Rio Tinto updates details of tailings facilities
Rio Tinto today released updated information in relation to its global tailings facilities to align with the requirements of the Global Industry Standard for Tailings Management (GISTM) released in August 2020, an initiative co-convened by the International Council on Mining and Metals, United Nations Environment Programme and the Principles for Responsible Investment.
The latest disclosure at http://www.riotinto.com/tailings builds on previously disclosed information on each of Rio Tinto's global tailings facilities released in June 2019 and the publication of Rio Tinto's Group Procedure and updated Standard for 'Management of tailings and water storage facilities' in February 2019. The changes to existing data are in line with guidance contained in GISTM including updating information previously disclosed.
As per the June 2019 disclosure, all facilities have been awarded a consequence classification in accordance with the regulatory or industry body that oversees tailings in each region or jurisdiction. Additional technical data from recently updated downstream impact assessments required under the GISTM and Rio Tinto's own internal Tailings standard have resulted in a modification to hazard classifications of some facilities within the company's global operations. Consequence classifications are not a rating of the condition of a facility or the likelihood of failure but on the potential consequence if there were to be a failure.
All Rio Tinto managed facilities are subject to three levels of governance and assurance:
- First level of assurance takes place at the asset itself with the main tenets being effective facility design, comprehensive operational controls and regular reviews. Independent reviews of the operations must be conducted at least every two years
- Second level is assurance to the Rio Tinto Standard through periodic Business Conformance Audits and Technical Reviews, supported by Rio Tinto's Surface Mining Centre of Excellence
- Third level of assurance is independent of site management and normally conducted by third parties. In addition, all Rio Tinto managed facilities, whether active or inactive, have an external engineer of record or design engineer.
Full details of all Rio Tinto tailings and water storage facilities are available at https://www.riotinto.com/tailings.
riotinto.com
Category: General
View source version on businesswire.com: https://www.businesswire.com/news/home/20210430005187/en/
Contact
Please direct all enquiries to media.enquiries@riotinto.com
Media Relations, UK
Illtud Harri
M +44 7920 503 600
David Outhwaite
M +44 7787 597 493
Media Relations, Americas
Matthew Klar
T +1 514 608 4429
Investor Relations, UK
Menno Sanderse
M: +44 7825 195 178
David Ovington
M +44 7920 010 978
Clare Peever
M +44 7788 967 877
Media Relations, Australia
Jonathan Rose
M +61 447 028 913
Matt Chambers
M +61 433 525 739
Jesse Riseborough
M +61 436 653 412
Investor Relations, Australia
Natalie Worley
M +61 409 210 462
Amar Jambaa
M +61 472 865 948
Rio Tinto Plc
6 St James's Square
London SW1Y 4AD
United Kingdom
T +44 20 7781 2000
Registered in England
No. 719885
Rio Tinto Ltd.
Level 7, 360 Collins Street
Melbourne 3000
Australia
T +61 3 9283 3333
Registered in Australia
ABN 96 004 458 404