• Freitag, 22 November 2024
  • 00:28 Uhr Frankfurt
  • 23:28 Uhr London
  • 18:28 Uhr New York
  • 18:28 Uhr Toronto
  • 15:28 Uhr Vancouver
  • 10:28 Uhr Sydney

Majuba Hill Copper 2022 Soil Sample Results Increase Target Size

11.10.2022  |  Newsfile

Vancouver, October 11, 2022 - Majuba Hill Copper Corp. (CSE: JUBA) (OTC Pink: JUBAF) (FSE: 4NP) ("Majuba Hill Copper" or the "Company") is pleased to report that the results from the additional soil samples collected in 2022 have significantly increased the size of the DeSoto and Copper Gold Target at the Majuba Hill Porphyry Copper Project in Pershing County Nevada. The results also highlight the surface footprint for the 789 Target.

A total of 1050 samples were collected to extend the previous sampling grid to the north, east, and west.



Figure 1

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/6332/139875_94861462a404f8c5_001full.jpg

The Copper Gold Target was extended eastward by almost 3,000 feet (914 m) and is still open to the east. The DeSoto Target was extended westward by over 3200 feet (975 m) and overlaps with the Section 4 target zone. Anomalous copper, gold, molybdenum, zinc, and arsenic values were identified at the 789 Target and are open to the north and west.



Gold in Soils-Extend Copper Gold Target to the east

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/6332/139875_94861462a404f8c5_002full.jpg



Copper in Soils-Extend DeSoto Target to the west

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/6332/139875_94861462a404f8c5_003full.jpg



Zinc and Moly in Soils-Open to north and west

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/6332/139875_figure.jpg

Buster Hunsaker, Consulting Geologist to Majuba Hill Copper and a member of the Advisory Board commented:

"Copper, gold, silver, molybdenum, lead, and zinc have good zoning on the Majuba Hill Project. The soil values indicate the very large size of the copper porphyry mineralizing porphyry system. Combining the 3,000 to 9,000 foot (915-2743 m) wide anomalous zones and thick copper, silver, gold, moly, and zinc drill intercepts point to a mineral system that is typical of districts that host economic deposits. Future drilling will use these results to direct us into the highest grade parts of the target areas."

David Greenway, President, and CEO commented: "I am pleased to see the ongoing staged exploration results contribute to our drilling at Majuba Hill. I am very anxious to see the results from our recently completed deep core program applied to these results."

Soil Highlights

Soil sampling indicates multiple metal correlations for each target zone at Majuba Hill. The Copper Gold, DeSoto, and "789" target zones have distinct metal associations suggesting several different mineralizing intrusive centers.

Target Area Cu Au Ag Mo Zn Pb As
Copper Gold Moderate V.Strong Strong Strong Weak Weak V.Strong
DeSoto V.Strong Weak V.Strong Moderate V.Strong Strong Strong
"789" Weak Weak Moderate Strong Strong Strong Moderate

Quality Assurance/Quality Control ("QA/QC") Measures, Chain of Custody

The Company has implemented a QA/QC program using best industry practices at the Majuba Hill Project. The samples are transported from the JUBA secure warehouse or directly from the drill to the ALS Sample Prep Facility in Reno or Elko, Nevada. ALS then transports the prepared pulps to their analytical lab in Reno, Nevada or Vancouver, B.C. Soil and rock chip samples are transported by the company directly to Elko or Reno, Nevada.

Drill core samples are sawn in half lengthwise and one half is placed in labeled cloth sample bags. All samples are analyzed for copper, gold, silver, and 33 other elements. Gold is determined by ALS method Au-AA23 which is a fire assay with an AAS finish on a 30 gram split. Copper, silver and the remaining 31 elements are determined by ALS method ME-ICP61 which is a four acid digestion and ICP-AES assay. Approximately 5% of the submitted samples are duplicates and copper-gold-porphyry commercial standard reference material pulps. The sample rejects and remaining pulps will be retrieved from ALS.

Qualified Person

The scientific and technical information contained in this news release has been reviewed by E.L. "Buster" Hunsaker III, CPG 8137, a non-independent consulting geologist who is a "Qualified Person" as such term is defined under National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43- 101").

About Majuba Hill Copper Corp.

Majuba Hill Copper Corp. is engaged in the identification, review and acquisition of latter stage copper and copper/silver/gold assets. This is in direct response to the growing worldwide demand and lack of supply for precious metals fueled by the Green New Deal in the US and most other developed nations with similar programs aimed at addressing climate change. Such programs are heavily reliant on silver, gold and especially copper to produce Electric Vehicles and other renewable power sources, as well as building infrastructure to provide clean and affordable electricity.

The flagship project is the Majuba Hill copper, silver and gold District located 156 miles outside Reno, Nevada, USA. Management has been mandated to focus on safe, mining friendly jurisdictions where government regulations are supportive of mining operations.

On Behalf of the Board of Majuba Hill Copper Corp.

"David Greenway"

David C. Greenway
President & CEO

For further information, please contact:
Joel Warawa
VP of Corporate Communications
E: jw@majubahillcopper.com
P: 1 (855) 475-0745

Neither the Canadian Securities Exchange nor its Market Regulator (as that term is defined in the policies of the Canadian Securities Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward-Looking Statements

This news release contains certain statements that may be deemed "forward-looking" statements. Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects", "plans", "anticipates", "believes", "intends", "estimates", "projects", "potential" and similar expressions, or that events or conditions "will", "would", "may", "could" or "should" occur. Although Majuba Hill Copper Corp. believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results may differ materially from those in forward looking statements. Forward-looking statements are based on the beliefs, estimates and opinions of Majuba Hill Copper Corp. management on the date the statements are made. Except as required by law, Majuba Hill Copper Corp. undertakes no obligation to update these forward-looking statements in the event that management's beliefs, estimates or opinions, or other factors, should change.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/139875


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Giant Mining Corp.
Bergbau
A409DM
CA37452L1085
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.