• Freitag, 22 November 2024
  • 20:23 Uhr Frankfurt
  • 19:23 Uhr London
  • 14:23 Uhr New York
  • 14:23 Uhr Toronto
  • 11:23 Uhr Vancouver
  • 06:23 Uhr Sydney

TomaGold Intersects 23.78 g/t Au, 16.55 g/t Ag and 1.0% Cu over 3.20 m at a depth of 330 m at Obalski

29.11.2021  |  GlobeNewswire

MONTREAL, Nov. 29, 2021 - TomaGold Corp. (TSXV: LOT) (OTCQB: TOGOF) ("TomaGold" or the "Corporation") is pleased to report the results for the last three holes of phase I of its 11,500-metre drilling program on its wholly-owned Obalski property in Chibougamau, Quebec. Phase I, which started on July 10, 2021, consisted of 15 holes totalling 7,253 m. The results of the first 12 holes were reported in a press release dated November 10, 2021.

"While the Obalski property has historically returned high-grade results from near surface, with this program we focused on identifying mineralization at depth," said David Grondin, President and CEO of TomaGold. "I am pleased to report that our first phase of drilling at depth has been a real success, with the discovery of large, low-grade intersections combined with shorter, high-grade intersections. Based on the results, we have significantly upgraded our assessment of Obalski's mineral potential. In phase II of the program, which starts today, we will continue drilling at depth, on sections 300+00 E, 350+00 E, 400+00 E and finally 450+00 E. To optimize phase II of the program, we will combine the phase I results with the results of gyroscopic surveys currently being conducted in historical holes."

The following table presents the best results obtained for gold, silver and copper for the last three holes of phase I:

Hole Section Core length
(m)*
Au
(g/t)
Ag
(g/t)
Cu
(%)
Depth
(m)
OBS-21-013 200+00 E 1.40 0.76 2.10 0.14 450
OBS-21-014 250+00 E 8.90 0.62 0.12 - 210
OBS-21-015 250+00 E 3.20 23.78 16.55 1.00 330
Including 0.45 167.50 112.00 6.08

* The width shown is the core length. True width is estimated at 65-70% of core length.

Figure 1: Obalski drilling program surface plan
Figure 2: Obalski property section 200+00 E
Figure 3: Obalski property section 250+00 E

Holes OBS-21-013 and OBS-21-014 returned low values and small thicknesses but confirmed the continuity of the A-Po zone. Hole OBS-21-013 returned 0.76 g/t Au and 2.10 g/t Ag over 1.40 m at a vertical depth of 450 m, while hole OBS-21-014, drilled 50 m to the east, returned 0.62 g/t Au and 0.12 g/t Ag over 8.9 m at a vertical depth of 210 m.

Hole OBS-21-015, drilled on the same section as OBS-21-014 to a vertical depth of 330 m, intersected 23.78 g/t Au, 16.55 g/t Ag and 1.0% Cu over 3.20 m, including 167.50 g/t Au, 112.00 g/t Ag and 6.08% Cu over 0.45 m. Based on this result, the Corporation plans to drill an additional hole below OBS-21-015 to a vertical depth of approximately 400 m.
The following table presents the best results obtained for gold, silver and copper for phase I overall:

Hole Section Core length
(m)*
Au
(g/t)
Ag
(g/t)
Cu
(%)
Depth
(m)
OBS-21-005 120+00 E 4.05 3.01 3.35 - 200
OBS-21-006 120+00 E 1.90 0.24 0.68 - 250
OBS-21-007 120+00 E 20.75 0.43 0.29 - 385
OBS-21-008 150+00 E 12.55 0.85 1.40 0.11 185
Including 2.10 3.40 4.73 0.65
OBS-21-009 150+00 E 28.50 1.41 0.81 - 200
Including 1.50 6.84 1.50 -
Including 4.50 4.03 2.87 -
OBS-21-010 150+00 E 45.95 0.32 0.35 - 425
OBS-21-010A 150+00 E 54.80 0.33 0.20 - 425
Including 3.50 1.44 0.80 -
OBS-21-011 200+00 E 0.50 1.60 2.60 - 210
OBS-21-012 200+00 E 27.50 0.39 0.83 - 300
OBS-21-013 200+00 E 1.40 0.76 2.10 0.14 450
OBS-21-014 250+00 E 8.90 0.62 0.12 - 210
OBS-21-015 250+00 E 3.20 23.78 16.55 1.00 330
Including 0.45 167.50 112.00 6.08

* The width shown is the core length. True width is estimated at 65-70% of core length.

In June 2021, a Pulse-EM geophysical survey conducted in four holes revealed that all historical holes over 300 m long had a significant eastward deviation. The Corporation is currently conducting gyroscopic surveys to confirm the location of the gold-bearing structures at depth. Some 40 historical drill holes have been surveyed since the beginning of October, and all the holes are expected to be completed in the coming weeks.

Sample preparation and analysis
TomaGold has implemented and is adhering to a strict Quality Assurance/Quality Control program for the present drilling program. The core is sawed in half, with one half kept as a witness sample in Chibougamau and the other half shipped directly by bus to ALS Chemex in Val-d'Or, Quebec. ALS grinds the half core to 1/8", split it into two halves and keeps one half as a witness (reject) in Val-d'Or. ALS pulverizes the other half to minus 150 mesh, takes a 50 g sample for analysis and keeps the rest, identified as "pulp".

The technical content of this press release has been reviewed and approved by Andr? Jean, P.Eng., the Corporation's Director of Exploration and a qualified person under National Instrument 43-101.

About the Obalski property
The Obalski property, which covers 345 hectares, lies about 2 km south of Chibougamau, Quebec. Discovered in 1928, the Obalski deposit produced 100,273 tonnes at grades of 1.14% Cu, 2.08 g/t Au and 6.04 g/t Ag from the A zone between 1964 and 1972, and around 9,000 tonnes at a reported grade of 8.5 g/t Au from the D zone in 1984 (Source: SIGEOM and Camchib Exploration internal reports).

About TomaGold
TomaGold Corp. (TSXV: LOT) is a Canadian mineral exploration corporation engaged in the acquisition, assessment, exploration and development of gold mineral properties. TomaGold has interests in five gold properties near the Chibougamau mining camp in northern Quebec: Obalski, Monster Lake East, Monster Lake West, Hazeur and Lac Doda. It also participates in a joint venture with Evolution Mining Ltd. and New Gold Inc., through which it holds a 24.5% interest in the Baird property, near the Red Lake mining camp in Ontario.

Contact:
David Grondin
President and Chief Executive Officer
(514) 583-3490
www.tomagoldcorp.com

Neither the TSX Venture Exchange nor its regulation services provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release. Some of the statements contained in this press release are forward-looking statements within the meaning of applicable securities laws. Forward-looking statements can be identified by the use of words such as "expects", "intends", "is expected", "potential", "suggests" or variations of such words and phrases or statements that certain actions, events or results "may", "could", "should", "might" or "will" be taken, occur or be achieved. Forward-looking statements are not historical facts and are subject to a number of risks and uncertainties beyond the Corporation's control. Readers are cautioned that such statements are not guarantees of future performance and that actual results and developments are likely to differ, and may differ materially, from those expressed or implied by the forward-looking statements contained in this press release. Accordingly, readers should not place undue reliance on forward-looking statements. The Corporation undertakes no obligation to publicly update or revise any forward-looking statements, except as required by law.



Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
TomaGold Corp.
Bergbau
A1JXD6
CA8897331010
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.