• Freitag, 22 November 2024
  • 15:43 Uhr Frankfurt
  • 14:43 Uhr London
  • 09:43 Uhr New York
  • 09:43 Uhr Toronto
  • 06:43 Uhr Vancouver
  • 01:43 Uhr Sydney

Oroco Resource Corp. Resumes Drilling At Santo Tomas

05.07.2022  |  GlobeNewswire
Vancouver, July 05, 2022 – Oroco Resource Corp. (TSX-V: OCO; OTC: ORRCF) (“Oroco” or “the Company”) is pleased to announce that it has resumed its drilling operations at Santo Tomas as the Federal military operations in the area have ended. Drilling commenced overnight at Brasiles with the resumption of Hole B007, and in the North Zone with the continuation of Hole N020.

“A safe and orderly return to drilling has been undertaken and we look forward to increasing our productivity with the additional drill capacity that is being planned” stated Richard Lock, Oroco’s CEO.

Core logging and assaying have continued during the period of drill stoppage, with an improvement in methods of handling and analysis, thereby better preparing the geological team for an increase in the rate of core processing.

In addition, Oroco has started work with Ausenco to prepare a 43-101 Preliminary Economic Assessment (PEA). Initial work on metallurgical testing is underway with samples being selected for shipment to the lab. It is planned for the PEA to be completed in Q1 2023.


ABOUT OROCO:

The Company holds a net 73.2% interest in the collective 1,172.9 ha Core Concessions of the Santo Tomas Project in NW Mexico and may increase that majority interest up to an 85.5% interest with a project investment of up to CAD$30 million. The Company also holds a 77.5% interest in 7,807.9 ha of mineral concessions surrounding and adjacent to the Core Concessions (for a total project area of 22,192 acres). The Project is situated within the Santo Tomas District, which extends from Santo Tomas up to the Jinchuan Group’s Bahuerachi project, approximately 14 km to the northeast. Santo Tomas hosts a significant copper porphyry deposit defined by prior exploration spanning the period from 1968 to 1994. During that time, the property was tested by over 100 diamond and reverse circulation drill holes, totalling approximately 30,000 meters. Based on data generated by these drill programs, a historical Prefeasibility Study was completed by Bateman Engineering Inc. in 1994.

The Santo Tomas Project is located within 160 km of the Pacific deep-water port at Topolobampo and is serviced via highway and proximal rail (and parallel corridors of trunk grid power lines and natural gas) through the city of Los Mochis to the northern city of Choix. The property is reached by a 32 km access road originally built to service Goldcorp’s El Sauzal Mine in Chihuahua State.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accept responsibility for the adequacy or accuracy of this release.


Cautionary Note Regarding Forward-Looking Information

This news release includes certain “forward-looking information” and “forward-looking statements” (collectively “forward-looking statements”) within the meaning of applicable Canadian securities legislation. All statements, other than statements of historical fact included herein, including without limitation, statements relating to future events or achievements of the Company, are forward-looking statements. There can be no assurance that such forward-looking statements will prove to be accurate, and actual results and future events could differ materially from those anticipated or implied in such statements. Many factors, both known and unknown, could cause actual results, performance or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements. Readers should not place undue reliance on the forward-looking statements and information contained in this news release concerning these matters. Oroco does not assume any obligation to update the forward-looking statements should they change, except as required by law.




Contact Data

Richard Lock, CEO
Oroco Resource Corp.
(604) 688-6200
info@orocoresourcecorp.com
Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Oroco Resource Corp.
Bergbau
A0Q2HB
CA6870331007
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.