18 m in hole RR20-14 incl. 8.95 g/t AuEq over 2.93 m
    • 3.16 g/t AuEq over 7.63 m in hole RR21-22 incl. 7.79 g/t AuEq over 2.62 m

  • Significant expansion of known RRYZ silver-zinc mineralization
    • 2.60 g/t AuEq or 197.3 g/t AgEq over 9.92 m in hole RR21-28, 750 m from previously known RRYZ mineralization.
    • 5.93 g/t AuEq or 450.4 g/t AgEq over 2.90 m in hole RR20-18, 200 m from previously known RRYZ mineralization.

  • Drilling continues - additional assay results pending
  • Mineralization remains open at depth and on strike for all zones

John Mirko, President and CEO of Rokmaster Resources commented, "With 85% of drill holes intercepting above-threshold NSR gold equivalent grades, with both impressive widths and over broad step outs, we're pleased to see that the data supports the potential expansion of our known gold equivalent resource. What's further impressive is we've now confirmed this portion (tested from existing underground workings only) of RRMZ mineralization over 1.2 kilometre vertical and horizontal distances. With on-strike surface occurrences suggesting the zones could continue for eight to nine kilometres, our confidence in continuing to successfully intercept high-grade mineralization grows as we learn more about these deposits."

Since late last September, Rokmaster has completed 35 diamond drill holes (the majority of which are located outside of the current resource) in the 2020 and 2021 programs to date, totalling 13,448 m of NQ™ sized drill core. The plan map illustrating the locations of all of the drillholes collared to date in the 2020 and 2021 programs is presented on the digital link Figure 1. Plan View Collar Locations, the block model diagram showing the location of all drillholes completed in 2020 and 2021 is presented on the digital link Figure 2. RRMZ Block Model, and the Inclined Long Section showing 2020-2021 drill hole locations is presented on the digital link Figure 3. RRMZ inclined Longitudinal Section. Figures 1, 2 and 3 are also available on www.rokmaster.com/projects/revel-ridge/

The results obtained from 21 drillholes, RR21-12 to RR21-33, are documented in this press release.1, 2. These drillholes tested a large volume of the RRMZ over a strike length exceeding 1,200 m. The results of these drillholes are compiled on Table 1. The significance of these results is summarized here:

  1. Rokmaster drilling undertook broad step outs, with 85% of holes intercepting above-threshold grades: Out of 21 drillholes, 18 (85%) cut gold-equivalent grades and widths in drill core which would meet the threshold of contributing to the gold equivalent net resource, using the NSR cut-off grades as documented in the 2020 PEA Technical Report filed on SEDAR (Rokmaster NR dated December 8, 2020). This observation is even more significant as the drillholes targeting the RRMZ utilized broad step outs averaging 82 m to a maximum of 130 m between pierce points throughout the RRMZ.

  2. Significant zinc-silver mineralization was encountered 750 m southeast of the historically defined RRYZ: Strong, thick, RRYZ silver-zinc rich mineralization has re-emerged. This is particularly true with respect to DDH RR21-28 which cut a drill indicated width of 9.92 m of 2.6 g/t AuEq or 197.17 g/t AgEq in the newly discovered extension of the RRYZ and is followed by a superb RRMZ intersection of 26.2 m of 4.54 g/t AuEq or 344.17 g/t AgEq. Strong RRYZ style mineralization is developing 750 m to the southeast of the original silver rich RRYZ zone discovered in 1991. A zinc-silver intersection obtained from DDH RR21-25 has some similarities in the alteration and sulphide mineralogy to the thicker silver-zinc rich intersection obtained in RR21-28. The two intersections are separated by a distance of 100 m and with the zone remaining open along the north directed plunge line. It is unequivocal, that new mineralized zones are being, and remain to be discovered, at Revel Ridge.

  3. Mineralization continues to exhibit remarkable continuity: Within the RRMZ the current technical data again suggests that the intensity of the deformation zone and the mineralogy and grade of mineralization is remaining remarkably consistent over long vertical distances, with DDH RR21-14 coring 2.93 m of 8.95 g/t AuEq. The intersection obtained in DDH RR21-30 is approximately 1.2 kms in elevation below the mineralized surface trace of the RRMZ Mineralization. Preliminary technical data may suggest that gold grades when viewed as grade thickness profiles are increasing to the northwest.

  4. Rokmaster has successfully expanded the area of known mineralization: The location of the 2020 to 2021 drillholes in the Rokmaster drill program are outlined on the attached Figure 2. RRMZ 3-D Block Model, also available at www.rokmaster.com. The data convincingly demonstrates that the Rokmaster drill program has successfully tested larger volumes of mineralized rock, in a shorter period of time, than at any period in the 115-year exploration history of the Revel Ridge deposit.

Table 1. Summary of the Selected Assay Results of Revel Ridge Main Zone Mineralization


DDH

From
(m)

To
(m)

Length
(m)

Au
g/t

Ag
g/t

Pb
%

Zn
%

Zone

AuEq
g/t

AgEq
g/t


RR20-12

337.30

341.90

4.60

2.67

17.96

0.92

1.51

RRMZ

3.98



including

339.88

340.93

1.05

11.29

77.00

3.96

6.03

RRMZ

16.71















and

358.50

362.30

3.80

3.72

7.99

0.14

0.24

RRFW

3.99



including

358.50

359.45

0.95

12.94

9.00

0.13

0.51

RRFW

13.35















RR20-13

Hole Abandoned due to extreme azimuth deviation



















RR20-14

250.00

251.75

1.75

8.85

11.50

0.38

0.81

RRHW

9.53



including

250.00

250.70

0.70

21.77

28.00

0.95

2.00

RRHW

23.46















and

305.82

314.00

8.18

2.15

15.54

0.51

1.83

RRMZ

3.41



including

305.82

308.75

2.93

5.73

36.77

1.36

4.69

RRMZ

8.95



and including

305.82

306.35

0.53

10.84

141.00

5.58

7.59

RRMZ

18.48















RR20-15

407.43

410.10

2.67

7.34

63.20

3.943

2.87

RRMZ

11.10















RR20-16

259.50

270.38

10.88

0.93

23.10

1.10

3.22

RRMZ

3.18



including

259.50

263.45

3.95

0.08

40.84

2.01

5.82

RRMZ

4.15



and including

267.90

269.38

1.48

5.80

20.13

0.80

1.61

RRMZ

7.14















and

285.38

289.20

3.82

3.78

15.31

0.28

0.97

RRFW

4.55



including

288.55

289.20

0.65

10.80

43.00

1.44

5.56

RRFW

14.55















RR20-18

264.20

267.10

2.90

0.08

44.57

2.64

8.98

RRYZ

5.93

450.4














and

343.55

347.50

3.95

2.88

26.58

0.96

2.05

RRMZ

4.58



including

347.05

347.50

0.45

19.67

0.50

0.05

0.01

RRMZ

19.70















RR20-19

330.35

337.30

6.95

2.78

3.50

0.17

0.47

RRFW

3.11



including

330.35

330.80

0.45

39.25

29.00

1.81

6.08

RRFW

43.21















RR20-20

358.70

361.11

2.41

2.81

19.57

0.96

4.34

RRMZ

5.49



including

359.73

361.11

1.38

4.33

31.94

1.49

7.45

RRMZ

8.84















RR21-21

441.40

443.50

2.10

2.08

23.10

1.28

3.19

RRMZ

4.39















RR21-22

472.22

479.85

7.63

2.40

7.91

0.30

1.15

RRMZ

3.16



including

472.22

474.84

2.62

5.74

19.58

0.81

3.14

RRMZ

7.79















RR21-23

526.05

527.05

1.00

7.22

4.00

0.32

0.41

RRMZ

7.59















RR21-25

385.60

398.30

12.70

0.71

9.51

0.36

2.29

RRMZ

2.05



including

385.60

395.12

9.52

0.70

10.92

0.41

2.79

RRMZ

2.32



and including

392.50

395.12

2.62

0.05

10.62

0.49

7.36

RRMZ

3.83















RR21-26

386.70

388.80

2.10

4.29

33.43

0.69

0.44

RRMZ

5.21















RR21-28

382.20

392.12

9.92

0.06

19.04

1.34

3.73

RRYZ

2.60

197.3


including

387.50

392.12

4.62

0.12

37.67

2.66

6.83

RRYZ

4.88

370.4


and including

387.50

388.50

1.00

0.34

116.00

8.94

17.48

RRYZ

13.63

1035.5














and

425.10

451.30

26.20

1.73

14.38

0.75

4.95

RRMZ

4.53

344.3


including

425.60

428.90

3.30

5.11

15.50

0.68

9.61

RRMZ

10.09

766.4


and including

449.50

451.30

1.80

12.93

19.67

0.56

0.50

RRMZ

13.65

1036.6














RR21-29

299.53

302.73

3.20

4.88

13.89

0.54

0.40

RRMZ

5.46



including

299.53

300.23

0.70

19.67

19.00

0.92

0.42

RRMZ

20.48















RR21-30

541.85

545.85

4.00

0.88

26.95

2.00

2.42

RRMZ

3.17



including

542.85

543.65

0.80

4.24

105.00

8.11

9.03

RRMZ

13.09















RR21-31

334.05

336.45

2.40

1.71

43.49

2.98

3.29

RRMZ

5.02















RR21-32

348.85

351.00

2.15

0.10

23.77

1.08

5.82

RRMZ

3.57















and

428.00

431.90

3.90

1.31

12.00

0.61

2.96

RRYZ

3.10















RR21-33

349.35

355.22

5.87

2.65

21.19

0.21

0.01

RRMZ

3.02



including

353.30

355.22

1.92

4.76

50.48

0.46

0.03

RRMZ

5.62



Reported widths of mineralization are drill hole intervals or core length recovered. Insufficient data exists to permit the calculation of true widths of the reported mineralized intervals.

*The metal values used in the gold equivalent calculations of US$1,561/oz Au, US$20.55/oz silver, US$0.91/lb lead and US$1.07/lb zinc, are based on the consensus average long-term price forecasts published by a major commercial bank at the end of October, 2020, as per the Technical Report, with an effective date of December 8, 2020 by Micon International Limited, entitled: An Updated Preliminary Economic Assessment Of The Revel Ridge Project, Revelstoke, BC, Canada, for Rokmaster Resources Corp. The formula used to calculate gold equivalence for the RRMZ and RRFZ is: AuEq = Au g/t + (Ag g/t x 0.013) + (Pb% x 0.4) + (Zn% x 0.47). The formula used to calculate silver equivalence for the RRYJ is: AgEq = Ag g/t + (Au g/t x 75.96) + (Pb% x 30.3) + (Zn% x 35.6).

Quality Assurance/Quality Control. Dr. Jim Oliver, P. Geo., supervised all aspects of the drilling and sampling undertaken in the 2020 underground diamond drill program. All samples have been collected from ½ NQ™ core, sawn with a diamond saw with the sample intervals marked by technical personnel. A full QAQC program using blanks, standards and duplicates was utilized to monitor analytical accuracy and precision. The samples were sealed on site and shipped to MSA Labs in Langley, British Columbia. MSA is an ISO 17025 (Testing and Calibration Laboratory) and an ISO 9001 (Quality Management System) Certified Laboratory. Core samples were crushed to 2 mm and a 250 gram sub sample was pulverized with 85% of the sample passing 75 microns. The sub sample was analysed using a combination of MSA Labs FAS211 for Au and ICP-240 (4 acid digestion) for silver, base metals and other trace elements. FAS211 for gold is an ore grade fire assay of a 30 g pulp with an AAS finish with a detection range between 0.01 and 100 ppm). ICP-240 utilizes four acid digestion and provides ore grade analytical data on silver, base metals and 26 other elements.

Footnotes:

  1. DDH RR21-13 is excluded from this press release. The drill hole was abandoned well short of its proposed target depth due to excessive borehole deviation and is excluded from Table 1.
  2. An NSR value of approximately $125 over a width of 2.5 m was the criteria used in determining whether a drillhole had a reasonable potential of contributing to the net gold equivalent resource. DDH's RR21-17, RR21-24 and RR21-27 do not meet that criteria and are excluded from Table 1.

The technical information in this news release has been prepared in accordance with Canadian regulatory requirements as set out in National Instrument 43-101 and reviewed and approved by Mark Rebagliati, P. Eng., FEC, who is independent of Rokmaster.

On Behalf of the Board of Directors of

Rokmaster Resources Corp.

John Mirko,
President & Chief Executive Officer

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term in defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this press release.

CAUTIONARY NOTE REGARDING FORWARD LOOKING STATEMENTS: This news release may contain forward-looking information within the meaning of applicable securities laws ("forward-looking statements"). Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects," "plans," "anticipates," "believes," "intends," "estimates," 'projects," "potential" and similar expressions, or that events or conditions "will," "would," "may," "could" or "should" occur. These forward-looking statements are subject to a variety of risks and uncertainties which could cause actual events or results to differ materially from those reflected in the forward-looking statements, including, without limitation: risks related to fluctuations in metal prices; uncertainties related to raising sufficient financing to fund the planned work in a timely manner and on acceptable terms; changes in planned work resulting from weather, logistical, technical or other factors; the possibility that results of work will not fulfill expectations and realize the perceived potential of the Company's properties; risk of accidents, equipment breakdowns and labour disputes or other unanticipated difficulties or interruptions; the possibility of cost overruns or unanticipated expenses in the work program; the risk of environmental contamination or damage resulting from Rokmaster's operations and other risks and uncertainties. Any forward-looking statement speaks only as of the date it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise.

SOURCE Rokmaster Resources Corp.



Contact
please contact Mr. John Mirko, CEO of Rokmaster Resources, jmirko@rokmaster.com, Ph. 1-604-290-4647 or the Company's website: www.rokmaster.com
Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Rokmaster Resources Corp.
Bergbau
A2JK8F
CA77543A2083
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.