Golden Lake Reports Phase 2 Drill Results; Intercepts 3.31 G/T Gold and 209.5 G/T Silver Over 3.96 Metres From the Hamburg Mine Zone, Jewel Ridge Project, Nevada

09.09.2022  |  Accesswire

VANCOUVER, September 9, 2022 - Golden Lake Exploration Inc. (CSE:GLM) ("GLM" or the "Company") (OTCQB:GOLXF) is pleased to report remaining assay results from its Phase 2 diamond drill program, on the Company's keystone Jewel Ridge Property ("Property"), located in the prolific Eureka gold district, Nevada (Table 1). The Jewel Ridge property is located along strike and contiguous to I-80 Gold Corp.'s Archimedes/Ruby Hill gold mine to the north, Paycore Minerals Inc.'s FAD property to the northwest, and Timberline Resources' advanced-stage Lookout Mountain project to the south1. Drilling comprised 9 holes (1,513.3 metres) on the Hamburg Zone at the south end of the Property, and the initial drilling on the Catlin Zone comprised of 2 holes (398.9 metres) (Table 2). As previously reported the Hamburg Zone returned a significant intercept of 26.37 metres averaging 5.38 grams gold per tonne (g/t Au) from a shallow depth of 42.64 metre in hole JR-22-36DD (press release March 23, 2022).

A total of 11 holes (1.912.3 metres) are reported in this press release, including holes JR-22-39DD to JR-22-50 DD (note JR-22-43DD was lost) (Tables 1 and 2). Highlights of the drill program include:

  • Highest grade intercept was returned in hole JR-22-50DD on the Hamburg Zone from a depth of 132.28 metres, returning 3.31 g/t Au, and 209.5 g/t Ag with 1.55 percent(%) lead (Pb) and .70 % zinc (Zn) over a core width of 3.96 metres.
  • The most significant intersection (based on core width times gold grade) was returned in hole JR-22-40DD, on the Hamburg Zone, averaging 41.15 metres over a core width of 1.05 g/t Au and 3.9 g/t Ag, from a depth of 128.63 metres,
  • Only two holes were drilled on the Catlin Zone, and both returned higher silver values associated with Carbonate Replacement Deposit ("CRD") mineralization. Hole JR-22-45DD returned 0.17 g/t Au and 308.6 g/t Ag over 4.05 metres from a depth of 62.09 metres, and hole JR-22-46DD returned 5.23 g/t Au and 84.0 g/t Ag over 1.52 metres from a depth of 9.75 metres. Additional drilling is required to determine the extent and orientation of CRD mineralization at the Catlin Zone.
  • The Hamburg target is approximately 1.8 kilometres south-southeast of the Eureka Tunnel target, where the Company was actively exploring throughout most of 2021. At the Hamburg Mine, historic gold production from the underground and open pit workings, and previous exploration activities had focused on oxide gold mineralization in the Hamburg Dolomite unit, and/or at the contact of the Hamburg Dolomite with the Dunderberg Shale.

1The mines and exploration projects in the Eureka District provide geologic context for the Jewel Ridge Property, but this is not necessarily an indication that the Project hosts similar grades or tonnages of mineralization.

TABLE 1: DRILL RESULTS

HOLE

ZONE

FROM

TO

LENGTH

GOLD

SILVER

LEAD

ZINC

INTERVAL

ID

NAME

(m)

(m)

(m)

(g/t)

(g/t)

(%)

(%)

COMMENTS

JR-22-39DD

Hamburg

5.18

15.85

10.67

0.36

3.7

0.21

0.37

CRD-Hamburg Dolomite

15.85

29.57

13.72

0.76

5.6

0.32

0.47

CRD-Hamburg Dolomite

37.19

43.37

6.19

0.42

6.3

0.09

2.28

CRD-Hamburg Dolomite

65.65

87.48

21.82

0.15

2.9

N/A

N/A

Carlin-Hamburg Dolomite

159.41

168.25

8.84

0.16

1.3

N/A

N/A

Carlin-Hamburg Dolomite

JR-22-40DD

Hamburg

73.76

80.80

7.04

0.30

2.4

N/A

N/A

Carlin-Hamburg Dolomite

107.41

117.96

10.55

0.77

1.6

N/A

N/A

Carlin-Hamburg Dolomite

127.10

146.91

19.81

0.41

2.0

N/A

N/A

Carlin-Hamburg Dolomite

JR-22-41DD

Hamburg

128.63

169.77

41.15

1.05

3.9

N/A

N/A

Carlin-Hamburg Dolomite
including

136.25

142.34

6.10

4.35

6.6

N/A

N/A

Carlin-Hamburg Dolomite

186.54

198.73

12.19

0.17

0.9

N/A

N/A

Carlin-Hamburg Dolomite

JR-22-42DD

Hamburg

66.14

90.53

24.38

1.35

2.9

N/A

N/A

Carlin-Hamburg Dolomite
including

70.71

74.52

3.81

6.58

12.6

N/A

N/A

Carlin-Hamburg Dolomite

99.67

108.14

8.47

0.27

0.8

N/A

N/A

Carlin-Hamburg Dolomite

111.86

117.96

6.10

0.14

3.4

N/A

N/A

Carlin-Hamburg Dolomite

JR-22-44DD

Hamburg

46.33

58.52

12.19

0.25

1.9

N/A

N/A

Carlin-Hamburg Dolomite

87.48

96.62

9.14

0.20

1.3

N/A

N/A

Carlin-Hamburg Dolomite

125.58

131.67

6.10

0.30

1.4

N/A

N/A

Carlin-Hamburg Dolomite

143.87

163.68

19.81

0.17

0.3

N/A

N/A

Carlin-Hamburg Dolomite

JR-22-45DD

CATLIN

62.09

66.14

4.05

0.17

308.6

N/A

N/A

CRD

152.67

169.77

17.10

0.33

6.6

N/A

N/A

CRD

JR-22-46DD

CATLIN

2.13

6.71

4.57

0.39

31.5

0.63

1.25

CRD

9.75

11.28

1.52

5.23

84.0

1.39

0.9

CRD

JR-22-47DD

Hamburg

89.00

114.91

25.91

0.23

1.3

N/A

N/A

Carlin-Hamburg Dolomite
including

107.29

108.69

1.40

1.61

3.4

N/A

N/A

Carlin-Hamburg Dolomite

148.44

161.24

12.80

0.42

6.1

N/A

N/A

Carlin-Hamburg Dolomite
including

157.58

160.63

3.05

0.93

1.6

N/A

N/A

Carlin-Hamburg Dolomite
JR-22-48DD Hamburg

101.19

113.39

12.19

0.14

1.8

N/A

N/A

Carlin-Hamburg Dolomite
JR-22-49DD Hamburg

0.00

3.66

3.66

5.54

44.1

2.44

0.93

Dump

JR-22-50DD

Hamburg

104.24

113.39

9.14

0.25

1.4

N/A

N/A

Carlin-Hamburg Dolomite

121.01

137.77

16.76

1.12

54.3

0.48

0.40

CRD-Hamburg Dolomite
including

132.28

136.25

3.96

3.31

209.5

1.55

0.70

CRD-Hamburg Dolomite

Drilling has stopped on the Jewel Ridge project while the Company awaits the approval of the comprehensive Plan of Operation (PoO) over most of the Jewel Ridge property. EM Strategies, based in Reno, Nev., has led the preparation and submission to the Bureau of Land Management (BLM) for the PoO process. The Jewel Ridge PoO represents a significant stage and asset for the company, as the baseline studies completed (biological, hydrological, and archeological) will be essential for any future development of a gold deposit on the property. The PoO over the property, and the larger disturbance allowance, will give the company more flexibility in planning and permitting future drill sites.

The Company has recently completed a ground gravity survey over the entire Jewel Ridge property. The survey was contracted to MaGee Geophysical Services and the results are currently being reviewed by Golden Lake geologists.

Drilling Quality assurance and quality control statement

The HQ- and PQ-sized drill core reported in this news release was logged and prepared at the Golden Lake Exploration core facility in Eureka, Nevada, where it was cut, bagged and prepared for analysis before submittal Paragon Geochemical Laboratories Inc., Nevada, USA. Core rock samples were analyzed using a multi-element analysis with ICP-MS analytical package ("50AR-MS"; aqua regia digestion). Over limit sample values were re-assayed for: (1) values of copper >1%; (2) values of zinc >1%; (3) values of lead >1%; and (4) values of silver >100 g/t using the high-grade material ICP-OES analytical package ("OLAR-OES"). Gold and Silver fire assays established gold and silver grades using 30 gram samples ("Au-AA30; Ag-AA30) with overlimit gold (5 ppm) and silver (100 ppm) fire assays by gravimetric finish (Au-GRAV; Ag-GRAV). Certified standards, blanks, and duplicates were inserted into the sample shipment to ensure integrity of the assay process. Selected samples were chosen for duplicate assay from the coarse reject and pulps of the original sample. No QA/QC issues were noted with the results reported.

TABLE 2: DRILL HOLE COLLAR INFORMATION

Hole

Easting

Northing

Elevation

Depth

Azimuth

Inclination

ID

(Metres)

(Metres)

(Metres)

(Metres)

(Degrees)

(Degrees)

JR-22-39DD

587958

4368793

2343

203.30

-50

180

JR-22-40DD

588031

4368725

2370

156.06

-50

214

JR-22-41DD

588014

4368737

2368

213.97

-65

220

JR-22-42DD

588027

4368727

2369

183.49

-50

263

JR-22-43DD

587968

4368800

2343

29.57

-70

210

JR-22-44DD

587966

4368797

2343

183.49

-70

210

JR-22-45DD

587825

4369537

2291

215.49

-50

320

JR-22-46DD

587823

4369540

2291

183.49

-50

272

JR-22-47DD

588000

4368313

2391

178.00

-50

65

JR-22-48DD

587997

4368381

2382

183.49

-50

65

JR-22-49DD

588086

4368640

2350

40.23

-50

246

JR-22-50DD

588083

4368574

2367

171.30

-50

245

About the Jewel Ridge Property

The Jewel Ridge property is located on the south end of Nevada's prolific Battle Mountain - Eureka trend, along strike and contiguous to I-80 Gold Corp.'s Archimedes/Ruby Hill gold mine to the north and Timberline Resources' advanced-stage Lookout Mountain project to the south. The mines and exploration and development projects in the Battle Mountain-Eureka Trend provide geologic context for the Jewel Ridge Property, but this is not necessarily indicative that the Project host similar grades or tonnages of mineralization.

The property comprises 96 unpatented lode mining claims and 30 patented claims covering approximately 728 hectares (1,800 acres). The Jewel Ridge property contains several historic small gold mines. The Company's focus is on Carlin-style disseminated gold deposits, the primary focus in the area since the late 1970s.

Qualified person

Golden Lake Exploration's disclosure of a technical or scientific nature in this news release has been reviewed and approved by Daniel MacNeil, P.Geo., who serves as a qualified person under the definition of National Instrument 43-101.

About Golden Lake Exploration Inc.

Golden Lake Exploration is a junior public mining exploration company engaged in the business of mineral exploration and the acquisition of mineral property assets. Its objective is to acquire, explore and develop economic precious and base metal properties of merit and to aggressively advance its exploration program on the Jewel Ridge property. The Jewel Ridge property is located on the south end of Nevada's prolific Battle Mountain-Eureka trend, along strike and contiguous to Barrick Gold's Archimedes/Ruby Hill gold mine to the north and Timberline Resources' advanced-stage Lookout Mountain project to the south. The Company also owns a large (37.814 hectare) early-stage property in south-central British Columbia, contiguous to Kodiak Copper Corp., and Gold Mountain Mining Inc., that is highly prospective for copper-gold porphyry and mesothermal gold-bearing quartz-vein mineralization.

ON BEHALF OF THE BOARD

"Mike England"
Mike England, CEO & DIRECTOR

FOR FURTHER INFORMATION PLEASE CONTACT:
Telephone: 1-604-683-3995
TollFree:1-888-945-4770

Neither the Canadian Stock Exchange nor its Regulation Services Provider accepts responsibility for the adequacy or accuracy of this release.

FORWARD LOOKING STATEMENTS: This news release contains forward-looking statements, which relate to future events or future performance and reflect management's current expectations and assumptions. Such forward-looking statements reflect management's current beliefs and are based on assumptions made by and information currently available to the Company. Investors are cautioned that these forward looking statements are neither promises nor guarantees, and are subject to risks and uncertainties that may cause future results to differ materially from those expected. These forward-looking statements are made as of the date hereof and, except as required under applicable securities legislation, the Company does not assume any obligation to update or revise them to reflect new events or circumstances. All of the forward-looking statements made in this press release are qualified by these cautionary statements and by those made in our filings with SEDAR in Canada (available at WWW.SEDAR.COM).

SOURCE: Golden Lake Exploration Inc.



View source version on accesswire.com:
https://www.accesswire.com/715302/Golden-Lake-Reports-Phase-2-Drill-Results-Intercepts-331-GT-Gold-and-2095-GT-Silver-Over-396-Metres-From-the-Hamburg-Mine-Zone-Jewel-Ridge-Project-Nevada


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Golden Lake Exploration Inc.
Bergbau
A2PJ4R
CA38110W1068
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.