Tempus Drills More Visible Gold at No9 Vein - Elizabeth Project
PERTH, September 26, 2022 - Tempus Resources Ltd. ("Tempus" or "the Company") (ASXTMR)(TSX.V:TMRR)(OTCQB:TMRFF) is pleased to announce that it has intersected quartz veining containing visible gold in drill hole EZ-22-28, targeting the No. 9 Vein at the Elizabeth Gold Project in Southern British Columbia, Canada.
HIGHLIGHTS
- Drilling has identified Visible Gold ('VG') in several locations in quartz veining over a length of approximately 2 metres in drill-hole EZ-22-28
- Tempus has completed 9 holes targeting the No. 9 Vein with VG identified in three holes (EZ-22-19, EZ-22-20, EZ-22-28), assays are pending
Tempus Resources, President and CEO, Jason Bahnsen, commented "We now have 9 drill-holes into the No. 9 Vein located 120 metres north west of the Blue Vein. This is the third drill hole reporting visible gold in the core. We are encouraged by the wide zones of mineralisation we are seeing in the previously unexplored No. Vein. Assays are pending for all 9 holes."
The No. 9 Vein is a previously mapped vein approximately 120 metres north west of Blue Vein. Some limited exploration had been performed on No. 9 Vein in the 1940s and 1950s.
Photo 1: No. 9 EZ-22- 28 Drill Core Showing Visible Gold from 117.50m - 118.15m
DDH EZ-22-28
EZ-22-28 intersected the No. 9 Vein approximately 100m to the north of the previously announced No. 9 Vein drill holes EZ-22-19 and EZ-22-20 that contained wide zones of quartz with visible gold. See Figure 1 and Tempus announcement of 15 August 2022 for full details.
EZ-22-28 intersected quartz veining of approximately 2 metres from 117.50 metres depth that contained multiple specks of visible gold, see Photo 1. Nine drill-holes have been completed targeting the No. 9 Vein. Visible gold has been reported in 3 of the nine drill holes completed to date. Assays are pending on all holes.
With reference to the AIG 2015 guidance for visual reporting of massive sulphide mineralisation, the Company reports it has not encountered any massive sulphide mineralisation in drill hole EZ-22-28. While it is not possible to accurately estimate the percentage of visual gold present though out the drill core, the Company suggests that the percentage would be less than 0.01%. The Company cautions that visual observations of visible gold are not a proxy or substitute for laboratory analysis. Laboratory assays and analysis will be required to confirm the visual interpretations presented in this news release.
Figure 1 - Elizabeth Plan View Showing 2022 Drill Locations
This announcement has been authorised by the Board of Directors of Tempus Resources Ltd..
Competent Persons Statement
Information in this report relating to Exploration Results is based on information reviewed by Mr. Sonny Bernales, who is a Member of the Engineers and Geoscientists British Columbia (EGBC), which is a recognised Professional Organisation (RPO), and an employee of Tempus Resources. Mr. Bernales has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined by the 2012 Edition of the Australasian Code for reporting of Exploration Results, Mineral Resources and Ore Reserves, and as a Qualified Person for the purposes of NI43-101. Mr. Bernales consents to the inclusion of the data in the form and context in which it appears.
For further information:
Tempus Resources Ltd.
Melanie Ross - Director/Company Secretary Phone: +61 8 6188 8181
About Tempus Resources Ltd
Tempus Resources Ltd. ("Tempus") is a growth orientated gold exploration company listed on ASX ("TMR") and TSX.V ("TMRR") and OTCQB ("TMRFF") stock exchanges. Tempus is actively exploring projects located in Canada and Ecuador. The flagship project for Tempus is the Blackdome-Elizabeth Project, a high grade gold past producing project located in Southern British Columbia. Tempus is currently midway through a drill program at Blackdome-Elizabeth that will form the basis of an updated NI43-101/JORC resource estimate. The second key group of projects for Tempus are the Rio Zarza and Valle del Tigre projects located in south east Ecuador. The Rio Zarza project is located adjacent to Lundin Gold's Fruta del Norte project. The Valle del Tigre project is currently subject to a sampling program to develop anomalies identified through geophysical work.
Forward-Looking Information and Statements
This press release contains certain "forward-looking information" within the meaning of applicable Canadian securities legislation. Such forward-looking information and forward-looking statements are not representative of historical facts or information or current condition, but instead represent only the Company's beliefs regarding future events, plans or objectives, many of which, by their nature, are inherently uncertain and outside of Tempus's control. Generally, such forward-looking information or forward-looking statements can be identified by the use of forward-looking terminology such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or may contain statements that certain actions, events or results "may", "could", "would", "might" or "will be taken", "will continue", "will occur" or "will be achieved". The forward-looking information and forward-looking statements contained herein may include, but are not limited to, the ability of Tempus to successfully achieve business objectives, and expectations for other economic, business, and/or competitive factors. Forward-looking statements and information are subject to various known and unknown risks and uncertainties, many of which are beyond the ability of Tempus to control or predict, that may cause Tempus' actual results, performance or achievements to be materially different from those expressed or implied thereby, and are developed based on assumptions about such risks, uncertainties and other factors set out herein and the other risks and uncertainties disclosed under the heading "Risk and Uncertainties" in the Company's Management's Discussion & Analysis for the quarter and nine months ended March 31, 2022 dated May 16, 2022 filed on SEDAR. Should one or more of these risks, uncertainties or other factors materialize, or should assumptions underlying the forward-looking information or statements prove incorrect, actual results may vary materially from those described herein as intended, planned, anticipated, believed, estimated or expected. Although Tempus believes that the assumptions and factors used in preparing, and the expectations contained in, the forward-looking information and statements are reasonable, undue reliance should not be placed on such information and statements, and no assurance or guarantee can be given that such forward-looking information and statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information and statements.
The forward-looking information and forward-looking statements contained in this press release are made as of the date of this press release, and Tempus does not undertake to update any forward-looking information and/or forward-looking statements that are contained or referenced herein, except in accordance with applicable securities laws. All subsequent written and oral forward-looking information and statements attributable to Tempus or persons acting on its behalf are expressly qualified in its entirety by this notice.
Neither the ASX Exchange, the TSX Venture Exchange nor its Regulation Service Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Appendix 1
Table 1:Drill Hole Collar Table
UTM | UTM | ||||||
Hole ID | Target | Easting (NAD83 | Northing (NAD83 | Elevation (m) | Length (m) | Azimuth | Dip |
Z10) | Z10) | ||||||
EZ-21-01 | SW Vein | 531203 | 5653771 | 2400 | 105 | 121 | -52 |
EZ-21-02 | SW Vein | 531203 | 5653771 | 2400 | 132 | 146 | -55 |
EZ-21-03 | SW Vein | 531203 | 5653771 | 2400 | 111 | 158 | -47 |
EZ-21-04 | SW Vein | 531203 | 5653771 | 2400 | 135 | 168 | -58 |
EZ-21-05 | SW Vein | 531078 | 5653776 | 2400 | 561 | 123 | -48 |
EZ-21-06 | SW Vein | 531078 | 5653776 | 2400 | 255 | 110 | -55 |
EZ-21-07 | SW Vein | 531203 | 5653771 | 2400 | 126 | 115 | -75 |
EZ-21-07b | SW Vein | 531203 | 5653771 | 2400 | 186 | 115 | -75 |
EZ-21-08 | SW Vein | 531195 | 5653839 | 2427 | 231 | 115 | -68 |
EZ-21-09 | SW Vein | 531200 | 5654020 | 2330 | 360 | 120 | -48 |
EZ-21-10 | SW Vein | 530953 | 5653772 | 2390 | 354 | 127 | -50 |
EZ-21-11 | SW Vein | 530953 | 5653772 | 2390 | 381 | 136 | -50 |
EZ-21-12 | SW Vein | 530953 | 5653772 | 2390 | 375 | 125 | -45 |
EZ-21-13 | SW Vein | 530919 | 5653596 | 2300 | 261 | 94 | -45 |
EZ-21-14 | SW Vein | 530919 | 5653596 | 2300 | 261 | 108 | -55 |
EZ-21-15 | SW Vein | 530919 | 5653596 | 2300 | 330 | 100 | -55 |
EZ-21-16 | SW Vein | 530919 | 5653596 | 2300 | 330 | 83 | -48.5 |
EZ-21-17 | SW Vein | 530919 | 5653596 | 2300 | 414 | 98 | -63 |
EZ-21-18 | SW Vein | 530919 | 5653596 | 2300 | 351 | 128.5 | -63 |
EZ-21-19 | SW Vein | 530953 | 5653772 | 2390 | 417 | 129 | -58 |
EZ-21-20 | SW Vein | 530849 | 5653432 | 2260 | 300 | 129 | -45 |
EZ-21-21 | East Veins | 531695 | 5653463 | 2120 | 357 | 90 | -45 |
EZ-21-22 | SW Vein | 531195 | 5653839 | 2427 | 188 | 75 | -45 |
EZ-21-23 | SW Vein | 531695 | 5653463 | 2120 | 165 | 91 | -45 |
EZ-21-24 | Blue Vein | 530953 | 5653772 | 2390 | 219 | 84 | -54 |
EZ-21-25 | Blue Vein | 530953 | 5653772 | 2390 | 201 | 105 | -58 |
EZ-21-26 | Blue Vein | 530953 | 5653772 | 2390 | 198 | 95 | -45 |
EZ-21-27 | Blue Vein | 530953 | 5653772 | 2390 | 195 | 150 | -60 |
EZ-21-28 | No.9 Vein | 530953 | 5653772 | 2390 | 321 | 300 | -55 |
Table 1: Drill Hole Collar Table
UTM | UTM | ||||||
Hole ID | Target | Easting (NAD83 | Northing (NAD83 | Elevation (m) | Length (m) | Azimuth (o) | Dip (o) |
Z10) | Z10) | ||||||
EZ-22-01 | Blue Vein | 530953 | 5653772 | 2400 | 222 | 130 | -65 |
EZ-22-02 | Blue Vein | 531203 | 5653772 | 2400 | 225 | 108 | -65 |
EZ-22-03 | Blue Vein | 531203 | 5653772 | 2400 | 198 | 95 | -50 |
EZ-22-04 | Blue Vein | 531200 | 5653774 | 2393 | 375 | 290 | -55 |
EZ-22-05 | Blue Vein | 531130 | 5653775 | 2399 | 156 | 280 | -45 |
EZ-22-06 | Blue Vein | 531130 | 5653775 | 2399 | 237 | 290 | -55 |
EZ-22-07 | Blue Vein | 531130 | 5653775 | 2399 | 216 | 298 | -45 |
EZ-22-08 | Blue Vein | 531039 | 5653887 | 2422 | 201 | 135 | -50 |
EZ-22-09 | Blue and SW Vein | 530953.1 | 5653772 | 2392 | 468 | 100 | -53 |
EZ-22-10 | Blue Vein | 530953.1 | 5653772 | 2392 | 210 | 95 | -65 |
EZ-22-11 | Blue Vein | 531039 | 5653887 | 2422 | 207 | 110 | -60 |
EZ-22-12 | Blue Vein | 531039 | 5653887 | 2422 | 216 | 85 | -50 |
EZ-22-13 | Blue Vein | 531039 | 5653887 | 2422 | 251 | 123 | -65 |
EZ-22-14 | Blue Vein | 531004 | 5653896 | 2428 | 249 | 140 | -65 |
EZ-22-15 | Blue Vein | 531004 | 5653896 | 2428 | 156 | 130 | -65 |
EZ-22-16 | Blue Vein | 531004 | 5653896 | 2428 | 242 | 120 | -65 |
EZ-22-17 | Blue Vein | 531004 | 5653896 | 2428 | 251 | 160 | -65 |
EZ-22-18 | Blue Vein | 531004 | 5653896 | 2428 | 258 | 150 | -65 |
EZ-22-19 | No.9 Vein | 531041 | 5653893 | 2422 | 201 | 284 | -63 |
EZ-22-20 | No.9 Vein | 531041 | 5653893 | 2422 | 270 | 284 | -67 |
EZ-22-21 | No.9 Vein | 531041 | 5653893 | 2422 | 216 | 294 | -63 |
EZ-22-22 | No.9 Vein | 531041 | 5653893 | 2422 | 183 | 274 | -63 |
EZ-22-23 | No.9 Vein | 531041 | 5653893 | 2422 | 201 | 264 | -63 |
EZ-22-24 | Main & West Vein | 531347 | 5653777 | 2378 | 405 | 100 | -45 |
EZ-22-25 | No.9 Vein | 531039 | 5653888 | 2422 | 181 | 254 | -63 |
EZ-22-26 | No.9 Vein | 531039 | 5653888 | 2422 | 201 | 244 | -63 |
EZ-22-27 | No.9 Vein | 531038 | 5653891 | 2422 | 201 | 308 | -63 |
EZ-22-28 | No.9 Vein | 531038 | 5653891 | 2422 | 234 | 318 | -63 |
EZ-22-29 | SW Vein | 531136 | 5653860 | 2422 | 246 | 111 | -48 |
EZ-22-30 | SW Vein | 531136 | 5653860 | 2422 | 83 | 111 | -55 |
Table 2: Significant Interval Table
Hole ID | From (m) | To (m) | Interval (m) | True Thickness (m) | Gold Grade | MET Screen Grade | Vein |
EZ-21-01 | 94.00 | 96.60 | 2.60 | 2.21 | 4.60 | 5.12 | SW Vein |
and | 83.50 | 84.00 | 0.50 | 0.43 | 20.50 | pending | SW Vein |
EZ-21-02 | 102.40 | 109.00 | 6.60 | 5.61 | 8.40 | pending | SW Vein |
including | 105.40 | 106.50 | 1.10 | 0.93 | 46.30 | pending | SW Vein |
EZ-21-03 | 88.60 | 95.00 | 6.40 | 5.44 | 7.22 | pending | SW Vein |
including | 89.30 | 91.90 | 2.60 | 2.21 | 11.80 | pending | SW Vein |
and | 90.00 | 91.30 | 1.30 | 1.11 | 19.80 | pending | SW Vein |
and | 34.70 | 35.20 | 0.50 | 0.43 | 3.15 | pending | SW Vein |
EZ-21-04 | 122.00 | 126.00 | 4.00 | 3.40 | 31.20 | 34.40 | SW Vein |
including | 123.00 | 124.50 | 1.50 | 1.28 | 52.10 | 68.30 | SW Vein |
including | 124.00 | 124.50 | 0.50 | 0.43 | 72.00 | 87.30 | SW Vein |
EZ-21-05 | 134.00 | 135.00 | 1.00 | 0.85 | 1.38 | Not Preformed | 7 Vein |
217.55 | 218.25 | 0.70 | 0.59 | 1.74 | 1.67 | SW Vein | |
and | 256.00 | 256.50 | 0.50 | 0.43 | 1.03 | 0.89 | SW Vein |
and | 554.85 | 555.35 | 0.50 | 0.43 | 0.24 | Not Preformed | West Vein |
EZ-21-06 | 134.50 | 136.00 | 1.50 | 1.28 | 1.10 | 1.71 | 7 Vein |
and | 245.00 | 246.00 | 1.00 | 0.85 | 2.05 | 2.45 | SW Vein |
EZ-21-07 | Hole lost | ||||||
EZ-21-07B | 40.10 | 41.10 | 1.00 | 0.85 | 4.88 | Not Preformed | 7 Vein |
and | 51.50 | 52.20 | 0.70 | 0.60 | 9.06 | Not Preformed | 7 Vein |
and | 160.00 | 165.75 | 5.75 | 4.89 | 0.53 | 0.70 | SW Vein |
EZ-21-08 | 196.25 | 202.40 | 6.15 | 5.23 | 0.65 | 0.66 | SW Vein |
and | 226.60 | 227.10 | 0.50 | 0.43 | 1.54 | 1.85 | SW Vein |
EZ-21-09 | 58.60 | 59.10 | 0.50 | 0.43 | 0.31 | Not Preformed | Blue Vein |
and | 270.90 | 272.90 | 2.00 | 1.70 | 2.56 | Not Preformed | SW Vein |
and | 355.88 | 357.00 | 1.12 | 0.95 | 0.85 | Not Preformed | SW Vein |
EZ-21-10 | 223.00 | 223.50 | 0.50 | 0.43 | 4.04 | Not Preformed | 7 Vein |
and | 347.70 | 349.20 | 1.50 | 1.28 | 0.22 | 0.21 | SW Vein |
EZ-21-11 | 326.90 | 327.40 | 0.50 | 0.43 | 0.55 | 0.44 | SW Vein |
EZ-21-12 | 117.80 | 118.80 | 1.00 | 0.85 | 47.6 | 33.7 | Blue Vein |
and | 130.70 | 131.20 | 0.50 | 0.43 | 26.4 | Not Preformed | Blue Vein |
and | 163.90 | 164.40 | 0.50 | 0.43 | 5.50 | 8.41 | Blue Vein |
and | 344.90 | 347.00 | 2.10 | 1.79 | 0.78 | 1.22 | SW Vein |
EZ-21-13 | 230.70 | 232.60 | 1.90 | 1.62 | 0.76 | 0.71 | SW Vein |
EZ-21-14 | 224.00 | 224.90 | 0.90 | 0.77 | 1.63 | 1.15 | SW Vein |
Hole ID | From (m) | To (m) | Interval (m) | True Thickness (m) | Gold Grade | MET Screen Grade | Vein |
EZ-21-15 | 318.40 | 320.80 | 2.40 | 2.04 | 0.31 | Not Preformed | SW Vein |
including | 320.30 | 320.80 | 0.50 | 0.43 | 1.14 | Not Preformed | SW Vein |
EZ-21-16 | 305.00 | 306.90 | 1.90 | 1.61 | 0.55 | Not Preformed | SW Vein |
EZ-21-17 | 171.00 | 171.50 | 0.50 | 0.43 | 0.14 | 0.57 | SW Vein |
and | 204.00 | 204.60 | 0.60 | 0.51 | 0.53 | Not Preformed | SW Vein |
and | 254.60 | 256.85 | 2.25 | 1.91 | 1.40 | 1.58 | 7 Vein |
and | 350.13 | 350.75 | 0.62 | 0.53 | 1.01 | Not Preformed | SW Vein |
and | 379.47 | 382.00 | 2.53 | 2.15 | 0.63 | 0.64 | SW Vein |
EZ-21-18 | 299.50 | 299.90 | 0.40 | 0.34 | 1.53 | Not Preformed | SW Vein |
EZ-21-19 | 127.50 | 128.00 | 0.50 | 0.43 | 4.52 | Not Preformed | Blue Vein |
and | 129.00 | 130.50 | 1.50 | 1.28 | 4.25 | Not Preformed | Blue Vein |
and | 167.80 | 168.70 | 0.90 | 0.76 | 4.50 | 6.14 | Blue Vein |
and | 351.80 | 354.90 | 3.10 | 2.63 | 0.34 | Not Preformed | SW Vein |
EZ-21-20 | NSI** | ||||||
EZ-21-21 | 184.00 | 186.00 | 2.00 | 1.70 | 1.03 | Not Preformed | unknown |
and | 263.45 | 264.30 | 0.85 | 0.72 | 1.34 | Not Preformed | unknown |
EZ-21-22 | 175.55 | 176.70 | 1.15 | 0.98 | 1.60 | 2.50 | SW Vein |
EZ-21-23 | 145.00 | 149.10 | 4.10 | 3.48 | 1.11 | 1.83 | SW Vein |
including | 147.50 | 148.20 | 0.70 | 0.59 | 1.08 | 4.98 | SW Vein |
EZ-21-24 | 139.80 | 141.00 | 1.20 | 1.02 | 0.58 | 0.58 | Blue Vein |
and | 181.70 | 182.65 | 0.95 | 0.81 | 0.85 | 0.84 | Blue Vein |
EZ-21-25 | 111.00 | 113.70 | 2.70 | 2.30 | 13.4 | Not Preformed | Blue Vein |
including | 111.50 | 112.00 | 0.50 | 0.43 | 71.3 | Not Preformed | Blue Vein |
EZ-21-26 | 121.45 | 122.70 | 1.25 | 1.06 | 9.13 | Not Preformed | Blue Vein |
including | 121.45 | 121.70 | 0.25 | 0.21 | 45.1 | Not Preformed | Blue Vein |
and | 159.06 | 160.25 | 1.19 | 1.01 | 1.35 | 1.45 | Blue Vein |
EZ-21-27 | 152.20 | 153.60 | 1.40 | 1.19 | 12.1 | 14.31 | Blue Vein |
including | 152.20 | 153.20 | 1.00 | 0.85 | 16.3 | 19.19 | Blue Vein |
and | 157.00 | 157.40 | 0.40 | 0.34 | 1.27 | 1.28 | Blue Vein |
EZ-21-28 | 245.60 | 246.85 | 1.25 | 1.06 | 0.67 | Not Preformed | No.9 Vein |
Hole ID | From (m) | To (m) | Interval (m) | True Thickness (m) | Gold Grade | MET Screen Grade | Vein |
EZ-22-01 | 123.90 | 124.70 | 0.80 | 0.68 | 2.07 | 2.07 | Blue Vein |
and | 125.90 | 126.00 | 0.10 | 0.08 | 3.82 | 3.82 | Blue Vein |
and | 161.42 | 161.82 | 0.40 | 0.34 | 2.25 | 2.25 | Blue Vein |
EZ-22-02 | 147.65 | 147.83 | 0.18 | 0.15 | 6.88 | 6.88 | Blue Vein |
and | 185.25 | 185.85 | 0.60 | 0.51 | 1.89 | 1.89 | Blue Vein |
EZ-22-03 | 96.91 | 97.33 | 0.42 | 0.36 | 2.05 | 523.00 | Blue Vein |
and | 124.02 | 124.47 | 0.45 | 0.38 | 32.66 | Not Preformed | Blue Vein |
including | 124.02 | 124.13 | 0.11 | 0.09 | 130.00 | 133.00 | Blue Vein |
and | 164.41 | 166.14 | 1.73 | 1.47 | 7.41 | Not Preformed | Blue Vein |
including | 165.41 | 166.14 | 0.73 | 0.62 | 17.40 | Not Preformed | Blue Vein |
EZ-22-04 | 353.8 | 354 | 0.2 | 0.17 | 1.25 | Not Preformed | Blue Vein |
EZ-22-05 | 44.5 | 45.2 | 0.7 | 0.595 | 11.20 | Not Preformed | Blue Vein |
and | 56.8 | 57 | 0.2 | 0.17 | 1.38 | Not Preformed | Blue Vein |
and | 84.65 | 85.55 | 0.9 | 0.765 | 1.33 | Not Preformed | Blue Vein |
and | 98 | 99 | 1 | 0.85 | 2.62 | Not Preformed | Blue Vein |
EZ-22-06 | 40.2 | 40.9 | 0.7 | 0.595 | 1.91 | Not Preformed | Blue Vein |
and | 47.8 | 48.15 | 0.35 | 0.2975 | 1.17 | Not Preformed | Blue Vein |
and | 153.35 | 155 | 1.65 | 1.4025 | 1.71 | Not Preformed | Blue Vein |
Including | 154.15 | 155 | 0.85 | 0.7225 | 2.79 | Not Preformed | Blue Vein |
EZ-22-07 | 164.6 | 164.92 | 0.32 | 0.272 | 1.45 | Not Preformed | Blue Vein |
and | 165.66 | 165.79 | 0.13 | 0.1105 | 7.30 | Not Preformed | Blue Vein |
and | 170.17 | 170.4 | 0.23 | 0.1955 | 48.60 | Not Preformed | Blue Vein |
EZ-22-08 | 120.6 | 121 | 0.4 | 0.34 | 0.494 | Not Preformed | Blue Vein |
EZ-22-09 | 105.12 | 106.17 | 1.05 | 0.89 | 322.54 | 310.72 | Blue Vein |
including | 105.12 | 105.32 | 0.20 | 0.17 | 1,654 | 1,572 | Blue Vein |
105.32 | 106.17 | 0.85 | 0.72 | 9.25 | 13.95 | Blue Vein | |
and | 161.13 | 162.00 | 0.87 | 0.74 | 2.68 | Not Preformed | Blue Vein |
and | 356.19 | 358.38 | 2.19 | 1.86 | 0.41 | Not Preformed | SW Vein |
Including | 356.19 | 356.70 | 0.51 | 0.43 | 1.05 | Not Preformed | SW Vein |
EZ-22-10 | 193.1 | 194.75 | 1.65 | 1.40 | 0.61 | Not Preformed | Blue Vein |
Including | 193.98 | 194.23 | 0.25 | 0.21 | 0.997 | Not Preformed | Blue Vein |
EZ-22-11 | 102.45 | 193.42 | 91.37 | 77.67 | 0.31 | Not Preformed | Blue Vein |
including | 102.45 | 104.75 | 2.30 | 1.96 | 11.75 | Not Preformed | Blue Vein |
including | 103.15 | 103.45 | 0.30 | 0.26 | 85.20 | Not Preformed | Blue Vein |
Hole ID | From (m) | To (m) | Interval (m) | True Thickness (m) | Gold Grade | MET Screen Grade | Vein |
EZ-22-12 | 137.65 | 139.33 | 1.68 | 1.43 | 1.26 | Not Preformed | Blue Vein |
including | 138.80 | 139.33 | 0.53 | 0.45 | 2.08 | Not Preformed | Blue Vein |
EZ-22-13 | 108.52 | 108.77 | 0.25 | 0.21 | 1.62 | Not Preformed | Blue Vein |
and | 111.00 | 111.27 | 0.27 | 0.23 | 1.03 | Not Preformed | Blue Vein |
and | 112.34 | 112.45 | 0.11 | 0.09 | 15.30 | Not Preformed | Blue Vein |
and | 196.42 | 196.60 | 0.18 | 0.15 | 1.49 | Not Preformed | Blue Vein |
and | 215.83 | 216.00 | 0.17 | 0.14 | 1.95 | Not Preformed | Blue Vein |
*true thickness is estimated using a multiplier of 0.85. The Company considers anything over 0.2 g/t gold as significant. **no significant intervals
Appendix 2: The following tables are provided to ensure compliance with the JORC Code (2012) requirements for the reporting of Exploration Results for the Elizabeth - Blackdome Gold Project
Section 1: Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria | JORC Code explanation | Commentary | ||
Sampling techniques |
|
| ||
Drilling techniques |
|
| ||
Drill sample recovery |
|
| ||
Criteria | JORC Code explanation | Commentary | ||
Logging |
|
| ||
Sub- sampling techniques and sample preparation |
|
| ||
Quality of assay data and laboratory tests |
|
| ||
Verification of sampling and assaying |
|
| ||
Criteria | JORC Code explanation | Commentary | |
Location of datapoints |
|
| |
Data spacing and distribution |
|
| |
Orientation of data in relation to geological structure |
|
| |
Sample s Security |
|
| |
Audits or Reviews |
|
| |
Section 2: Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria | JORC Code explanation | Commentary | |
Mineral tenement and land tenure status |
|
| |
Exploration done by other parties |
|
| |
Criteria | JORC Code explanation | Commentary |
Mining operations lasted six months and ended in May of 1999. During this period, 6,547 oz of Au and 17,300 oz of Ag were produced from 21,268 tons of ore. Further exploration programs were continued by Claims taker over the following years and a Japanese joint venture partner was brought onboard that prompted a name change to J-Pacific Gold Inc. This partnership was terminated by 2010, resulting in another name change to Sona Resources Corp.
| ||
Geology |
|
|
Criteria | JORC Code explanation | Commentary |
Geochemical studies (Vivian,1988) have shown these rocks to be derived from a "calc-alkaline" magma in a volcanic arc type tectonic setting. Eocene age granitic intrusions at Poison Mountain some 22 kilometres southwest of Blackdome are host to a gold bearing porphyry copper/molybdenum deposit. It is speculated that this or related intrusions could reflect the source magmas of the volcanic rocks seen at Blackdome. There is some documented evidence of young granitic rocks several kilometres south of the mine near Lone Cabin Creek. The youngest rocks present are Oligocene to Miocene basalts of the Chilcotin Group. These are exposed on the uppermost slopes of Blackdome Mountain and Red Mountain to the south.
|
Criteria | JORC Code explanation | Commentary |
Drill hole Information |
|
|
Data aggregation methods |
|
|
Relationship between mineralisation widths and intercept lengths |
|
|
Diagrams |
|
|
Criteria | JORC Code explanation | Commentary |
Balanced reporting |
|
|
Other substantive exploration data |
|
|
Further work |
|
|
SOURCE: Tempus Resources Ltd.
View source version on accesswire.com:
https://www.accesswire.com/717335/Tempus-Drills-More-Visible-Gold-at-No9-Vein--Elizabeth-Project