• Montag, 25 November 2024
  • 19:30 Uhr Frankfurt
  • 18:30 Uhr London
  • 13:30 Uhr New York
  • 13:30 Uhr Toronto
  • 10:30 Uhr Vancouver
  • 05:30 Uhr Sydney

Bonterra Resources Inc. Intersects 11.3 g/t Au over 2.2 m from the Ongoing Expansion Drilling Campaign at Barry

16.08.2021  |  Newsfile
Val-d'Or, August 16, 2021 - Bonterra Resources Inc. (TSXV: BTR) (OTCQX: BONXF) (FSE: 9BR2) ("Bonterra" or the "Company") is pleased to announce the results from the ongoing drilling campaign at the Barry project. Recent drilling continues to expand the H series at depth in the SW sector and up-dip to the NW (Figure 1). The latest results encompass nine diamond drill holes designed to expand the 2021 mineral resource estimate ("MRE") released in June (see press release dated June 23, 2021), and one hole (MB-21-353) that was included in the MRE. Drilling highlights include 11.3 grams-per-tonne gold ("g/t Au") over 2.2 metres ("m") in the H15 zone.

The Company is currently drilling at a rate of approximately 10,000 m per month at its three main gold deposits to expand upon the recently released MREs. In addition, work on the preliminary economic assessment ("PEA"), which would utilize the existing Bachelor Mill as a central processing facility is ongoing and is expected to be completed in Q4 2021.

Highlights include:

  • 11.3 g/t Au over 2.2 m in hole MB-21-361
  • 3.0 g/t Au over 7.0 m, including 6.5 g/t Au over 3.1 m in hole MB-21-353
  • 3.0 g/t Au over 6.8 m, including 6.2 g/t Au over 2.0 m in hole MB-21-372
  • 14.8 g/t over 0.4 m in hole MB-21-352

Pascal Hamelin, CEO commented: "Today's drill results of the H series reinforce the expansion potential we see across the entire Barry project. More assay results are expected from Barry in the coming months as a backlog of pending results are returned from the laboratory and from the ongoing drilling campaign of expansion targets, which remain open in all directions."

Figure 1 - Barry Project - Drill Hole Location Map

To view an enhanced version of Figure 1, please visit:
https://orders.newsfilecorp.com/files/1528/93233_990a20f2147c6bce_001full.jpg

Figure 2 - Barry H15 Zone Longitudinal Section

To view an enhanced version of Figure 2, please visit:
https://orders.newsfilecorp.com/files/1528/93233_990a20f2147c6bce_002full.jpg

The Barry gold deposit is characterized by three dominant sets of structures, all dipping to the south-east. The sub-vertical shear zones and the H-Series shear zones dipping 25 to 40 degrees are hosted within intermediate to mafic volcanics and tuffs with local felsic intrusions. Contact zones dip at 50-65 degrees along the lower and upper contacts of the D1, D2 and D3 felsic intrusions with mafic volcanics. Gold mineralization is associated with disseminated sulfides within shear zones and veins with local visible gold. The Barry deposit has been delineated over 1.4 kilometres along strike and 700 m vertical and remains open for expansion.

The Barry drilling campaign is currently focused on the expansion of key gold mineralized zones around the MRE. Drilling results presented here targeted the expansion of "H-Series" and "Contact" zones in the west sector at depth and up-dip in the footwall of the D2 intrusive. These results confirm the potential to continue expanding these zones, with success along the H15 and D2 HW zones (Table 1; Figures 1 and 2). These zones remain open across the Barry deposit. Two new H series zones were also identified in the NW sector nearer to surface in the FW of the D2 intrusive in hole MB-21-352, outlining the remaining potential within the deposit's footprint (Table 1; Figure 1). Drilling also targeted the NE of the deposit but assays are still pending (Table 1; Figure 1).

Table 1: Barry Drill Hole Results Highlights

Hole ID From (m) To (m) Length (m) Grade (g/t Au) Zone
MB-21-352 152.4 153.0 0.6 0.8 D2 FW*
164.8 165.2 0.4 14.8 New H Zone
208.2 214.0 5.8 1.45 New H Zone
Including 208.2 209.4 1.2 5.0 New H Zone
MB-21-353 477.1 478.9 1.8 1.2 New Sub-vertical Zone
504.2 507.1 2.9 0.5 New Sub-vertical Zone
525.5 532.5 7.0 3.0 D2 HW*
Including 526.4 529.5 3.1 6.5 D2 HW*
766.8 768.8 2.0 3.8 H15*
Including 767.3 767.8 0.5 10.9 H15*
MB-21-354 44.7 45.7 1.0 6.2 D2 HW*
414.2 415.8 1.6 4.0 H15*
MB-21-355 Results pending
MB-21-356 749.0 750.0 1.0 0.5 H15*
MB-21-357 Results pending
MB-21-358 Results pending
MB-21-359 Results pending
MB-21-360 Results pending
MB-21-361 747.0 749.9 2.9 1.2 H15*
754.3 756.5 2.2 11.3 H15*
MB-21-362 Results pending
MB-21-363 Results pending
MB-21-364 Results pending
MB-21-365 Results pending
MB-21-366 751.0 753.5 2.5 0.6 H15*
757.3 760.0 2.7 1.6 H15*
MB-21-367 Results pending
MB-21-368 Results pending
MB-21-369 Results pending
MB-21-370 Results pending
MB-21-371 Results pending
MB-21-372 579.3 580.5 1.2 1.8 H8
625.0 631.2 6.2 0.8 H13*
740.4 747.2 6.8 3.0 H15*
Including 742.2 744.2 2.0 6.2 H15*
MB-21-373 603.8 609.0 5.2 1.1 H14*
Including 605.9 606.8 0.9 4.4 H14*
MB-21-374 730.0 746.2 16.2 0.9 H15*
Including 733.6 736.8 3.2 2.9 H15*
MB-21-375 826.0 829.6 3.6 0.6 H15*
840.4 844.2 3.8 0.9 H15*
MB-21-376 Results Pending

Notes:
1) The meterage represents the length of the drilled lengths.
2) True widths are estimated to be greater than 70% of the drill intersection length.
3) The mineralized intervals listed are above 0.5 g/t Au.
4) * Zones renamed in the 2021 MRE report, see Table 2 for reference.

Several zones were renamed by SLR Consulting (Canada) Ltd. during the completion of the Barry 2021 Resource Estimate in order to facilitate the estimation process. An equivalence table for relevant zones is presented below in Table 2. Names used in the text of this press release are based on Bonterra's pre-resource estimation nomenclature for continuity.

Table 2: Zone Nomenclature

Pre-2021 MRE
Terminology
2021 MRE
Terminology
D2 FW D2
D2 HW D4
D1 FW Split into D1, D3, D5
H12 H12
H13 H3
H14 Split into H5, H7, H9, H11
H15 H12

Notes:
1) Names used in this press release are according to Pre-2021 MRE Terminology.

Quality Control and Reporting Protocols

The Barry project's drill core gold analyses are performed at the Company's Bachelor Mine analytical laboratory (the "Laboratory"). The Company employs a rigorous QA-QC analysis program that meets industry standards. The analyses are carried out by fire assay (A.A.) with atomic absorption finish. Blanks, duplicates, and certified reference standards are inserted into the sample stream to monitor the Laboratory's performance. The Company's QA-QC program requires that at least 10% of samples be analyzed by an independent laboratory. These verification samples are sent to ALS Minerals laboratory facility located in Val-d'Or, Quebec. The verifications show a high degree of correlation with the Laboratory's results.

Qualified Person

Marc Ducharme, P.Geo. and Bonterra's Exploration Manager, has compiled and approved the information contained in this press release. Mr. Ducharme is a qualified person as defined by NI 43-101.

About Bonterra Resources Inc.

Bonterra is a Canadian gold exploration company with a large portfolio of advanced exploration assets anchored by a central milling facility in Quebec, Canada. The Company has four main assets, Gladiator, Barry, Moroy, and Bachelor that collectively have a total of 1.24 million ounces in Measured and Indicated categories, and 1.78 million ounces in Inferred category. Importantly, the Company owns the only permitted and operational gold mill in the region that is currently estimated at 75% through the permitting process to expand from 800 to 2,400 tonnes-per-day. Bonterra is focused on graduating from advanced exploration to a development company over the next 18-24 months to deliver shareholder value.

FOR ADDITIONAL INFORMATION

Pascal Hamelin, President & CEO
ir@btrgold.com

2872 Sullivan Road, Suite 2, Val d'Or, Quebec J9P 0B9
819-825-8678 | Website: www.btrgold.com

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary and Forward-Looking Statements

This news release contains "forward-looking information" within the meaning of the applicable Canadian securities legislation that is based on expectations, estimates, projections and interpretations as at the date of this news release. Any statement that implies predictions, expectations, interpretations, opinions, plans, projections, objectives, assumptions, future events or performance (often using words such as "expects" or "does not expect", "is expected", "interpreted", "in management's opinion", "anticipates", or "plans", "budget", "schedule", "forecasts", statements that certain actions, events or results "may", "could", "should", "would", "might" or "will" be taken, occur or be achieved) is not a statement of historical fact and may constitute forward-looking information and is intended to identify forward-looking information. This news release may contain forward-looking information relating to, among other things, the outlook for the Gladiator, Barry, and Moroy projects; updated mineral resources; the deposit remaining open laterally and at depth; and future drilling. These factors include, but are not limited to, risks associated with the ability of exploration activities (including drilling results) to accurately predict mineralization; the Company's ability to obtain required approvals; the results of exploration activities; risks associated with mining operations; global economic conditions; metal prices; dilution; environmental risks; and community and non-governmental actions. Although the forward-looking information contained in this news release is based on assumptions that management believes are reasonable at the time of release, Bonterra cannot assure shareholders and prospective purchasers of the Company's securities that actual results will be consistent with the forward-looking information, as there may be other factors that cause results not to be as anticipated, estimated or intended, and neither Bonterra nor any other person assumes responsibility for the accuracy or completeness of forward-looking information. All statements made, other than statements of historical fact, that address the Company's intentions and the events and developments that the Company anticipates, are considered forward-looking statements. Although the Company believes that the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance, and actual results or developments may differ from those in the forward-looking statements.

Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Bonterra Resources Inc.
Bergbau
A2N8S8
CA09852X7018
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.