• Freitag, 22 November 2024
  • 01:24 Uhr Frankfurt
  • 00:24 Uhr London
  • 19:24 Uhr New York
  • 19:24 Uhr Toronto
  • 16:24 Uhr Vancouver
  • 11:24 Uhr Sydney

Bam Bam Plans Additional Drilling for DeSoto Copper Oxide Target at Majuba

18.10.2021  |  Newsfile

Vancouver, October 18, 2021 - Bam Bam Resources Corp. (CSE: BBR) (OTC Pink: NPEZF) (FSE: 4NPB) ("Bam Bam" or the "Company") is planning additional drilling for the DeSoto Copper Oxide Target at the Majuba Hill Project in Pershing County, Nevada. Recent recognition of the near surface copper oxide potential from historic core has been combined with the soil results reported on by the Company (Press Release October 14, 2021). This points to three areas within the DeSoto Copper Oxide zone.

Bam Bam has filed an Amendment to the Notice that is in place with the U.S. Bureau of Land Management for the exploration currently underway. Typically, the Notice Amendments are processed and accepted in a very timely fashion. The Company expects the same with this amendment and is making plans to move one of the drill rigs on the project over to test these areas.



Figure 1

To view an enhanced version of this graphic, please visit:
https://orders.newsfilecorp.com/files/6332/99894_253a1e9cf47a6bd2_001full.jpg

David Greenway, President and CEO, commented: "The expansion of the DeSoto Copper Oxide Target to over one mile long is important. Because of our improved understanding of the leaching and enrichment environment at DeSoto, these will be significant drill holes. The nearness to the Majuba-Known Copper Oxide zone drilling means that encouragement at DeSoto could have an immediate impact on the project."

Quality Assurance/Quality Control ("QA/QC") Measures, Chain of Custody

The Company has implemented a QA/QC program using best industry practices at the Majuba Hill Project. The samples are transported from the BBR secure warehouse or directly from the drill to the ALS Sample Prep Facility in Reno or Elko, Nevada. ALS then transports the prepared pulps to their analytical lab in Reno, Nevada or Vancouver, B.C. Soil and rock chip samples are transported by the company directly to Elko or Reno, Nevada.

Drill core samples are sawn in half lengthwise and one half is placed in labeled cloth sample bags. All samples are analyzed for copper, gold, silver, and 33 other elements. Gold is determined by ALS method Au-AA23 which is a fire assay with an AAS finish on a 30 gram split. Copper, silver and the remaining 31 elements are determined by ALS method ME-ICP61 which is a four acid digestion and ICP-AES assay. Approximately 5% of the submitted samples are drill duplicates and copper-gold-porphyry commercial standard reference material pulps. The sample rejects and remaining pulps will be retrieved from ALS.

Qualified Person

The scientific and technical information contained in this news release has been reviewed by E.L. "Buster" Hunsaker III, CPG 8137, a non-independent consulting geologist who is a "Qualified Person" as such term is defined under National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43- 101").

About Bam BAM Resources Corp.

Bam Bam Resources Corp. (CSE: BBR) (OTC Pink: NPEZF) (FSE: 4NPB) is engaged in the identification, review and acquisition of latter stage copper and copper/silver/gold assets. This is in direct response to the growing worldwide demand and lack of supply for precious metals fueled by the Green New Deal in the US and most other developed nations with similar programs aimed at addressing climate change. Such programs are heavily reliant on silver, gold and especially copper to produce Electric Vehicles and other renewable power sources, as well as building infrastructure to provide clean and affordable electricity.

The flagship project is the Majuba Hill copper, silver and gold District located 156 miles outside Reno, Nevada, USA. Management has been mandated to focus on safe, mining friendly jurisdictions where government regulations are supportive of mining operations.

Neither the Canadian Securities Exchange nor its Market Regulator (as that term is defined in the policies of the Canadian Securities Exchange) accepts responsibility for the adequacy or accuracy of this release.

On Behalf of the Board of Bam Bam Resources Corp.

"David Greenway"

David C. Greenway
President & CEO

For further information, please contact:
Joel Warawa
VP of Corporate Communications
E: jw@bambamresources.com
P: 1 (855) 475-0745

Forward-Looking Statements

This news release contains certain statements that may be deemed "forward-looking" statements. Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects", "plans", "anticipates", "believes", "intends", "estimates", "projects", "potential" and similar expressions, or that events or conditions "will", "would", "may", "could" or "should" occur. Although Bam Bam Resources Corp. believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results may differ materially from those in forward-looking statements. Forward-looking statements are based on the beliefs, estimates and opinions of Bam Bam Resources Corp. management on the date the statements are made. Except as required by law, Bam Bam Resources Corp. undertakes no obligation to update these forward-looking statements in the event that management's beliefs, estimates or opinions, or other factors, should change.

###

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/99894


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Giant Mining Corp.
Bergbau
A409DM
CA37452L1085
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.