• Montag, 23 Dezember 2024
  • 04:21 Uhr Frankfurt
  • 03:21 Uhr London
  • 22:21 Uhr New York
  • 22:21 Uhr Toronto
  • 19:21 Uhr Vancouver
  • 14:21 Uhr Sydney

Graycliff Exploration Reports Further High-Grade Gold Assay Results in Phase 4 Drilling at Shakespeare Project, Ontario

11.10.2022  |  Newsfile

Expands the Width and Breadth of the Mineralized Zone

Toronto, October 11, 2022 - Graycliff Exploration Ltd. (CSE: GRAY) (OTCQB: GRYCF) (FSE: GE0) (the "Company" or "Graycliff") is pleased to release the next batch of assay results from the Phase Four drilling program at the Shakespeare Gold Project located on the Canadian Shield near Sudbury, Ontario. Phase Four drilling focused on testing the boundaries of the mineralized zone, both along strike and at depth.

Drill Hole J-52 intersected 14.39 grams per tonne of gold ("g/t Au") over 3.0 metres ("m"), including 41.00 g/t Au over 1.0 m. Additionally, J-53 intersected 5.35 g/t Au over 5.0 m, including 21.40 g/t Au over 1.0 m. Significant intervals for Holes J-52 to J-53 are detailed below.

Table 1 - Highlighted Gold Assay Results from Holes J-52 to J-53

Drill Hole From (m) To (m) Width (m)1 Au (g/t) 2
J-52 175.0 178.0 3.00 14.39
including
176.0 177.0 1.00 41.00
J-53 173.0 174.0 1.00 1.31
180.0 185.0 5.00 5.35
including
180.0 181.0 1.00 21.40
196.0 197.0 1.00 1.58

1 Reported intervals are down-hole lengths and not true thicknesses. True width of the mineralization cannot be determined due to the early-stage nature of the current program.
2 Length-weighted average grades are calculated using un-capped gold assay data.

James Macintosh, Graycliff's President and CEO, stated: "Drill Hole J-52 was drilled to the northeast and expanded the width and breadth of the mineralization zone. Hole J-53 intersected three anomalous intervals at depth of over 150 m from surface within a 25 m section of the hole. Given the intersection of high grades over the strike as well as depth drilled to date, we feel it's time for us to initiate preliminary metallurgical sample test work. Our team will complete one or several drill holes of large diameter to collect material for the anticipated work. This should become an important step in moving the Shakespeare Project forward."


Figure 1 - Holes J-52 to J-53 Location and Cross Section

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8952/139890_40e3dadf4441da57_001full.jpg

Qualified Person

Bruce Durham, P.Geo., is a Qualified Person, as that term is defined by Canadian regulatory guidelines under NI 43-101, and has read and approved the technical information contained in this press release.

About Graycliff Exploration Limited

Graycliff Exploration is a mineral exploration company focused on its 1,025 hectares of prospective ground, located roughly 80 kilometres west of Sudbury on the prolific Canadian Shield. The Company's Shakespeare Project consists of one crown patented lease, two crown leases and 40 claims on a property associated with the historic Shakespeare Gold Mine, which operated from 1903 to 1907. Graycliff's Baldwin Project is adjacent to the east and is comprised of 68 claims covering 1,500 hectares.

QA/QC Protocol: https://graycliffexploration.com/wp-content/uploads/2021/06/graycliffexploration-qa-qc-protocols-june-2021.pdf

For more information, please contact investor relations at 1-647-249-9298, or email investors@graycliffexploration.com.

On Behalf of the Board of Directors,
James Macintosh
President and CEO

Neither the Canadian Securities Exchange nor its regulation services provider has reviewed or accepted responsibility for the adequacy or accuracy of this press release.

This press release may include forward-looking information within the meaning of Canadian securities legislation, concerning the business of the Company. Forward-looking information is based on certain key expectations and assumptions made by the management of the Company. Although the Company believes that the expectations and assumptions on which such forward-looking information is based on are reasonable, undue reliance should not be placed on the forward-looking information because the Company can give no assurance that they will prove to be correct. Forward-looking statements contained in this press release are made as of the date of this press release. The Company disclaims any intent or obligation to update publicly any forward-looking information, whether as a result of new information, future events or results or otherwise, other than as required by applicable securities laws.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/139890


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Graycliff Exploration Ltd.
Bergbau
A3EWZU
CA38940L2057
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.