• Freitag, 22 November 2024
  • 02:51 Uhr Frankfurt
  • 01:51 Uhr London
  • 20:51 Uhr New York
  • 20:51 Uhr Toronto
  • 17:51 Uhr Vancouver
  • 12:51 Uhr Sydney

Basin Uranium Completes First Hole at Mann Lake and Advances Permitting for Wray Mesa

28.04.2022  |  Newsfile

Vancouver, April 28, 2022 - Basin Uranium Corp. (CSE: NCLR) (OTC Pink: BURCF) (FSE: 6NP0) ("Basin Uranium" or the "Company") is pleased to announce it has completed the first diamond drill hole at the Mann Lake uranium project in Saskatchewan's prolific Athabasca Basin. The Mann Lake project is located 25km southwest of the McArthur River Mine, the largest high-grade uranium deposit in the world, and 15 km to the northeast along strike of Cameco's Millennium uranium deposit. In addition, the Company has engaged Star Point Enterprises to prepare Utah state exploration permits for an exploration and drill program on its Wray Mesa project.

Highlights

  • First diamond drill hole was completed to a depth of 731 metres
  • Second diamond drill hole underway at a current depth of ~185 metres (target depth of 700 metres)
  • Core logging and composite lithogeochemical sampling remains ongoing with samples being prepared for shipment to the Saskatchewan Research Council
  • Commencement of geophysical survey expected in early May 2022
  • Engaged permitting consultant for Wray Mesa exploration and drill program

"Drilling at Mann Lake is off to a smooth start. Our experienced exploration team continues to make excellent progress on our ongoing exploration program, which remains on time and budget," commented Mike Blady, CEO of Basin Uranium. "Contemporaneously, we are developing an exploration program for our Wray Mesa project with the engagement of Star Point to assist us in the preparation and submission of the permit applications."

Mann Lake Drilling & Exploration Update

The first hole was collared and completed to a target depth of 731 metres, having intersected the unconformity at approximately 650 metres vertical depth. The hole is being logged and will be sent along with the second hole to the Saskatchewan Research Council for chemical assays. The rig has now moved to the second location and is currently at a depth of approximately 180 metres and is planned for a total of 700 metres. The second hole is hole is designed to test an interpreted basement conductor (2014 MT resistivity survey), corresponding with ground UTEM conductor (A3), magnetic low (interpreted metasediment basement) and is along the edge of a gravity low. The Company's geophysical contractor is expected to be on site at the beginning of May to complete moving loop electromagnetic and gravity surveys to identify targets for an additional fall/winter drill program.

Wray Mesa Permitting Update

Star Point Enterprises, Inc. of Moab, Utah is a preeminent permitting, management, and compliance firm. The Company has retained Don Hamilton, Principal and Project Manager, to assist with both federal and state-level agency permitting. The Company is currently compiling and reviewing the historical data, which includes over 400 holes / 200,000 feet of previous drilling, in conjunction with developing an extensive exploration and drill program for the property. The Company expects to finalize the purchase of the Wray Mesa project within the coming days.

Qualified Person:

R. Tim Henneberry, PGeo (B.C.), a technical advisor to the Company, is the Qualified Person as defined by National Instrument 43-101 who has reviewed and approved the technical data in this news release.

About Basin Uranium Corp.

Basin Uranium Corp. is a Canadian junior exploration company focused diversified mineral resources. The Company recently acquired an option to acquire a 75% interest in the Mann Lake uranium project, located in the Athabasca basin in Northern Saskatchewan, Canada, and is also currently undertaking the CHG gold exploration project located approximately 15 kilometers northwest of the town of Clinton in south-central British Columbia. The CHG Project consists of seven contiguous mineral claims covering 3,606 hectares.

For further information, please visit https://basinuranium.ca or email info@basinuranium.ca.

On Behalf of the Board of Directors

Mike Blady
Chief Executive Officer
info@basinuranium.ca

Neither the Canadian Securities Exchange nor its regulation services provider accepts responsibility for the adequacy or accuracy of this news release.

FORWARD-LOOKING STATEMENTS:

Cautionary Note Regarding Forward-Looking Statements: This news release includes certain statements and information that may constitute forward-looking information within the meaning of applicable Canadian securities laws. All statements in this news release, other than statements of historical facts, including statements regarding future estimates, plans, objectives, timing, assumptions or expectations of future performance are forward-looking statements and contain forward-looking information. Generally, forward-looking statements and information can be identified by the use of forward-looking terminology such as "intends" or "anticipates", or variations of such words and phrases or statements that certain actions, events or results "may", "could", "should", "would" or "occur". Forward-looking statements are based on certain material assumptions and analysis made by the Company and the opinions and estimates of management as of the date of this news release. These forward-looking statements are subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of the Company to be materially different from those expressed or implied by such forward-looking statements or forward-looking information. Important factors that may cause actual results to vary include, without limitation, uncertainties affecting the expected use of proceeds. Although management of the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements or forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements and forward-looking information. Readers are cautioned that reliance on such information may not be appropriate for other purposes. The Company does not undertake to update any forward-looking statement, forward-looking information or financial out-look that are incorporated by reference herein, except in accordance with applicable securities laws.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/121887


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Basin Uranium Corp.
Bergbau
A3C6BE
CA07012B1067
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.