Discovery Silver Corp. Intersects 165 g/t AgEq over 128 m and 110 g/t AgEq over 110 m in South Corridor Drilling at Cordero
Highlight intercepts include:
- 128.2 m averaging 165 g/t AgEq1 from 312.4 m (65 g/t Ag, 0.05 g/t Au, 1.2% Pb and 1.3% Zn) including 26.1 m averaging 263 g/t AgEq1 (109 g/t Ag, 0.06 g/t Au, 2.0% Pb, 1.9% Zn) in hole C20-405
- 110.0 m averaging 110 g/t AgEq1 from 137.1 m (37 g/t Ag, 0.04 g/t Au, 0.8% Pb and 1.0% Zn) and 51.8 m averaging 184 g/t AgEq1 (65 g/t Ag, 0.05 g/t Au, 1.6% Pb, 1.4% Zn) in hole C21-414
- 27.4 m averaging 279 g/t AgEq1 from 382.0 m (78 g/t Ag, 0.08 g/t Au, 1.3% Pb and 3.6% Zn) in hole C20-407
Taj Singh, President and CEO, states: "Our Phase 1 drill program, which will conclude at the end of this month, will form the basis for our upcoming resource update and PEA scheduled for the second half of the year. Drill results to date, including those presented today, have surpassed all expectations, and demonstrate the scale, continuity and higher-grade nature of the mineralized system at Cordero. We look forward to carrying this momentum into our Phase 2 drill program with drilling continuing uninterrupted and targeting focused on high-grade vein delineation and bulk-tonnage reserve definition and resource expansion."
DRILL RESULTS:
Drill holes from this release build further higher-grade bulk-tonnage continuity in the South Corridor within northeast trending domains. These domains have been defined over a strike length of approximately 1.4 km and are open to the northeast and have been drilled to a depth of 500 m and remain open below this. Higher-grade zones of mineralization are typically flanked by medium and lower-grade mineralization pointing to the scaleability of the mineralized system at Cordero. Mineralization typically consists of galena, sphalerite and pyrite in disseminations, veinlets and stockworks predominately hosted in breccia, rhyodacite and intervals of replacement mineralization in calcareous sediments.
Drill hole locations are shown in Figure 1 (see links below) and detailed drill highlights from the 13 holes in this release are provided in the table below.
Hole ID | From (m) | To (m) | Width (m) | Ag (g/t) | Au (g/t) | Pb (%) | Zn (%) | AgEq1 (g/t) |
C20-393 | 149.6 | 187.6 | 38.1 | 33 | 0.03 | 0.6 | 1.5 | 117 |
C20-398 | 244.0 | 261.0 | 17.1 | 12 | 0.15 | 0.5 | 0.9 | 79 |
and | 327.4 | 349.5 | 22.1 | 23 | 0.04 | 0.6 | 0.8 | 80 |
C20-399 | 201.1 | 236.1 | 35.0 | 13 | 0.04 | 0.2 | 1.0 | 64 |
C20-400 | 39.2 | 76.5 | 37.4 | 77 | 0.10 | 0.3 | 0.1 | 99 |
and | 108.3 | 137.9 | 29.7 | 25 | 0.01 | 0.2 | 1.5 | 94 |
and | 162.0 | 172.5 | 10.5 | 44 | 0.10 | 0.4 | 2.2 | 155 |
C20-403 | 127.6 | 157.0 | 29.4 | 15 | 0.02 | 0.3 | 0.8 | 59 |
and | 360.1 | 398.8 | 38.7 | 55 | 0.07 | 0.6 | 1.3 | 137 |
and | 430.5 | 454.5 | 24.0 | 32 | 0.23 | 0.2 | 0.7 | 87 |
C20-405 | 312.4 | 440.5 | 128.2 | 65 | 0.05 | 1.2 | 1.3 | 165 |
including | 333.0 | 359.1 | 26.1 | 109 | 0.06 | 2.0 | 1.9 | 263 |
C20-407 | 382.0 | 409.4 | 27.4 | 78 | 0.08 | 1.3 | 3.6 | 279 |
C21-410 | 139.4 | 214.3 | 75.0 | 39 | 0.04 | 0.3 | 0.9 | 92 |
and | 282.4 | 324.5 | 42.1 | 23 | 0.02 | 0.2 | 0.8 | 64 |
C21-412 | 55.2 | 129.5 | 74.3 | 23 | 0.05 | 0.3 | 0.5 | 59 |
and | 345.5 | 365.9 | 20.4 | 37 | 0.05 | 0.7 | 1.4 | 124 |
C21-414 | 137.1 | 247.0 | 110.0 | 37 | 0.04 | 0.8 | 1.0 | 110 |
and | 357.1 | 408.9 | 51.8 | 65 | 0.05 | 1.6 | 1.4 | 184 |
1All results in this news release are rounded. Assays are uncut and undiluted. Widths are drilled widths, not true widths, as a full interpretation of the actual orientation of mineralization is not complete. Intervals with stockwork mineralization were chosen based on a 25 g/t AgEq cutoff with no more than 10 m of dilution. Intervals with vein mineralization were based on a 100 g/t AgEq cutoff with no more than 1 m of dilution. AgEq calculations are used as the basis for total metal content calculations given Ag is the dominant metal constituent as a percentage of AgEq value in approximately 70% of the Company's mineralized intercepts. AgEq calculations for reported drill results are based on USD $16.50/oz Ag, $1,350/oz Au, $0.85/lb Pb, $1.00/lb Zn. The calculations assume 100% metallurgical recovery and are indicative of gross in-situ metal value at the indicated metal prices. Refer to Technical Notes below for metallurgical recoveries assumed in the 2018 PEA completed on Cordero.
PHASE 1 DRILL PROGRAM UPDATE:
The Company has completed 70,100 m (171 holes) as part of its expanded Phase 1 drill program that started in September 2019 and is scheduled for completion at the end of this month. Assays from 43 holes are pending. Data from Phase 1 drilling will be used to support the bulk-tonnage resource update and PEA scheduled for the second half of the year.
The four drill rigs currently operating on site will continue uninterrupted with Phase 2 drilling. Phase 2 drilling will be focused on three key areas: (1) upgrading inferred resources to indicated for inclusion in a prefeasibility study on Cordero; (2) resource expansion of bulk-tonnage mineralization; and (3) testing of the width, grade and continuity of extensive high-grade vein systems that transect the deposit.
Supporting maps and sections, drill hole locations and full assay results can be found at the following link: https://discoverysilver.com/site/assets/files/5670/2021-04-20-sections-assays.pdf
A PDF of this release with supporting maps and sections included as appendices can be found at the following link: https://discoverysilver.com/site/assets/files/5670/2021-04-20-cordero-drill-results.pdf
About Discovery
Discovery's flagship project is its 100%-owned Cordero project, one of the few silver projects globally that offers margin, size and scaleability. The project is located in a prolific mining belt in Chihuahua State, Mexico, and is supported by an industry leading balance sheet with over C$90 million of cash allocated for aggressive exploration, resource expansion and future development.
Discovery was a recipient of the 2020 TSX Venture 50 award and the 2021 OTCQX Best 50 award.
On Behalf of the Board of Directors,
Taj Singh, M.Eng, P.Eng, CPA,
President, Chief Executive Officer and Director
For further information contact:
Forbes Gemmell, CFA
VP Corporate Development & Investor Relations
Phone: 416-613-9410
Email: forbes.gemmell@discoverysilver.com
Website: www.discoverysilver.com
Sample analysis and QA/QC Program
True widths of reported drill intercepts have not been determined. Assays are uncut except where indicated. All core assays are from HQ drill core unless stated otherwise. Drill core is logged and sampled in a secure core storage facility located at the project site 40km north of the city of Parral. Core samples from the program are cut in half, using a diamond cutting saw, and are sent to ALS Geochemistry-Mexico for preparation in Chihuahua City, Mexico, and subsequently pulps are sent to ALS Vancouver, Canada, which is an accredited mineral analysis laboratory, for analysis. All samples are prepared using a method whereby the entire sample is crushed to 70% passing -2mm, a split of 250g is taken and pulverized to better than 85% passing 75 microns. Samples are analyzed for gold using standard Fire Assay-AAS techniques (Au-AA24) from a 50g pulp. Over limits are analyzed by fire assay and gravimetric finish. Samples are also analyzed using thirty three-element inductively coupled plasma method ("ME-ICP61"). Over limit sample values are re-assayed for: (1) values of zinc > 1%; (2) values of lead > 1%; and (3) values of silver > 100 g/t. Samples are re-assayed using the ME-OG62 (high-grade material ICP-AES) analytical package. For values of silver greater than 1,500 g/t, samples are re-assayed using the Ag-CON01 analytical method, a standard 30 g fire assay with gravimetric finish. Certified standards and blanks are routinely inserted into all sample shipments to ensure integrity of the assay process. Selected samples are chosen for duplicate assay from the coarse reject and pulps of the original sample. No QAQC issues were noted with the results reported herein.
Qualified Person
Gernot Wober, P.Geo, VP Exploration, Discovery Silver Corp., is the Company's designated Qualified Person for this news release within the meaning of National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101") and has reviewed and validated that the information contained in this news release is accurate.
TECHNICAL NOTES & FORWARD-LOOKING STATEMENTS:
The most recent technical report for the Cordero Project is the 2018 Preliminary Economic Assessment (PEA) authored by M3 Engineering and Technology Corp and includes the most recent resource estimate, completed by Independent Mining Consultants, Inc. It is available on Discovery's website and on SEDAR under Levon Resources Ltd., a wholly owned subsidiary of Discovery. The PEA assumes metallurgical recoveries of 89% for Ag, 84% for Pb, 72% for Zn and 40% for Au.
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
This news release is not for distribution to United States newswire services or for dissemination in the United States.
This news release does not constitute an offer to sell or a solicitation of an offer to buy nor shall there be any sale of any of the securities in any jurisdiction in which such offer, solicitation or sale would be unlawful, including any of the securities in the United States of America. The securities have not been and will not be registered under the United States Securities Act of 1933, as amended (the "1933 Act") or any state securities laws and may not be offered or sold within the United States or to, or for account or benefit of, U.S. Persons (as defined in Regulation S under the 1933 Act) unless registered under the 1933 Act and applicable state securities laws, or an exemption from such registration requirements is available.
Cautionary Note Regarding Forward-Looking Statements
This news release may include forward-looking statements that are subject to inherent risks and uncertainties. All statements within this news release, other than statements of historical fact, are to be considered forward looking. Although Discovery believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those described in forward-looking statements. Factors that could cause actual results to differ materially from those described in forward-looking statements include fluctuations in market prices, including metal prices, continued availability of capital and financing, and general economic, market or business conditions. There can be no assurances that such statements will prove accurate and, therefore, readers are advised to rely on their own evaluation of such uncertainties. There can be no assurance that the Private Placement will close on the announced terms. Discovery does not assume any obligation to update any forward-looking statements except as required under applicable laws.