• Freitag, 22 November 2024
  • 15:40 Uhr Frankfurt
  • 14:40 Uhr London
  • 09:40 Uhr New York
  • 09:40 Uhr Toronto
  • 06:40 Uhr Vancouver
  • 01:40 Uhr Sydney

Golden Independence Provides Independence Project Update

08.06.2022  |  Newsfile

Vancouver, June 8, 2022 - Golden Independence Mining Corp. (CSE: IGLD) (OTCQB: GIDMF) (FSE: 6NN) (the "Company" or "Golden Independence") is pleased to provide an update on ongoing permitting and project-related activities at it's Independence heap-leach development project in Nevada.

  • NDEP approval for geochemical sampling & analysis plan
  • Commencement of NV Energy engineering study
  • NOI for additional resource and geotechnical drilling
  • Re-sampling and assaying of 725 feet of historical core drilling

"We continue to advance the Independence project along the development path, in addition to derisking the project." commented Jeremy Poirier, Chief Executive Officer. "We have engaged the leading power provider, NV Energy, to complete a scoping study along a new services corridor for stand-alone development. With the water rights we have already secured, the power corridor represents the last outstanding piece of critical project infrastructure required. In addition, we continue to refine the resource model with the resampling of over 725 feet of historical core and through the permitting for additional oxide resource expansion and geotechnical drilling. The expedited permitting and development timeline represents a significant strength of the project, relative to other projects in the State of Nevada."

NDEP Approval of Geochemical Sampling and Analysis Plan

The State of Nevada Division of Environmental Protection (NDEP) has approved the Company's geochemical sampling and analysis plan for the proposed open-pit heap-leach operation as outlined in the January 2022 Preliminary Economic Assessment. This represents the culmination of over one year's worth of humidity cell testing and analysis of 150 selected representative samples.

Commencement of Scoping Study with NV Energy

The Company has engaged NV Energy, the leading power and utility company servicing northern and southern Nevada, to provide an engineering study on providing independent power services for the development and operation of the Independence project. The commencement of this study comes as a result of a successful wildlife and fauna study across the proposed new corridor for independent power and services to support the proposed project.

NOI for Additional Resource and Geotechnical Drilling

The Company has filed two (2) amended Notice of Intent permits with the Nevada Bureau of Land Management (Nevada BLM) for additional oxide resource expansion and geotechnical drilling totalling 41 proposed drill holes totaling an estimated 27,500 feet.

Resampling and Assaying of Historical Core Drilling

The Company has also undertaken a program of relogging and resampling of historical drilling, as the deeper drilling on the project targeting the skarn mineralization left the upper portions of mineralization uninvestigated. Specifically, 725 feet of samples from IND#1 (from 144.5 - 136.5 ft and 325 - 607 ft) and IND#7 (8 - 97 ft, 197.5 - 213 ft, 236 - 312 ft, and 2,604 - 2,703 ft) have been sent to the lab for assays.

The technical content of this news release has been reviewed and approved by R. Tim Henneberry, P.Geo. (BC), a Director and President of Golden Independence Mining Corp. and a Qualified Person under National Instrument 43-101.

About Golden Independence Mining Corp.

Golden Independence Mining Corp. is a development company currently focused on the advanced-stage Independence project located adjacent to Nevada Gold Mine's Phoenix-Fortitude mine in the Battle Mountain-Cortez Trend of Nevada. The Independence project hosts an M&I resource of 334,300 ounces of gold and an Inferred resource of 847,000 ounces of gold with a substantial silver credit. A 2021 Preliminary Economic Assessment (PEA) outlined a low-cost heap leach operation focusing on the near-surface resource with total production of 195,443 ounces of gold at an all-in sustaining cost of US$1,078 per ounce of gold.

FOR FURTHER INFORMATION PLEASE CONTACT:

Jeremy Poirier, Interim Chief Executive Officer
Telephone: 604-722-9842

This press release contains forward-looking information (within the meaning of applicable Canadian securities legislation) that involves various risks and uncertainties regarding future events. Such forward-looking information includes statements based on current expectations involving a number of risks and uncertainties and such forward-looking statements are not guarantees of future performance of the Company. There are numerous risks and uncertainties that could cause actual results and the Company's plans and objectives to differ materially from those expressed in the forward-looking information in this news release, including without limitation, risks related to uncertainties inherent in the preparation of PEAs, drill results and the estimation of mineral resources, including changes in the economic parameters, risks relating to not securing agreements with third parties or not receiving required permits, risks associated with executing the Company's objectives and strategies, including costs and expenses, as well as those risk factors discussed in the Company's most recently filed management's discussion & analysis. Actual results and future events could differ materially from those anticipated in such information. This forward-looking information is based on estimates and opinions of management on the date hereof and is expressly qualified by this notice. Risks and uncertainties about the Company's business are more fully discussed in the Company's disclosure materials filed with the securities regulatory authorities in Canada at www.sedar.com. The Company assumes no obligation to update any forward-looking information or to update the reasons why actual results could differ from such information unless required by applicable law.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/126866


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Nexus Uranium Corp.
Bergbau
A3EXYF
CA65345P1018
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.