• Sonntag, 24 November 2024
  • 21:38 Uhr Frankfurt
  • 20:38 Uhr London
  • 15:38 Uhr New York
  • 15:38 Uhr Toronto
  • 12:38 Uhr Vancouver
  • 07:38 Uhr Sydney

Phoenix Gold Resources Corp. Updates Progress of Phase 2 Drilling at York Harbour Copper-Zinc-Silver-Cobalt Project

04.11.2021  |  The Newswire
Vancouver, Nov 4th, 2021 - Phoenix Gold Resources Corp. (TSXV:PXA) (OTC:PGRCF) (Frankfurt:5DE) ("Phoenix Gold" or the "Company") is pleased to provide the following progress update for its Phase 2 diamond drilling program at York Harbour Mine Property ("York Harbour" or the "Property"), situated approximately 27 kilometres west of Corner Brook, Newfoundland.

Highlights:

  • - Phase 2 diamond drilling to date comprises 10 drill holes totalling 1,354 metres with significant semi-massive and massive VMS mineralization identified in drill cores from 8 of 10 holes.

    - Massive sulphide mineralization includes drilling lengths of 10 m (YH21-19) and 26 m (YH21-18).

    - Channel sampling continues at the 15 metres of sheared semi-massive and massive sulphide mineralization adjacent to the No. 4 Brook adit situated 1 km west of the Phase 2 drilling area.

The Company has completed 10 of the 28 proposed drill holes, or 1,354 metres of the proposed 4,325 metres of NQ-size diamond drilling. Significant semi-massive and massive VMS mineralization; including pyrite, chalcopyrite, sphalerite and rarely native copper, has been identified in drill cores from 8 of the 10 holes. It is anticipated that the Phase 2 drilling program will be completed near the end of November.

Some of the latest massive sulphide mineralization includes that seen from drilling lengths of 92 to 118 metres in drill hole YH21-18 and 92 to 102 metres in drill hole YH21-19.


Click Image To View Full Size

Close-up Photograph of the Massive Sulphide Massive Sulphide from the 10 m Intercept

Mineralization in Drill Hole YH21-18 in Drill Hole YH21-19

Additional photos available at https://phoenixgoldresources.ca.

To date, there have been 641 drill core samples collected of the sulphide mineralization and 106 standard, blank and duplicate samples have been inserted into the sample string for a total of 747 samples. The samples were collected from one-half of the drill core sawn lengthwise between each identified sample interval and they were later shipped to the ISO/IEC-certified assay laboratories of Activation Laboratories Ltd. ('Actlabs') in Ancaster, Ontario. In addition to the 5% inserted quality control samples, the assay laboratory also inserts their own QA/QC samples and, at least, 5% of the final analyzed and/or assayed drill core samples will be check-assayed at a different ISO-accredited laboratory.

No. 4 Brook

The field crew is currently channel sampling the 15 metres of sheared semi-massive and massive sulphide mineralization exposed immediately adjacent to the No. 4 Brook adit, situated 1 km west of the Phase 2 drilling area and the former York Harbour Mine. Samples from the work will be sent to Actlabs for multi-element ICP and any over-limit assaying.

400 Level Adit

In addition to the field work, the Company is currently investigating the use of a lidar-equipped drone, either ground-ambulatory or aerial, to survey the 400 Level adit this field season. The results of such a survey would be valuable for both identifying the condition of the adit for an ongoing application to permit the entry of the adit and to survey its dimensions for later drill hole placement.

About the York Harbour Mine Property

The York Harbour Mine Property is known to be prospective for its copper-zinc-silver-gold-cobalt massive sulphide deposits. The known mineralization exhibits characteristics consistent with classic mafic-type flow dominated (Cyprus-type) VMS deposits. Similar geological environments and styles of mineralization have formed relatively large copper-zinc deposits elsewhere in Newfoundland at Tilt Cove (9 Mt of between 1% and 12% copper) and in Cyprus at the Mavrovouni mine (15 Mt of 4% copper with zinc and gold) (Messina Minerals Inc., 2009).

J.D. Blanchflower, P. Geo. is a qualified person in accordance with National Instrument 43-101 who has reviewed and accepted the technical material contained in this news release.

For further information:

Andrew Lee CEO, President and Director

Phone: 778-302-2257 | Email: andrew@phoenixgoldresources.ca Website: www.phoenixgoldresources.ca

Cautionary Statement Regarding Forward-Looking Information

This news release may contain "forward-looking information" and "forward-looking statements" within the meaning of applicable Canadian securities legislation. All information contained herein that is not historical in nature may constitute forward-looking information. Forward-looking statements herein include but are not limited to statements relating to satisfactory completion of due diligence and any acquisition under the Option and are necessarily based upon a number of assumptions that, while considered reasonable by management, are inherently subject to business, market and economic risks, uncertainties and contingencies that may cause actual results, performance or achievements to be materially different from those expressed or implied by forward-looking statements. Except as required by law, the Company disclaims any obligation to update or revise any forward-looking statements. Readers are cautioned not to put undue reliance on these forward-looking statements.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this press release.

Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
York Harbour Metals Inc.
Bergbau
A3EMCX
CA98664A1084
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.