• Freitag, 22 November 2024
  • 14:47 Uhr Frankfurt
  • 13:47 Uhr London
  • 08:47 Uhr New York
  • 08:47 Uhr Toronto
  • 05:47 Uhr Vancouver
  • 00:47 Uhr Sydney

Metals Creek Drills 1.50 g/t Gold over 18.00 Meters at Dona Lake

17.05.2022  |  Newsfile

Thunder Bay, May 17, 2022 - Metals Creek Resources Corp. (TSXV: MEK) (OTCQB: MCREF) (FSE: M1C1) (the "Company" or Metals Creek) is pleased to announce additional diamond drill results from drill hole DL22-028 of the phase III diamond drill program at the Dona Lake Gold project (See News Release November 08, 2021).

Results from drill hole DL22-028 continue to define gold mineralization within main zone, south of the mine workings as well as intercepting mineralization within B-Zone at the past producing Dona Lake Gold mine. This hole targeted main zone stratigraphy outside the currently defined mineralized envelope, extending gold mineralization an additional 30m south within the deeper portion of the mineralized iron formation (See Figure 1, Schematic Long Section and Figure 2, Schematic X-Section) This hole intersected the Main Zone stratigraphy 424 meters below surface and returned a core length intercept of 2.56 grammes per ton(g/t) gold (Au) over 6.14 meters(m) ( 464.61 - 470.75m). This was a part of a broader zone of mineralization of 1.50 g/t Au over 18.00m (458.00 - 476.00m). A second zone of mineralization was intercepted (B-Zone) 473m below surface, which returned a core length intercept of 2.05 g/t Au over 9.11m, included in this is 8.88 g/t Au over 1.45m (See Table 1 Significant Results, Figure 2 Schematic X-section). Mineralization within the main zone intercept is hosted within silicate-sulfide iron formation and characterized by stringer to locally disseminated pyrrhotite ranging from 1 to 5% with local pyrite. Magnetite rich sections with local pyrrhotite stringers are locally present. The B-Zone intercept is characterized by trace to 15% disseminated to stringer pyrrhotite with minor pyrite. B-Zone has seen limited drilling historically and represents a prospective target that remains open at depth.

This phase III diamond drill program has successfully defined additional high-grade gold mineralization south of the Dona Lake mine workings. Deeper drilling targeting Main Zone stratigraphy below the lowermost mine workings has further extended high grade gold mineralization down plunge to a vertical depth of 753m (See news release April 5, 2022) from recently reported drill hole DL22-025 returning a high-grade down hole intercept of 8.11 g/t over 9.51m. This hole represents the deepest hole to date on the Dona Lake property with gold mineralization remaining open at depth.



Figure 1 Schematic Longitudinal

To view an enhanced version of this graphic, please visit:
https://orders.newsfilecorp.com/files/943/124342_553a0883242d1b3d_002full.jpg


Figure 2 Schematic Cross-section

To view an enhanced version of this graphic, please visit:
https://orders.newsfilecorp.com/files/943/124342_553a0883242d1b3d_003full.jpg

Table 1 - Significant Results

Drill Hole From (m) To (m) Total (m) Grammes Remarks
Number Per Ton Gold
DL22-026 Hit Mine Workings
DL22-028 458 476 18 1.5 Main Zone
Including 464.61 470.75 6.14 2.56 Main Zone
and 522.1 531.21 9.11 2.05 B Zone
including 522.1 523.55 1.45 8.88 B Zone



True thickness is 70-80% of drill intercept length.

Assays are pending for 3 drill holes at Dona Lake, results will be released once they are received and compiled. In addition, assays from Ogden drilling will be released once they are received and complied.

The Dona Lake Gold Project was optioned from Newmont Corporation (previously Newmont Goldcorp - see news release dated 13 June 2019) and is located in the Pickle Lake Greenstone Belt which is host to several historic mines including the Dona Lake mine, the Central Patricia mine and the Pickle Crow mine. Dona Lake is accessible by an all-weather road southeast from the Town of Pickle Lake. The Project consists of 32 patented and leased mining claims and 35 map staked claims totaling approximately 1,122 hectares and covers the past producing Dona Lake Mine.

Michael MacIsaac, P.Geo and VP Exploration for the Corporation and a qualified person as defined in National Instrument 43-101, is responsible for this release, and supervised the preparation of the information forming the basis for this release.

All split core samples were sent to Activation Laboratories. The precious metals were analyzed utilizing a standard fire assay with an atomic absorption finish. As part of the Corporations QAQC protocol, approximately 10% of the samples submitted for assay were also sent for check assays. Standards and blanks were inserted randomly into the sample shipments as part of the sampling protocol. Samples with fire assay results above 1.0 g/t gold are re-analyzed using a gravimetric finish and samples with fire assay results above 5.0 g/t gold or samples showing visible gold are analyzed using the pulp metallic method.

About Metals Creek Resources Corp.

Metals Creek Resources Corp. is a junior exploration Company incorporated under the laws of the Province of Ontario, is a reporting issuer in Alberta, British Columbia and Ontario, and has its common shares listed for trading on the Exchange under the symbol "MEK". Metals Creek has earned a 50% interest in the Ogden Gold Property from Newmont Corp., including the former Naybob Gold mine, located 6 km south of Timmins, Ontario and has an 8 km strike length of the prolific Porcupine-Destor Fault (P-DF). In addition, Metals Creek has signed an agreement with Newmont Corp.,

where Metals Creek can earn a 100% interest in the past producing Dona Lake Gold Project in the Pickle Lake Mining District of Ontario.

Metals Creek also has multiple quality projects available for option in Ontario and Newfoundland which can be viewed on the Corporation's website. Parties interested in seeking more information about properties available for option can contact the Corporation at the number below.

Additional information concerning the Corporation is contained in documents filed by the Corporation with securities regulators, available under its profile at www.sedar.com.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Alexander (Sandy) Stares, President and CEO
Metals Creek Resources Corp.
telephone: (709)-256-6060
fax : (709) -256-6061
email : astares@metalscreek.com
www.MetalsCreek.com
Twitter.com/MetalsCreekRes
Facebook.com/MetalsCreek

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/124342


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Metals Creek Resources Corp.
Bergbau
A14X17
CA59131Q2099
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.