• Freitag, 22 November 2024
  • 18:31 Uhr Frankfurt
  • 17:31 Uhr London
  • 12:31 Uhr New York
  • 12:31 Uhr Toronto
  • 09:31 Uhr Vancouver
  • 04:31 Uhr Sydney

Rio Tinto purchases first battery-electric trains for the Pilbara

10.01.2022  |  Business Wire

Rio Tinto has agreed to purchase four battery-electric trains for use in the Pilbara region of Western Australia as part of the company's strategy to reduce its carbon emissions by 50 per cent by 2030.

Rio Tinto purchased the four 7MWh FLXdrive battery-electric locomotives from Wabtec Corporation with production due to commence in the United States in 2023 ahead of initial trials in the Pilbara in early 2024.

The locomotives, used to carry ore from the company's mines to its ports, will be recharged at purpose-built charging stations at the port or mine. They will also be capable of generating additional energy while in transit through a regenerative braking system which takes energy from the train and uses it to recharge the onboard batteries.

A full transition to net zero emissions technology of its entire fleet of rail locomotives would reduce Rio Tinto Iron Ore's diesel-related carbon emissions in the Pilbara by around 30 per cent annually.

Rio Tinto Managing Director of Port, Rail and Core Services Richard Cohen said delivery of the prototype locomotives will be an important early step for the company on the path toward a decarbonised Pilbara.

"Our partnership with Wabtec is an investment in innovation and an acknowledgement of the need to increase the pace of our decarbonisation efforts.

"Battery-electric locomotives offer significant potential for emissions reduction in the near term as we seek to reduce our Scope 1 & 2 carbon emissions in the Pilbara by 50 per cent by 2030."

Rogerio Mendonca, President of Freight Equipment for Wabtec, said the FLXdrive is ideally suited to support Rio Tinto's decarbonisation targets.

"This locomotive provides the power, fuel savings and emissions reductions to cost-effectively run rail networks in the mining industry. The rapid adoption of the FLXdrive by Rio Tinto and other mining operators demonstrates the industry's commitment to decarbonising their operations."

Once delivered, the locomotives will be trialled within controlled environments in the Pilbara and tested against a range of safety and functional criteria, including integration with AutoHaul™.

This flagship project reaffirms Rio Tinto's commitment to significantly reducing carbon emissions by switching to renewable power and rolling out electric mobile fleets across the Pilbara.



Contact

Please direct all enquiries to
media.enquiries@riotinto.com

Media Relations, Australia

Jonathan Rose
M +61 447 028 913

Matt Chambers
M +61 433 525 739

Jesse Riseborough
M +61 436 653 412

Jamie Macdonald
M +61 467 725 517

Kate Barcham
M +61 438 990 238

Rio Tinto plc

6 St James's Square
London SW1Y 4AD
United Kingdom

T +44 20 7781 2000
Registered in England
No. 719885

Rio Tinto Limited

Level 7, 360 Collins Street
Melbourne 3000
Australia

T +61 3 9283 3333
Registered in Australia
ABN 96 004 458 404

riotinto.com

Category: Pilbara


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Rio Tinto Ltd.
Bergbau
855018
AU000000RIO1

weitere Unternehmen:

Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.