• Sonntag, 22 Dezember 2024
  • 13:41 Uhr Frankfurt
  • 12:41 Uhr London
  • 07:41 Uhr New York
  • 07:41 Uhr Toronto
  • 04:41 Uhr Vancouver
  • 23:41 Uhr Sydney

Bauxite Resources: Receives EPA Level Of Assessment For Proposed 2Mtpa Mining Operation At North Bindoon Project

13.09.2010  |  ABN Newswire
10:32 AEST Sept 13, 2010 ABN Newswire (C) 2004-2010 Asia Business News PL. All Rights Reserved.

Perth, Australia (ABN Newswire) - Australian resources company Bauxite Resources Limited (ASX:BAU) (PINK: BXRDF) ('BRL' or 'the Company') has received notice from the EPA advising that its proposed 2Mtpa mining operation on privately owned farmland north of Bindoon, Western Australia, will require assessment via a Public Environmental Review.

As advised previously BRL, in referring to the EPA for assessment its proposed mining operation, confirmed that it was committed to a public scoping exercise to ensure that the community and relevant agencies are engaged in the process (refer ASX announcement dated 18 August 2010).

Bauxite Resources Limited Chairman and acting CEO, Mr Barry Carbon, said, 'the EPA's determination of the level of assessment is in line with our expectations and gives the Company great certainty in the development of our long-term mining plans'.

'As part of the referral BRL recommended to the EPA that environmental assessment be through a public process, including public discussion of the scope of the assessment, and we now look forward to working closely with the local community to ensure we develop our project in consultation with the community,' he added.

The bauxitic ore to be extracted under this proposal will either be sold for export as direct shipping ore or sold locally as other products (gravel). Following crushing and screening, export-quality ore will be trucked along state highways and major transport routes to the Kwinana port for export. Non export-quality material (gravel) will be available to local and regional commercial operations.

BRL earlier this year completed its trial shipments from Stephens Road, North Bindoon, consisting of 128,000 tonnes, and the trial area has now been rehabilitated and reseeded with pasture species as per the landholder's requirements.

A number of public tours consisting of local landowners and other interested parties were conducted by the Company in August 2010 to demonstrate the minimum impact nature of its bauxite mining operations on farmland. The Company shared its vision for development with the local Bindoon community at a public meeting 'Conversations with the Community' on 20 July 2010.


About Bauxite Resources Limited:

Bauxite Resources Limited (ASX:BAU) was launched in May 2006 to establish itself in the bauxite and alumina industries in Western Australia where four of the seven Australian alumina refineries and four of Australia's bauxite mines are located. It listed successfully on the ASX on 22 October 2007 after closing its A$7.5 million IPO early and oversubscribed, having previously raised approximately $1.3 million in seed capital. In February 2009 the Company raised a further $4.7 million on the uptake of its options issue.

The Company is the only ASX-listed bauxite explorer in the highly prospective Darling Range, and is the largest tenement holder in the Darling Range with approximately 15,000 square kilometres of prospective bauxite laterite ground. To put this into context this area is larger than East Timor and almost the size of Beijing Municipality.

The Darling Range is the largest bauxite mining and alumina producing region in the world. This area supplies approximately 18% of the world's alumina and is home to Alcoa's Huntly Mine, the largest producing bauxite mine in the world and Pinjara Refinery the second largest alumina refinery in the world. The Darling Range has three of the top five refineries in the world in terms of lowest operating costs.



Contact:

Ms Chantelle O'Sullivan, Public Affairs Manager
Bauxite Resources Limited
Tel: +61-8-9200-6309/ +61-0437-701-155
Email: chantelle.osullivan@bauxiteresources.com.au

Mr Paul Fromson, Chief Financial Officer and Company Secretary
Bauxite Resources Limited
Tel: +61-8-9200-6300
Email: pfromson@bauxiteresources.com.au
http://www.bauxiteresources.com.au
Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Australian Silica Quartz Group Ltd.
Bergbau
A2PV0S
AU0000066169
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.