• Freitag, 22 November 2024
  • 18:19 Uhr Frankfurt
  • 17:19 Uhr London
  • 12:19 Uhr New York
  • 12:19 Uhr Toronto
  • 09:19 Uhr Vancouver
  • 04:19 Uhr Sydney

Alexco Reports Final Results from 2021 Bermingham Drilling Program, Composite Assays to 1,383 g/t Ag over 11.09 m True Width

16.12.2021  |  CNW
High Grade Silver Mineralization Confirmed along 500 meter Zone

VANCOUVER, Dec. 16, 2021 - Alexco Resource Corp. (NYSE American: AXU) (TSX: AXU) ("Alexco" or the "Company") today reported the balance of results from its 2021 directional drilling program at the Bermingham Northeast Deep zone in the Keno Hill Silver District, Yukon Territory ("Keno Hill"). The 17,742 meter ("m") drill program completed 52 intercepts through the multi-vein target zone, which extends approximately 500 m along strike with at least a 100 m vertical extent. Initial results were reported on September 7, 2021 (see news release). With all assays now received, the Company is calculating a revised estimated mineral resource for the Bermingham deposit, which currently contains a silver resource of 32.96 million ounces ("Moz") Indicated (including 18.2 Moz Probable Reserve) and 11.74 Moz Inferred (see news release). The resource estimation of the newly defined zone is expected to be complete before year end 2021.

2021 Exploration Results Highlights

Final results from 2021 Northeast Deep zone drilling (Table 1) confirm the presence of a 500 m long sub-horizontal mineralized zone (Figure 1) with at least a 100 m vertical extent located approximately 150 m below the Bermingham Northeast mining reserve.

In addition to the important intercepts previously reported from initial results in September 2021 (see news release), the more significant intercepts from the balance of the drilling (Table 2) are highlighted below:

  • K-21-0800A intersected the Bermingham Main vein over a true width of 11.09 m from 187.75 m containing 1,383 grams per tonne ("g/t") (44.45 ounces per tonne ("oz/t")) silver ("Ag"), including 3.33 m true width from 189.00 m containing 2,959 g/t (95.14 oz/t) Ag.
  • K-21-0803A intersected the Bermingham Footwall vein over a true width of 7.85 m from 170.85 m containing 1,358 g/t (43.66 oz/t) Ag.
  • K-21-0797A intersected the Bermingham Main vein over a true width of 7.20 m from 207.82 m containing 1,082 g/t (34.78 oz/t) Ag.
  • K-21-0800B intersected the Bermingham Main vein over a true width of 4.16 m from 216.80 m containing 3,226 g/t (103.72 oz/t), including 3.56 m true width from 216.80 m containing 3,748 g/t (120.50 oz/t) Ag.
  • K-21-0803 intersected the Bermingham Footwall vein over a true width of 5.41 m from 478.58 m containing 1,331 g/t (42.80 oz/t) Ag.
  • K-21-0800 intersected the Bermingham Footwall vein over a true width of 4.49 m from 464.65 m containing 1,205 g/t (38.73 oz/t) Ag.
  • K-21-0799B intersected the Bermingham Footwall vein over a true width of 6.20 m from 270.30 m containing 888 g/t (28.56 oz/t) Ag.
  • K-21-0796B intersected the Bermingham Footwall vein over a true width of 5.43 m from 299.50 m containing 996 g/t (32.03 oz/t) Ag.
  • K-21-0792D intersected the BM2 vein over a true width of 3.02 m from 164.32 m containing 1,273 g/t (40.93 oz/t) Ag.

As in previous years, assay results are reported in Table 2 as +30 g/t Ag composite intervals (that may contain up to two meters of unmineralized material) as in essence this outlines the mineralized vein structures. Table 2 also includes +900 g/t Ag composites for comparison, this being the Bermingham Probable Reserve silver grade.

Alexco's Chairman and CEO, Clynt Nauman commented, "The 2021 infill and extension directional drilling program at Bermingham was very successful - and we have now turned our attention to the calculation of a revised mineral resource estimate for the Bermingham deposit. Without question, this discovery is important from an exploration perspective, but with mining operations at Bermingham already underway and with infrastructure planned to be within approximately 200 m of the newly defined mineralized zone, we are working with urgency to understand the size and tenor of the potentially expanded resource. Understanding the geology of the entire Bermingham deposit has significant exploration implications in a district where historically silver mineralization was considered shallow and discontinuous. There remains extensive areas along several kilometers of the vein-fault systems yet to be drill tested in favourable stratigraphy at depth. In particular, these areas include the northeastern extension of the Bermingham deposit towards the historic Hector-Calumet mine, as well as southwest to the Coral Wigwam prospect and beyond to the west."

2021 Program Summary and Bermingham Geology

The 2021 exploration program has provided nominal drill intersection spacings of 35 m along strike by 25 m dip separation along the subparallel Bermingham Main and Bermingham Footwall veins using directional drilling technology whereby shorter secondary drill-holes were initiated at depth from an existing primary drill-hole. The mineralized Northeast Deep zone is structurally complex with a horizontal to gentle northeast plunge along a strike length of 500 m and an apparent dip extent exceeding 100 m - the zone exhibits a mineralogy similar to that seen elsewhere in the Bermingham deposit. Characteristically, mineralized widths that range up to 20 m are coincident with changes in strike and dip of the hosting fault structure in response to variations in rock competency and proximity to the intersection of the two veins, which can now be traced over a 900 m strike length throughout the length of the Bermingham deposit. The mineralization is primarily hosted within the thick bedded quartzites of the Keno Hill Quartzite that also host the nearby historical Hector-Calumet deposit.

Operations Update

Ramp up of underground development and ore production continues with increasing ore production to design capacity rates (400 tonnes per day) targeted during Q1 2022. Ore production from the Bellekeno mine is complete with underground assets removed and redeployed and the mine has transitioned into longer term monitoring. At Flame & Moth, an Alimak nest has been completed on the 815 ore access level and the raise contractor is currently advancing the 85 m ventilation and secondary egress raise to surface. Two initial ore level accesses are being driven on the 815 and 835 levels at Flame & Moth with a target of having five ore production headings opened in early Q1 2022. At Bermingham, the first ore drive on the 1150 level is complete and long hole drilling is underway. Longhole stoping in the 1150 level is anticipated to commence before year end, which will provide a significant increase in ore tonnes delivered from Bermingham. In the mill, the installation of new concentrate regrind mills is complete and the installation of the secondary grinding mill has also been completed and commissioned. With commissioning of the secondary grinding mill using Bermingham ore feed, extended periods of throughput at 17 tonnes per hour (400 tonnes per day run rate) has been achieved along with design metallurgical performance and concentrate Ag grades in excess of 18,000 g/t being produced.

Retirement of Al McOnie, VP Exploration

Alexco also announces that Mr. Al McOnie, Vice President, Exploration, has decided to retire from the Company after more than 15 years of service, effective December 31st, 2021. "Al has been a trusted friend and an exceptional leader at Alexco," said Clynt Nauman, Alexco's Chairman and CEO. "There can be no doubt that the incredible success of our exploration efforts over the past decade would not have been possible without Al and his leadership. On behalf of the Board and employees at Alexco, we wish Al the very best in his retirement."

Going forward, Ms. Liana Stammers, P.Geo, Alexco's Senior Exploration Geologist, will serve as the Company's Qualified Person for exploration related topics. Al McOnie has agreed to continue to be available to the Company to provide strategic advice regarding future exploration initiatives

Qualified Persons and Procedures

The 2019 - 2021 exploration drill programs and sampling protocol has been reviewed, verified, and compiled by Alexco's geologic staff under the supervision of Alan McOnie, FAusIMM, Vice President Exploration and Liana Stammers, P.Geo, Senior Exploration Geologist, while that regarding mine development and operations has been reviewed and approved by Neil Chambers, P.Eng., Chief Mine Engineer, all of whom are Qualified Persons as defined by National Instrument 43-101 - Standards of Disclosure for Mineral Projects.

Compared with previous years, the core sampling protocols have varied from sampling half HQ core, as more holes have been completed in NQ core in some daughter holes where essentially whole core assay sampling has been undertaken to ensure adequate sample size, providing adequate representative sample material has been retained and high resolution core photography undertaken.

A rigorous quality control and quality assurance protocol is used on the project, including blank, duplicate, and standard reference samples in each batch of 20 samples delivered to the assay lab. Drill core samples are shipped internally to ALS Minerals Labs at Whitehorse, Yukon for preparation, with multi-element ICP, fire assay and overlimit analyses completed at the ALS Minerals facility in North Vancouver, British Columbia.

About Alexco

Alexco is a Canadian primary silver company that owns and operates the majority of the historic Keno Hill Silver District, in Canada's Yukon Territory, one of the highest-grade silver deposits in the world. Alexco is currently advancing Keno Hill to commercial production and commenced concentrate production and shipments in the first quarter of 2021. Keno Hill is expected to produce an average of approximately 4.4 million ounces of silver per year contained in high quality lead/silver and zinc concentrates. Keno Hill retains significant potential to grow and Alexco has a long history of expanding the operation's mineral resources through successful exploration

Forward-Looking Statements

Some statements ("forward-looking statements") in this news release contain forward-looking information concerning Alexco's anticipated results and developments in Alexco's operations in future periods, planned exploration and development of its properties, plans related to its business and other matters that may occur in the future, made as of the date of this news release. Forward-looking statements may include, but are not limited to, statements with respect to the future remediation and reclamation activities, future mineral exploration, the estimation of mineral reserves and mineral resources, the realization of mineral reserve and mineral resource estimates, future mine construction and development activities, future mine operation and production, the timing of activities and reports, the amount of estimated revenues and expenses, the success of exploration activities, permitting time lines, requirements for additional capital and sources and uses of funds. Forward-looking statements are subject to a variety of known and unknown risks, uncertainties and other factors, which could cause actual events or results to differ from those expressed or implied by the forward-looking statements. Such factors include, among others, risks related to actual results and timing of exploration and development activities; actual results and timing of mining activities; actual results and timing of environmental services activities; actual results and timing of remediation and reclamation activities; conclusions of economic evaluations; changes in project parameters as plans continue to be refined; future prices of silver, gold, lead, zinc and other commodities; possible variations in mineable resources, grade or recovery rates; failure of plant, equipment or processes to operate as anticipated; accidents, labour disputes and other risks of the mining industry; First Nation rights and title; continued capitalization and commercial viability; global economic conditions; competition; and delays in obtaining governmental approvals or financing or in the completion of development activities. Forward-looking statements are based on certain assumptions that management believes are reasonable at the time they are made. In making the forward-looking statements included in this news release, Alexco has applied several material assumptions, including, but not limited to, the assumption that Alexco will be able to raise additional capital as necessary, that the proposed exploration and development will proceed as planned, and that market fundamentals will result in sustained silver, gold, lead and zinc demand and prices. There can be no assurance that forward-looking statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Alexco expressly disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise, except as otherwise required by applicable securities legislation.

APPENDICES

Table 1 - Location of 2021 Drill Holes with completed assays in this Release

Hole

East (m)

North (m)

Elevation (m)

Length (m)

Surface Azimuth

Surface Dip

K-21-0789D *

479664.78

7087155.44

1090.56

270.00

302.0

-74.0

K-21-0791B *

479548.60

7086986.19

1054.28

222.00

302.9

-66.4

K-21-0792D *

479599.95

7087059.77

1070.61

267.09

290.8

-71.9

K-21-0793

482175.92

7088302.35

1276.06

224.00

338.0

-56.0

K-21-0794A *

479503.60

7086909.00

1125.50

308.00

273.8

-64.4

K-21-0795

479770.41

7087087.93

1368.68

38.00

278.0

-71.0

K-21-0796 *

479770.36

7087087.84

1368.71

530.00

278.0

-72.5

K-21-0796A

479696.39

7087107.53

1139.48

320.00

291.7

-64.3

K-21-0796B

479707.63

7087102.94

1166.91

333.00

295.2

-67.0

K-21-0796C

479650.19

7087131.90

1014.99

219.80

300.4

-63.7

K-21-0796D *

479659.22

7087127.47

1036.77

217.58

296.7

-66.8

K-21-0797 *

479602.96

7086902.78

1367.25

585.50

255.0

-62.0

K-21-0797A *

479475.45

7086876.29

1111.58

292.50

266.6

-60.1

K-21-0798 *

479615.65

7086913.83

1367.43

539.00

266.0

-71.0

K-21-0798A *

479497.34

7086918.22

1061.90

286.00

294.6

-68.1

K-21-0799

479648.72

7086932.52

1369.23

528.00

300.0

-75.0

K-21-0799A

479583.07

7086983.11

1097.07

260.00

313.4

-60.3

K-21-0799B

479588.44

7086978.21

1111.33

291.00

312.0

-64.0

K-21-0799C *

479594.63

7086972.77

1130.64

336.15

309.9

-68.3

K-21-0800

479484.94

7086725.39

1369.35

539.00

308.0

-65.0

K-21-0800A

479397.86

7086804.86

1124.35

249.00

315.1

-58.9

K-21-0800B

479405.94

7086796.32

1145.27

279.00

315.8

-61.9

K-21-0800C *

479409.86

7086792.42

1155.92

262.36

314.5

-63.1

K-21-0800D

479381.12

7086816.32

1084.18

180.89

305.8

-56.8

K-21-0801 *

479731.29

7086977.72

1372.36

540.00

307.0

-69.0

K-21-0801A

479629.04

7087074.10

1049.37

198.00

315.9

-56.1

K-21-0801B

479647.64

7087056.91

1090.12

276.00

310.3

-61.8

K-21-0801C

479650.65

7087054.21

1098.16

219.30

313.3

-64.1

K-21-0802 *

479648.35

7086932.32

1369.29

551.00

279.0

-72.0

K-21-0802A

479556.41

7086960.96

1086.64

258.00

295.8

-61.6

K-21-0803 *

479485.01

7086725.54

1369.32

506.00

317.0

-64.0

K-21-0803A

479391.20

7086837.93

1091.77

202.08

322.6

-59.2


Notes

* NQ cored

Locations in UTM NAD83 -Z8 projection located by survey controlled RTK GPS

Collars of daughter holes (A, B, C, D) located at take off point from parent hole

Downhole surveys by gyro or single shot reflex

Table 2 - +30 g/t and +900 g/t Ag Composite Assay Intervals

Hole

From
(m)

To

(m)

Interval
(m)

True Width
(m)

Ag
(g/t)

Ag
(oz/t)

Au
(g/t)

Pb
(%)

Zn
(%)

Vein

K-21-0789D

158.18

161.50

3.32

2.78

92

2.95

0.04

1.28

2.60

BM2


195.00

195.40

0.40

0.34

485

15.59

0.06

0.71

0.01

BM Splay


198.25

201.65

3.40

2.87

365

11.72

0.04

0.45

0.01

BM

Including

198.25

200.60

2.35

1.98

468

15.03

0.04

0.58

0.01

BM












K-21-0791B

206.33

206.80

0.47

0.30

132

4.24

0.16

1.25

0.04

BM


210.00

214.02

4.02

2.59

251

8.06

0.10

0.60

0.02

BM


216.97

217.27

0.30

0.20

198

6.37

0.12

0.58

0.02

BM












K-21-0792D

164.32

167.92

3.60

3.02

1273

40.93

0.54

5.88

2.04

BM2

Including

166.43

167.92

1.49

1.25

2848

91.56

0.65

6.89

2.55

BM2


233.21

233.37

0.16

0.09

844

27.14

0.13

7.74

0.45

FW splay


244.02

250.41

6.39

3.51

609

19.56

0.13

3.16

0.18

FW

Including

244.43

248.08

3.65

2.01

973

31.28

0.19

5.05

0.14

FW


259.60

262.25

2.65

1.46

46

1.49

0.01

0.18

0.00

FW splay












K-21-0793

211.57

213.13

1.56

1.19

150

4.81

0.09

1.96

5.60

Sime Aho


215.65

216.35

0.70

0.53

53

1.70

0.11

0.18

1.14

Sime Aho Splay


221.32

222.64

1.32

0.97

137

4.40

0.13

0.41

7.49

Sime Ruby












K-21-0794A

237.45

238.42

0.97

0.84

848

27.26

0.24

3.20

1.69

BM

Including

237.83

238.12

0.29

0.25

2040

65.59

0.59

2.67

1.73

BM


280.26

281.05

0.79

0.45

1795

57.71

0.28

13.30

1.45

FW












K-21-0796

467.60

469.35

1.75

1.61

1607

51.65

0.23

1.73

1.44

BM2

Including

468.55

469.35

0.80

0.74

2790

89.70

0.40

2.44

0.98

BM2


501.75

504.45

2.70

1.97

859

27.62

0.09

3.29

0.85

FW

Including

502.90

503.40

0.50

0.36

4080

131.17

0.36

14.82

2.56

FW


509.66

510.13

0.47

0.34

68

2.19

0.04

1.10

1.69

FW splay


512.86

514.50

1.64

1.20

45

1.45

0.04

0.38

1.07

FW splay


517.00

518.30

1.30

0.95

446

14.34

0.08

6.52

8.71

FW splay

Including

517.00

517.40

0.40

0.29

1170

37.62

0.10

18.15

4.90

FW splay












K-21-0796A

258.14

258.86

0.72

0.66

118

3.79

0.02

0.33

0.11

BM


261.52

262.45

0.93

0.85

99

3.19

0.06

0.13

0.04

BM splay


287.76

288.48

0.72

0.48

84

2.70

0.02

0.29

1.51

FW splay


290.50

290.98

0.48

0.32

551

17.72

0.12

3.06

2.04

FW












K-21-0796B

256.28

256.80

0.52

0.50

44

1.41

-0.01

0.01

0.01

BM2


299.50

306.74

7.24

5.43

996

32.03

0.18

3.02

1.15

FW

Including

299.50

301.11

1.61

1.21

4216

135.55

0.71

11.96

3.62

FW












K-21-0796C

93.26

93.96

0.70

0.64

32

1.03

0.22

0.13

0.21

BM2


124.39

125.59

1.20

1.10

988

46.30

0.17

0.26

0.14

BM

Including

124.39

125.14

0.75

0.69

1440

46.30

0.23

0.33

0.22

BM


154.67

156.90

2.23

1.52

153

4.90

0.06

0.60

0.37

FW

Including

155.66

155.90

0.24

0.16

992

31.89

0.34

4.58

1.90

FW












K-21-0796D

161.60

163.00

1.40

1.25

34

1.10

0.03

0.06

0.01

BM


191.70

196.10

4.40

2.73

530

17.03

0.08

0.26

0.64

FW *

Including

191.70

192.05

0.35

0.22

1675

53.85

0.12

0.88

0.13

FW


194.75

195.43

0.68

0.42

2349

75.52

0.32

1.00

1.74

FW












K-21-0797

496.91

500.19

3.28

2.88

653

20.98

0.33

2.85

3.46

BM

Including

496.91

498.44

1.53

1.34

1182

38.01

0.49

4.21

2.72

BM


515.81

517.10

1.29

1.14

986

31.69

0.14

0.33

3.70

BM splay

Including

515.81

516.17

0.36

0.32

3390

108.99

0.44

0.15

9.53

BM splay


549.70

550.73

1.03

0.71

255

8.19

0.15

0.20

0.21

FW


552.92

553.43

0.51

0.35

1300

41.80

0.39

0.02

0.03

FW


562.54

562.75

0.21

0.14

341

10.96

0.13

5.75

7.71

FW splay












K-21-0797A

207.82

216.00

8.18

7.20

1082

34.78

0.32

5.47

4.92

BM

Including

208.45

215.12

6.67

5.87

1233

39.65

0.33

6.54

5.89

BM


271.88

273.90

2.02

1.30

275

8.84

0.07

0.24

1.12

FW

Including

273.45

273.90

0.45

0.29

1010

32.47

0.17

0.17

4.62

FW












K-21-0798

509.00

511.50

2.50

1.96

177

5.70

0.04

1.60

0.58

FW












K-21-0798A

178.27

180.74

2.47

2.18

216

6.94

0.13

1.39

0.19

BM

Including

178.93

179.15

0.22

0.19

1440

46.30

0.83

6.30

2.00

BM


184.85

187.40

2.55

2.26

76

2.44

0.04

1.07

0.49

BM splay


214.96

215.27

0.31

0.18

55

1.75

0.09

0.50

0.03

FW splay


235.00

237.23

2.23

1.31

37

1.18

0.01

0.02

0.08

FW


270.18

271.30

1.12

0.66

97

3.13

0.02

0.00

0.00

Unknown Vein












K-21-0799

483.45

485.52

2.07

2.01

1121

36.03

0.33

3.07

5.19

BM2

Including

483.45

484.49

1.04

1.01

2011

64.67

0.39

5.69

8.44

BM2


488.70

490.63

1.93

1.87

32

1.03

0.01

0.14

0.21

BM2 splay


493.00

494.98

1.98

1.91

75

2.40

0.02

0.86

0.70

BM splay


498.03

498.94

0.91

0.88

653

20.99

0.10

1.68

0.03

BM


502.65

509.81

7.16

5.56

255

8.19

0.02

1.16

0.41

FW

Including

502.65

502.80

0.15

0.12

9090

292.25

0.79

34.55

2.08

FW


515.00

517.03

2.03

1.58

114

3.65

0.03

1.64

0.88

FW splay












K-21-0799A

203.15

208.60

5.45

5.06

162

5.19

0.02

0.35

1.99

BM2


212.29

213.45

1.16

1.08

137

4.42

0.08

1.88

1.52

BM


245.00

245.44

0.44

0.30

80

2.59

0.09

0.62

0.62

FW












K-21-0799B

223.10

227.00

3.90

3.58

34

1.09

0.00

0.07

0.44

BM2


232.87

234.65

1.78

1.64

53

1.71

0.02

0.35

0.42

BM splay


254.40

256.00

1.60

1.07

35

1.12

0.03

0.27

0.02

FW splay


270.30

279.55

9.25

6.20

888

28.56

0.16

0.82

0.94

FW

Including

275.16

278.30

3.14

2.11

2217

71.26

0.36

1.85

0.77

FW












K-21-0799C

255.00

255.68

0.68

0.62

104

3.34

0.01

0.01

0.03

BM2


319.16

323.36

4.20

2.69

149

4.79

0.04

0.19

0.04

FW

Including

320.90

321.31

0.41

0.26

1020

32.79

0.15

0.04

0.02

FW












K-21-0800

353.00

353.61

0.61

0.51

718

23.08

0.08

1.97

0.19

Aho splay


457.86

458.58

0.72

0.71

94

3.03

0.01

1.18

1.34

BM splay


461.00

462.34

1.34

1.31

157

5.05

0.05

0.58

2.21

BM


464.65

470.00

5.35

4.49

1205

38.73

0.21

1.17

1.13

FW

Including

465.94

469.56

3.62

3.04

1607

51.68

0.26

1.51

1.35

FW












K-21-0800A

187.75

199.42

11.67

11.09

1383

44.45

0.28

4.45

4.02

BM

Including

189.00

192.51

3.51

3.33

2959

95.14

0.57

8.08

5.05

BM

Including

197.26

198.98

1.72

1.63

2054

66.03

0.21

9.14

1.07

BM


207.77

207.96

0.19

0.18

556

17.88

0.02

0.09

33.96

BM splay


214.63

237.72

23.09

16.86

394

12.65

0.09

1.88

3.95

FW **

Including

216.42

217.91

1.49

1.09

2563

82.40

0.24

6.40

20.66

FW

Including

221.43

221.89

0.46

0.34

1165

37.46

0.22

25.49

2.67

FW

Including

230.29

235.00

4.71

3.44

643

20.66

0.13

1.48

2.28

FW












K-21-0800B

121.43

121.61

0.18

0.13

221

7.11

0.16

0.87

0.01

Aho splay


216.80

221.27

4.47

4.16

3226

103.72

0.73

12.31

3.05

BM

Including

216.80

220.63

3.83

3.56

3748

120.50

0.85

14.37

2.97

BM


241.42

241.72

0.30

0.21

1105

35.53

0.16

0.09

0.15

FW splay


244.23

246.56

2.33

1.65

76

2.43

0.03

0.06

0.43

FW splay


253.27

255.64

2.37

1.68

238

7.65

0.09

2.30

3.81

FW

Including

253.91

254.11

0.20

0.14

2140

68.80

0.26

21.64

2.05

FW


263.68

264.42

0.74

0.53

383

12.31

0.07

3.45

0.12

FW splay












K-21-0800C

214.15

220.35

6.20

6.08

42

1.36

0.10

0.16

0.31

BM


242.75

244.27

1.52

1.25

1202

38.64

0.13

11.04

0.90

FW

Including

243.68

243.97

0.29

0.24

5580

179.40

0.58

48.77

4.39

FW












K-21-0800D

54.90

57.94

3.04

2.10

127

4.08

0.26

0.30

0.82

Aho splay


135.81

139.16

3.35

3.25

62

2.00

0.18

0.27

0.47

BM


149.35

149.60

0.25

0.20

165

5.30

0.26

0.05

0.06

FW splay


163.58

170.88

7.30

5.69

673

21.64

0.12

2.68

1.95

FW

Including

163.58

164.44

0.86

0.67

4255

136.81

0.65

12.97

0.46

FW












K-21-0801

487.27

489.41

2.14

2.10

62

2.00

0.03

0.66

1.93

BM2


520.30

524.63

4.33

3.46

87

2.79

0.04

0.35

0.65

FW


530.63

532.75

2.12

1.70

596

19.15

0.10

1.62

0.18

FW

Including

530.63

531.37

0.74

0.59

1535

49.35

0.19

4.17

0.45

FW












K-21-0801A

134.01

138.59

4.58

4.40

389

12.51

0.07

0.81

0.74

BM2

Including

137.43

137.82

0.39

0.37

2110

67.84

0.14

5.61

0.13

BM2


153.49

157.48

3.99

3.83

165

5.32

0.06

2.00

1.04

BM

Including

153.49

153.71

0.22

0.21

2230

71.70

0.33

31.22

11.65

BM


166.89

167.57

0.68

0.51

55

1.76

0.03

1.13

0.55

FW splay


174.18

174.77

0.59

0.44

525

16.88

0.09

0.17

0.56

FW splay


177.00

179.34

2.34

1.80

450

14.47

0.07

0.14

2.15

FW


186.89

187.36

0.47

0.36

1640

52.73

0.32

4.42

2.24

FW splay












K-21-0801B

183.46

187.58

4.12

3.79

497

15.99

0.09

1.08

0.29

BM2

Including

185.39

186.36

0.97

0.89

1380

44.37

0.19

2.62

0.59

BM2


207.66

208.27

0.61

0.56

171

5.50

0.06

2.85

0.40

BM


245.49

254.41

8.92

5.98

216

6.96

0.06

0.63

1.07

FW

Including

247.10

247.40

0.30

0.20

3160

101.60

0.57

3.26

0.41

FW












K-21-0802

500.30

519.69

19.39

14.54

618

19.86

0.13

1.78

0.59

FW

Including

500.30

504.01

3.71

2.78

1420

45.65

0.32

5.40

0.69

FW

Including

511.28

512.85

1.57

1.18

3126

100.51

0.54

5.56

2.34

FW












K-21-0802A

208.95

210.00

1.05

0.97

302

9.71

0.08

1.46

3.91

BM


228.16

240.00

11.84

9.24

370

11.91

0.07

1.43

0.41

FW

Including

235.06

238.59

3.53

2.75

908

29.18

0.15

3.09

0.84

FW












K-21-0803

341.59

342.81

1.22

0.92

57

1.85

0.07

0.26

1.22

Aho splay


461.83

462.08

0.25

0.24

88

2.83

0.09

0.65

4.24

BM splay


464.73

476.34

11.61

11.15

543

17.46

0.21

0.80

1.18

BM

Including

468.07

468.49

0.42

0.40

6560

210.91

1.52

5.07

3.26

BM

Including

472.60

473.33

0.73

0.70

2230

71.70

0.43

2.32

10.15

BM


478.58

485.52

6.94

5.41

1331

42.80

0.25

4.15

4.55

FW

Including

479.20

480.96

1.76

1.37

3198

102.81

0.51

5.73

4.66

FW

Including

483.02

485.00

1.98

1.54

1426

45.83

0.32

6.46

4.14

FW












K-21-0803A

29.03

31.36

2.33

1.70

244

7.84

0.10

0.31

0.95

Aho splay


153.10

160.06

6.96

6.61

349

11.23

0.25

0.98

1.02

BM

Including

153.10

153.72

0.62

0.59

2360

75.88

0.65

4.76

2.24

BM


170.85

181.61

10.76

7.85

1358

43.66

0.18

5.65

3.15

FW

Including

175.64

181.61

5.97

4.36

2370

76.20

0.28

9.66

4.30

FW


30 g/t Ag composite including up to 2m interval internal waste


900 g/t Ag composite including up to 2m interval internal waste


* K-21-0796D FW Vein includes 2.17 m of internal waste (1.35 m true width)


** K-21-0800A FW Vein includes 5.42 m of internal waste (3.96 m true width)


SOURCE Alexco Resource Corp.



Contact
Clynton R. Nauman, Chairman and Chief Executive Officer; Rajni Bala, Investor Relations and Communications Lead, Phone: (778) 945-6577, Email: info@alexcoresource.com, Website: www.alexcoresource.com
Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Alexco Resource Corp.
Bergbau
-
-
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.