ForumEnergy Metals Corp. Plans Electromagnetic Survey at Love Lake Nickel-Copper-Palladium Project
Figure 1: Location of the Love Lake Cu-Ni-PGM Project
To view an enhanced version of this graphic, please visit:
https://orders.newsfilecorp.com/files/4908/80971_map1.jpg
Figure 2: Airborne EM Survey Grid Locations: These grids cover 5 priority targets defined by the 2020 airborne gradient magnetic survey (background). This survey will search for sulphide-rich conductive material, either as feeder pipes or as 'reefs'. Highway 905 (black line) to the Rabbit Lake and McClean Lake uranium mills runs through the property.
To view an enhanced version of Figure 2, please visit:
https://orders.newsfilecorp.com/files/4908/80971_0e59a7e314aeb819_005full.jpg
A helicopter borne Geotech ZTEM and aeromagnetic survey flown in 2009 identified conductive anomalies within the areas scheduled to be surveyed next month. The current survey will be conducted on a tighter line spacing giving better definition of these and other potential anomalies.
Discovery International Geophysics Inc. has been contracted using the HeliSAM system (a Time Domain Electromagnetic system) on the five grids at 100m line spacings for a total of 588 line-km and 9 EM ground loops. The HeliSam survey is capable of detecting magmatic nickel-copper-PGM deposits to significant depths and will bring the project to a drill-ready state. Forum is currently making arrangements for a drill program in the late summer, the scale of which will be dependent upon the results of the EM survey.
LOVE LAKE NICKEL-COPPER-PLATINUM-PALLADIUM PROJECT
The Peter Lake Domain in northern Saskatchewan is the largest mafic/ultramafic complex in North America second only to the Midcontinent Rift in Minnesota and Ontario, host to numerous magmatic copper/nickel and platinum/palladium deposits. For over 250 km of the Peter Lake Domain numerous copper/nickel and platinum/palladium showings have been uncovered over the past fifty years that have received only sporadic exploration.
Forum staked 32,075 hectares of the Love Lake Complex in 2019, a 2.56 billion year old, palladium enriched layered gabbroic intrusive. Historic trenching has returned values as high as 0.43% Copper, 0.23% Nickel, 4275 ppb Palladium, 3580 ppb Platinum and 200 ppb Gold from a grab sample. Drilling on the property in 1969 intersected 31.7 metres of 0.23% copper and 36.6 metres of 0.29% copper.
Larry Hulbert, P.Geo., Forum's Copper-Nickel-PGM Consultant and a Qualified Person under National Instrument 43-101, has reviewed and approved the contents of this news release.
About Forum Energy Metals
Forum Energy Metals Corp. (TSXV: FMC) has three 100% owned energy metal projects being drilled in 2021 by the Company and its major mining company partners Rio Tinto and Orano for copper/silver, uranium and nickel/platinum/palladium in Saskatchewan, Canada's Number One Rated mining province for exploration and development. In addition, Forum has a portfolio of seven drill ready uranium projects and a strategic land position in the Idaho Cobalt Belt. For further information: www.forumenergymetals.com
ON BEHALF OF THE BOARD OF DIRECTORS
Richard J. Mazur, P.Geo.
President & CEO
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
For further information contact:
NORTH AMERICA
Rick Mazur, P.Geo., President & CEO
mazur@forumenergymetals.com
Tel: 778-772-3100
UNITED KINGDOM
Burns Singh Tennent-Bhohi, Director
burnsstb@forumenergymetals.com
Tel: 074-0316-3185