• Freitag, 27 Dezember 2024
  • 17:14 Uhr Frankfurt
  • 16:14 Uhr London
  • 11:14 Uhr New York
  • 11:14 Uhr Toronto
  • 08:14 Uhr Vancouver
  • 03:14 Uhr Sydney

Asante Gold Announces Bibiani Gold Mine Start Of Process Plant Operations

02.06.2022  |  GlobeNewswire

Vancouver, June 02, 2022 - Asante Gold Corp. (CSE: ASE/ FRANKFURT: 1A9/U.S.OTC: ASGOF) ("Asante" or the "Company") is pleased to announce the successful refurbishment, commissioning and start of operation of the Process Plant and associated equipment at the Bibiani Gold Mine. Following an intensive period of refurbishment and upgrade of the Process Plant, principal equipment has been commissioned and confirmed operational. A 14-day period of intermittent operation is planned to test controls, calibrate operating systems and align critical equipment "under full load". This is expected to lead to 24 hour/day operation by the end of June 2022.

The Bibiani Gold Mine came out of care and maintenance in September 2021 and an extensive refurbishment program has continued since that time. With the support of its key contractors, Asante remains on track to pour gold in the third quarter of 2022.

The mining program is on track, with material movement running at 6M tonnes per month. Stockpiling of mineralized material on the Run of Mine Pad (ROM) has been ongoing since mining commenced in February 2022. As of late May there are +200,000 tonnes of mineralized material on the ROM Pad.

Comprehensive refurbishment has been completed on the primary crusher, all conveyors, SAG and Ball Mills, ancillary equipment, all mechanical drives, lubrication systems, electric motors, pumps, piping, electric systems, instrumentation systems, valves, steelwork, rubber installations and civil works.

Asante is pleased to recognize and thank the team from Harlequin International, which conducted the refurbishment program and ensured a high level of quality work was completed safely.

Dave Anthony, President and CEO stated, "We are pleased that our refurbishment efforts at the Bibiani Gold Mine have been delivered ahead of schedule. The excellent and timely work completed safely by Ghanaian contractors, is just another example of how the Ghanaian mining industry is fully resourced to support development and maintenance of modern, large-scale mining operations. With the Process Plant operational, Asante is now ready to advance with Start of Operations."

About Asante Gold Corporation

Asante is a gold exploration, project development and operations company with a high-quality portfolio of projects in Ghana, Africa's largest and most reliable gold producer. Asante is currently focused on completing the purchase of the Chirano Gold Mine previously announced on April 25, 2022 and developing to production its Bibiani and Kubi Gold mines located on the prolific Bibiani and Ashanti Gold Belts. Asante has an experienced and skilled team of mine finders, builders and operators. Asante is listed on the Canadian Securities Exchange and Frankfurt Stock Exchange and has announced plans to co-list its shares in Ghana. Asante is also exploring its Keyhole, Fahiakoba and Betenase projects for new discoveries, all adjoining or along strike of major gold mines near the centre of Ghana's Golden Triangle. Additional information is available on our web site at www.asantegold.com.

About the Bibiani Gold Mine

The Bibiani Gold Mine is a historically significant Ghanaian gold mine situated in the Western North region of Ghana. Bibiani has previous production of +4Moz, is fully permitted with available mining and processing infrastructure on site consisting of a 3 million tonne per annum mill and processing plant.

The Current Mineral Resource Estimate for Bibiani, effective as of November 7, 2021, as set out in the Technical Report titled "Technical Report on the Bibiani Gold Mine, Ghana", prepared by Ian M. Glacken (FAusIMM (CP), FAIG, CEng) of Optiro Pty Limited and assisted by Dan Bansah (MSc, MAusIMM (CP), FWAIMM, MGIG) of Minecon Resources and Services Ltd. as Qualified Person and filed on SEDAR, is Measured and Indicated for the Bibiani main pit and the Satellite pits at 20.8 million tonnes at 2.71 grams of gold per tonne for 1.81 Moz of gold; and Inferred 8.41 million tonnes at 2.78 grams of gold per tonne for 0.753 Moz of gold. The Mineral Resource has been reported above a 0.65 g/t gold cut-off and has been depleted for both historical open pit and underground development as of August 31, 2017. The Technical Report was prepared using accepted industry practices in accordance with the JORC Code (JORC, 2012). There are no material differences between the definitions of Measured, Indicated and Inferred Mineral Resources under the CIM Definition Standards and the equivalent definitions in the JORC Code. The Satellite pit resource is an update completed in 2018 by Resolute Mining Ltd., the former owner of the Bibiani Gold Mine. The Satellite pit resource is also reported above a cut-off grade of 0.65 g/t gold inside a pit shell defined at a gold price of US$1,950. Mineral resources that are not mineral reserves do not have demonstrated economic viability.

About the Chirano Gold Mine

Chirano is an operating open-pit and underground mining operation located in southwestern Ghana, immediately south of the Company's Bibiani Gold Mine. Chirano was first explored and developed in 1996 and began production in October 2005. The mine comprises the Akwaaba, Suraw, Akoti South, Akoti North, Akoti Extended, Paboase, Tano, Obra South, Obra, Sariehu and Mamnao open pits and the Akwaaba and Paboase underground mines. Gold Equivalent Production in 2021 was 154,668 oz on a 100% basis (source Kinross Gold Corp.).

Qualified Person Statement

Scientific and technical information contained in this news release has been reviewed and approved by Kwamina Ackun-Wood, a member of the Australasian Institute of Mining and Metallurgy, and the Exploration Manager for Mensin Gold Bibiani Ltd. (a wholly owned subsidiary of Asante Gold Corp.), and who is a "qualified person" under NI 43-101.

For further information please contact:

Dave Anthony, President & CEO: +1 647 382 4215 (Canada) or +233 558 799 3309 (Ghana) or dave@asantegold.com
Malik Easah, Executive Director, malik@asantegold.com
Alec Rowlands, Capital Markets Consultant, alec@asantegold.com
Valentina Gvozdeva, Manager IR, valentina@asantegold.com
Kirsti Mattson, Media Relations, kirsti.mattson@gmail.com

Cautionary Statement on Forward-Looking Statements

This news release contains forward-looking statements. Forward-looking statements involve risks, uncertainties and other factors that could cause actual results, performance, prospects, and opportunities to differ materially from those expressed or implied by such forward-looking statements, including statements regarding the structure and terms of the Chirano Acquisition, timing for completion of the Chirano Acquisition, the ability of the Company to complete the Chirano Acquisition on the terms announced, the ability of the parties to satisfy all administrative matters required in order to consummate the Chirano Acquisition, anticipated synergies, the resources, reserves, exploration results, and development program at Chirano, Bibiani and Kubi, including timing of future mine development and the start of production. Factors that could cause actual results to differ materially from these forward-looking statements include, but are not limited to, the inability to satisfy any condition required to complete the Chirano Acquisition, termination of the share purchase agreement, variations in the nature, quality and quantity of any mineral deposits that may be located, the Company's inability to obtain any necessary permits, consents or authorizations required for its planned activities, and the Company's inability to raise the necessary capital or to be fully able to implement its business strategies. The reader is referred to the Company's public disclosure record which is available on SEDAR (www.sedar.com). Although the Company believes that the assumptions and factors used in preparing the forward-looking statements are reasonable, undue reliance should not be placed on these statements, which only apply as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. Except as required by securities laws and the policies of the Canadian Securities Exchange, the Company disclaims any intention or obligation to update or revise any forward-looking statement, whether as a result of new information, future events or otherwise.

LEI Number: 529900F9PV1G9S5YD446. Neither IIROC nor any stock exchange or other securities regulatory authority accepts responsibility for the adequacy or accuracy of this release.



Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Asante Gold Corp.
Bergbau
A1JUY6
CA04341X1078
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.