Fire River Gold Announces Mineral Resource Estimate For the Nixon Fork Gold Mine, Alaska - Indicated Resources of:-- 121,690 tonnes grading 26.9 g/t (0.78 opt) in the mines plus-- 92,000 tonnes grading 7.9 g/t (0.23 opt) in the tailings for-- 3,995,0
- Indicated Resources of:
-- 121,690 tonnes grading 26.9 g/t (0.78 opt) in the mines plus
-- 92,000 tonnes grading 7.9 g/t (0.23 opt) in the tailings for
-- 3,995,000 grams (128,500 ounces) of contained gold
- Inferred Resources of:
-- 70,780 tonnes grading 27.8 g/t (0.81 opt) in the mines plus
-- 48,000 tonnes grading 7.4 g/t (0.21 opt) in the tailings for
-- 2,321,000 grams (74,600 ounces) of contained gold
- 94% of all resource ounces close to existing mine development
- On going 28,000 metre drill program to expand resources
VANCOUVER, BRITISH COLUMBIA -- (Marketwire) -- 10/06/10 -- Fire River Gold Corp. (TSX VENTURE: FAU)(OTCQX: FVGCF)(FRANKFURT: FWR) ('FAU' or the 'Company') is pleased to report the results of a Mineral Resource Estimation recently completed on the Nixon Fork Gold Project, located in Alaska's Tintina gold belt. The resource estimate was completed by Giroux Consultants Ltd. of Vancouver, Canada. The total Indicated Resources are 3,995,000 grams (128,500 ounces) of contained gold plus an Inferred Resource of 2,321,000 grams (74,600 ounces) of contained gold.
The resource estimate was compiled by Giroux Consultants Ltd. and is inclusive of all mining and drill information available prior to FAU taking over the project in August 2009. The resource is based on 1,233 diamond drill holes from both surface and underground sites and a total of 17,693 samples that were assayed for gold. Note that the resource estimate comprises both the lode mining (hard rock in-situ resources) and an estimate for the tailings pond, which was the basis of the recent September 2010 Preliminary Economic Assessment 'PEA', (see September 29, 2010 (http://www.firerivergold.com/s/NewsReleases.asp?ReportID=421082) news release).
Table 1: Resource Estimate for the Nixon Fork Mine Project, 10 g/t cut-off
grade (Giroux, 2010)
---------------------------------------------------------------------------
Indicated
-----------------------------------------------
Grade Contained Gold
-------------------------------------
Zone Tonnes g/t opt g oz
---------------------------------------------------------------------------
Lode Mining:
3000 15,500 37.3 1.09 577,840 18,578
3300 68,900 27.5 0.80 1,891,305 60,809
3500 1,200 11.7 0.34 14,052 452
Whalen 630 11.2 0.33 7,056 227
J5 7,500 16.7 0.49 125,025 4,020
3100 560 11.3 0.33 6,350 204
Mystery 27,400 23.7 0.69 649,380 20,878
Southern Cross
---------------------------------------------------------------------------
Subtotal - Lode 121,690 26.9 0.78 3,271,008 105,168
---------------------------------------------------------------------------
Existing Tailings(i) 92,000 7.9 0.23 724,040 23,287
---------------------------------------------------------------------------
Total 213,690 18.7 0.55 3,995,048 128,455
---------------------------------------------------------------------------
---------------------------------------------------------------------------
Inferred
-----------------------------------------------
Grade Contained Gold
-------------------------------------
Zone Tonnes g/t opt g oz
---------------------------------------------------------------------------
Lode Mining:
3000 37,600 29.7 0.87 1,116,344 35,892
3300 20,900 29.5 0.86 617,177 19,840
3500 0 0.0 0.00 0 0
Whalen 10 10.2 0.30 102 3
J5 660 13.6 0.40 8,963 288
3100 410 12.4 0.36 5,076 163
Mystery 100 18.9 0.55 1,885 61
Southern Cross 11,100 19.6 0.57 218,004 7,009
---------------------------------------------------------------------------
Subtotal - Lode 70,780 27.8 0.81 1,967,551 63,256
---------------------------------------------------------------------------
Existing Tailings(i) 48,000 7.4 0.21 353,760 11,377
---------------------------------------------------------------------------
Total 118,780 19.5 0.57 2,321,311 74,633
---------------------------------------------------------------------------
(i) Existing tailings estimated using a 5 g/t cut-off grade
It is important to note that 94% of all contained gold ounces are close to current mine development or (in the case of the tailings) on surface. This demonstrates two key facts: 1) the mine is poised to resume production, and 2) how under-explored the claim is at present, as 6% of the resource estimate is shared between four prospects.
The 3300 Zone is particularly important, as it is anticipated to be the first mining zone when production resumes. Approximately 40% of the hard rock resources are in this zone. A Preliminary Economic Assessment 'PEA' is planned for later this year that will evaluate the viability of resuming production mining operations. This work will be done by Snowden Mining Consultants of Vancouver.
At present, the Company is conducting a 28,000 metre diamond drill program for exploration and ore definition purposes. A contractor's drill is currently operating on surface and has completed 4 holes in the Whalen, 7 in the North Star and 5 in the Southern Cross. A Company owned drill is also operating underground and has completed 6 holes in the 3100 zone, 11 in the 3300 zone, and 3 in the 3500 and 3550 zones. The Company is currently awaiting assay results. A new resource estimate, updated from the 2010 drill results is anticipated in 2011 which will incorporate all results from the 2010 drill program.
FAU's President & CEO, Harry Barr, noted 'Management is pleased with this, our first mineral resource estimate. We look forward to the results of our upcoming assessment work and to expanding this resource further by our ongoing diamond drilling program.'
This resource estimate will be included in a new NI 43-101 report and posted to Sedar within 45 days of this News Release.
Objectives: 2010/11 Drill Program
As previously announced on July 27th, 2010, (http://www.firerivergold.com/s/NewsReleases.asp?ReportID=410665) and September 7th 2010, (http://www.firerivergold.com/s/NewsReleases.asp?ReportID=417469) a diamond drill program of up to 28,000 metres has commenced at its Nixon Fork Gold Mine. The surface program is testing to expand six known zones of mineralization which have the potential to provide additional resources to the mill. The underground portion of the drill program is focusing on expanding resources, particularly in the 3300 Zone, 3500, 3100, as well as other prospective zones.
The early performance of the drill crews has prompted the Company to seek out and purchase a second unit and expand the mining department to accommodate four shifts of drilling per day. At present, the mine has a staff of nine mine workers, which will be expanded to accommodate this program.
The Qualified Person for this news release is Richard Goodwin, P.Eng., Vice President of Mining for Fire River Gold Corp.
About Fire River Gold Corp.
Fire River Gold Corp. is a near term production company with an experienced technical team focused on bringing its flagship project, the Nixon Fork Gold Mine, back into production within the next 12 months. The Nixon Fork Gold Mine (http://www.firerivergold.com/s/NixonFork.asp) is a fully permitted and bonded mine with past production values averaging 39 g/t (1.12 opt). Facilities at the Nixon Fork Gold Mine include a 200 tpd flotation plant with a gravity gold separation circuit and a sulphide flotation circuit. In 2008, a CIL gold leaching circuit was purchased and partially installed. The mine also includes a fleet of mining vehicles, a self-contained power plant, maintenance facilities, drilling equipment, an 85 person camp, office facilities and a 1.5 km long landing strip. Fire River Gold Corp is a member of the International Metals Group (http://www.internationalmetalsgroup.com/).
On behalf of the Board of Directors, I look forward to keeping you updated with our corporate developments.
Harry Barr, President and C.E.O.
Certain information regarding the Company including management's assessment of future plans and operations, may constitute forward-looking statements under applicable securities laws and necessarily involve risks associated with mining exploration and development, volatility of prices, currency fluctuations, imprecision of resource estimates, environmental and permitting risks, access to labour and services, competition from other companies and ability to access sufficient capital. As a consequence, actual results may differ materially from those anticipated in the forward-looking statements. A feasibility study has not been completed and there is no certainty the disclosed targets will be reached nor that the proposed operations will be economically viable. We seek safe harbour.
Note: To view the maps and photos associated with this release, please click the following link: http://www.firerivergold.com/s/NewsReleases.asp?ReportID=422241
The TSX Venture Exchange or its Regulation Services Provider have not reviewed and do not accept responsibility for the adequacy or accuracy of the contents of this news release, which has been prepared by management.
Contacts:
Fire River Gold Corp.
Investor Relations
+1-604-685-1870 or Toll Free: 1-800-667-1870
1-604-685-8045 (FAX)
info@firerivergold.com