• Sonntag, 24 November 2024
  • 20:32 Uhr Frankfurt
  • 19:32 Uhr London
  • 14:32 Uhr New York
  • 14:32 Uhr Toronto
  • 11:32 Uhr Vancouver
  • 06:32 Uhr Sydney

Prime Releases High-Grade Drill Results from Two New Generative Targets at Los Reyes

06.09.2023  |  GlobeNewswire
  • New drilling encounters highest grades yet at Las Primas, returning 12.3 gpt AuEq1 (10.8 gpt gold and 114.9 gpt silver) over 2.5 metres near surface
  • Drilling at Fresnillo encounters multiple, thick gold-silver intervals
  • Follow-up drilling is planned for both targets

VANCOUVER, British Columbia, Sept. 06, 2023 -- Prime Mining Corp. ("Prime" or the "Company") (TSX-V: PRYM, OTCQX: PRMNF, Frankfurt: 04V3) is reporting drill results from its ongoing 60,000 metre ("m") drill program, of which about one half is focused on regional exploration at Los Reyes. Today's results are from the Las Primas and Fresnillo generative targets (see Figure 1) at the Company's Los Reyes Project (the "Project"), located in Sinaloa State, Mexico.

Newly discovered Las Primas mineralization outside of the previously reported 2023 Mineral Resource Estimate ("MRE") contains high-grades and significant thicknesses in areas located between the Central and Guadalupe Zones. The precious metals mineralization is in high-grade plunging shoots, similar to Guadalupe, Tahonitas and Nocha Buena areas, that contain a multiple gram per tonne ('gpt') gold equivalent ('AuEq') center with an outer, lower-grade halo. At Las Primas, mapping and 2023 drilling has confirmed continuity of at least two mineralized structural corridors that remain open in all directions.

Fresnillo is a highly prospective earlier stage target, where drilling intercepted thick mineralized structures, between the Z-T and Central Zones. Follow-up drilling is planned to continue. Surface mapping and modelling of these structures is ongoing.

Generative Target Highlights

Las Primas Area:

The Company is reporting 12 core holes at the Las Primas target. Las Primas is located in the southeast of the Project area between the Central and Guadalupe Zones. Highlights are listed below:

  • 12.34 gpt AuEq (10.85 gpt Au and 114.9 gpt Ag) over 2.5 metres (m) estimated true width ('etw') in hole 23LP-14, including:
    • 17.50 gpt AuEq (15.40 gpt Au and 162.2 gpt Ag) over 1.7 m etw.
  • 1.73 gpt AuEq (1.70 gpt Au and 2.3 gpt Ag) over 9.6 m etw in hole 23LP-06, including:
    • 4.94 gpt AuEq (4.88 gpt Au and 4.7 gpt Ag) over 3.0 m etw.
  • 1.20 gpt AuEq (0.87 gpt Au and 25.8 gpt Ag) over 14.6 m etw in hole 23LP-07, starting just below surface.

Fresnillo Area:

The Company is reporting 11 core holes at the Fresnillo target, located between the south ends of the Z-T and Central Zones. Highlights are listed below:

  • 0.74 gpt AuEq (0.56 gpt Au and 14.3 gpt Ag) over 23.8 m etw, and
  • 0.48 gpt AuEq (0.41 gpt Au and 5.3 gpt Ag) over 20.8 m in hole 23FRE-12.
  • 1.65 gpt AuEq (1.06 gpt Au and 45.2 gpt Ag) over 10.9 m etw in hole 23FRE-19, including:
    • 12.30 gpt AuEq (6.63 gpt Au and 438.0 gpt Ag) over 0.85 m etw.
  • 1.39 gpt AuEq (0.87 gpt Au and 40.4 gpt Ag) over 7.5 m etw in hole 23FRE-20.

Prime Mining Corp. Chief Executive Officer Daniel Kunz commented, "Today's results demonstrate the growing potential of our gold-silver exploration targets outside of the current mineral resource zones. New mineralized areas like these are expected to contribute to our goal of continued expansion of the Los Reyes gold-silver resource. As Las Primas and Fresnillo are proximal to existing resource zones, we anticipate incremental value-add from these nearby generative targets."

Scott Smith, Executive Vice President of Exploration added, "We are successfully executing a two-pronged approach to exploration: firstly, drilling resource expansions at Z-T, Central and Guadalupe Zones, the three areas that form our current mineral resource estimate, and secondly, exploring a growing number of new, generative targets. Mapping, surface sampling and modeling are ongoing to help guide generative drilling. We have many additional generative targets at Los Reyes identified that we have not yet had the opportunity to fully drill-test. A strong focus on exploration access improvements has facilitated this newly reported drilling and will allow more efficient drilling of many of these generative targets going forward."

Prime is targeting a material resource expansion at Los Reyes through a combination of new generative area discoveries and growth, such as those being reported today, in addition to on-going expansion along strike and down dip within previously reported mineral resource areas. These recent regional results are from the initial generative program which is expected to be followed-up as the Company continues to evaluate the full potential of Los Reyes.

Figure 1: Generative drilling update


INTERPRETATION OF RESULTS

The drilling described in this news release is the result of Prime's success-based generative exploration program. Currently drill-limited mineralized areas (500 m2 at Las Primas and 700 m2 at Fresnillo) are demonstrating potential to become standalone deposits. Prime is the first to drill at both Las Primas and Fresnillo.

Las Primas was first identified through historical records and the Company's earlier sampling and mapping work. Prime conducted initial drill-testing at Las Primas in 2021 using a portable rig due to limited road access. On August 4, 2021, Prime released the first three holes at Las Primas, that included hole 21LP-02 at 1.8 gpt AuEq over 3.8 m etw, located 24 m downhole. Today's results are the product of Prime's focused generative drill program (see Figure 2 and 3), which has identified what appears to be two or more major parallel vein sets.

The Las Primas area is located approximately 475 m east of the Noche Buena pit-constrained MRE in the Central Zone and 500 m southwest of the Guadalupe East pit-constrained MRE in the Guadalupe Zone. Similar to Guadalupe East, mineralization at Las Primas is primarily hosted in quartz veins and breccias near the intrusive contacts between feldspathic porphyry and rhyolitic/dacitic intrusives. Drilling has defined mineralization in multiple structures along a 300 m strike length and up to 240 m down-dip and is open in all directions (see Figures 4a-c). The potential to find structural intersections similar to those identified in Guadalupe East is high.

Fresnillo was first drilled as part of Prime's 2022 drill program. Prime published the first nine drill holes from Fresnillo on February 27, 2023, highlighting hole 22FRE-09 at 1.7 g/t AuEq over 15.8 m etw.

Fresnillo is located between the Z-T and Central Zones, with mineralization identified to date roughly 150 m from the Noche Buena pit-constrained MRE in the Central Zone and 500 m from the Z-T pit-constrained MRE to the west. Similar to the Z-T and Central Zones, mineralization at Fresnillo is in high-grade, south-plunging shoots surrounded by lower-grade mineralized halos. Mineralization has been identified in multiple southwest-dipping structures, which remain open both down-dip and along strike to the southeast (see Figures 5 and 6).

Drill Hole Highlights - Las Primas & Fresnillo Areas1

Hole ID From (m) To (m) Interval (m) ETW2 (m) Au (gpt) Ag (gpt) AuEq3 (gpt) Area
23LP-05 0.00 6.00 6.00 5.80 1.45 7.60 1.55 Las Primas
23LP-05 71.50 85.25 13.75 13.55 0.61 5.31 0.68 Las Primas
23LP-06 0.00 5.40 5.40 5.20 0.41 9.90 0.54 Las Primas
23LP-06 126.00 135.75 9.75 9.60 1.70 2.32 1.73 Las Primas
including 132.00 135.00 3.00 2.95 4.88 4.70 4.94 Las Primas
including 133.50 135.00 1.50 1.50 8.20 7.90 8.30 Las Primas
23LP-07 0.00 4.50 4.50 4.45 0.36 18.93 0.60 Las Primas
23LP-07 9.65 24.50 14.85 14.60 0.87 25.78 1.20 Las Primas
including 12.00 15.00 3.00 2.95 1.87 32.70 2.29 Las Primas
23LP-07 54.45 62.50 8.05 7.95 0.94 20.89 1.21 Las Primas
23LP-09 0.00 6.30 6.30 5.70 1.62 51.09 2.28 Las Primas
including 0.00 5.30 5.30 4.80 1.88 58.26 2.63 Las Primas
23LP-09 20.25 21.40 1.15 1.15 5.39 72.50 6.33 Las Primas
23LP-13 111.80 123.70 11.90 11.70 0.34 8.16 0.45 Las Primas
23LP-14 117.25 119.75 2.50 2.45 10.85 114.86 12.34 Las Primas
including 117.25 119.00 1.75 1.70 15.40 162.20 17.50 Las Primas
23LP-14 151.00 158.30 7.30 5.60 0.82 32.53 1.24 Las Primas
including 153.00 154.50 1.50 1.15 2.85 143.50 4.71 Las Primas
23LP-15 36.30 39.50 3.20 2.75 2.40 98.66 3.68 Las Primas
including 36.30 38.75 2.45 2.10 2.92 117.90 4.45 Las Primas
23LP-15 274.80 276.00 1.20 1.15 3.00 1474.00 22.08 Las Primas
23FRE-12 214.00 241.50 27.50 23.80 0.56 14.28 0.74 Fresnillo
23FRE-12 249.00 273.00 24.00 20.80 0.41 5.29 0.48 Fresnillo
23FRE-14 208.00 218.50 10.50 9.10 0.41 3.61 0.46 Fresnillo
23FRE-14 224.50 239.50 15.00 13.00 0.50 2.04 0.53 Fresnillo
23FRE-17 28.50 29.65 1.15 1.10 7.86 1.30 7.88 Fresnillo
23FRE-17 146.20 148.15 1.95 1.85 4.16 43.57 4.72 Fresnillo
including 147.20 148.15 0.95 0.90 8.08 60.90 8.87 Fresnillo
23FRE-18 367.00 368.45 1.45 1.35 3.81 4.80 3.87 Fresnillo
23FRE-19 273.60 286.20 12.60 10.90 1.06 45.22 1.65 Fresnillo
including 275.80 276.80 1.00 0.85 6.63 438.00 12.30 Fresnillo
23FRE-19 292.30 308.10 15.80 13.70 0.48 13.40 0.65 Fresnillo
23FRE-19 311.25 324.00 12.75 11.05 0.31 9.46 0.43 Fresnillo
23FRE-20 238.50 250.25 11.75 10.20 0.31 7.17 0.40 Fresnillo
23FRE-20 267.30 275.90 8.60 7.45 0.87 40.42 1.39 Fresnillo
including 270.45 271.50 1.05 0.90 2.02 108.70 3.43 Fresnillo
23FRE-20 295.25 311.15 15.90 13.75 0.33 7.20 0.42 Fresnillo


Table Notes:

  1. A complete table of assay results from all deposits and all secondary zones intersected utilizing a 0.20 gpt Au cut-off is on the Company's website, as well as accompanying notes on composite grades.
  2. Estimated True Widths (ETW) are estimated based on drill hole geology or comparisons with other on-section drill holes.
  3. Au Equivalent (AuEq) is calculated as Au gpt + (Ag gpt x ($22/$1700)) where $22 and $1700 are the price of one ounce of Ag and Au respectively (in US dollars).

Figure 2: Las Primas Area drilling update


Figure 3: Las Primas Area drilling update with grade shells


*Note: drill traces in blue are newly released.

Figure 4a: Las Primas Area cross sections A-A'


Figure 4b: Las Primas Area cross sections B-B'


Figure 4c: Las Primas Area cross sections C-C'


Figure 5: Fresnillo Area drilling update


Figure 6: Fresnillo Area drilling update with grade shells


*Note: drill traces in blue are newly released.

Drilling at Los Reyes is ongoing through the current rainy season (which is expected to end in the coming weeks) with four drill rigs focusing on:

  1. extending the high-grade Z-T shoots that remain open at depth, as well as along strike north and south;
  2. expanding the two other MRE resource areas, including the eastern extensions of the Guadalupe Zone and Echeguren Shaft area; and,
  3. exploring multiple new generative targets.

Prime has completed over 38,000 m of its planned 60,000 m 2023 drill program and will continue to evaluate its drilling plans using its success-based approach.

Link 1 - PDF Figures

Link 2 - PDF Drill Hole Tables

Note: Gold equivalent grades are calculated based on an assumed gold price of $US 1700 per ounce and silver price of $22 per ounce, based on the formula AuEq grade (gpt) = Au grade + Ag grade x ($22 / $1,700). Metallurgical recoveries are not considered in the in-situ grade estimate but are estimated to be 93% and 83% for gold and silver, respectively, when processed in a mill, and 72% and 25% respectively when heap-leached.

QA/QC Protocols and Sampling Procedures

Drill core at the Los Reyes project is drilled in predominately HQ size (63.5 millimetre "mm"), reducing to NQ (47.6 mm) when required. Drill core samples are generally 1.50 m long along the core axis with allowance for shorter or longer intervals if required to suit geological constraints. After logging intervals are identified to be sampled, the core is cut, and one half is submitted for assay. RC drilling returns rock chips and fines from a 133.35 mm diameter tricone bit. The returns are homogenized and split into two halves, with one half submitted for analysis and the other half stored.

Sample QA/QC measures include unmarked certified reference materials, blanks, and field duplicates as well as preparation duplicates are inserted into the sample sequence and make up approximately 8% of the samples submitted to the laboratory for each drill hole.

Samples are picked up from the Project by the laboratory personnel and transported to their facilities in Durango or Hermosillo Mexico, for sample preparation. Sample analysis is carried out by Bureau Veritas and ALS Labs, with fire assay, including over limits fire assay re-analysis, completed at their respective Hermosillo, Mexico laboratories and multi-element analysis completed in North Vancouver, Canada. Drill core sample preparation includes fine crushing of the sample to at least 70% passing less than 2 mm, sample splitting using a riffle splitter, and pulverizing a 250-gram split to at least 85% passing 75 microns.

Gold in diamond drill core is analyzed by fire assay and atomic absorption spectroscopy of a 30 g sample (code FA430 or Au-AA23). Multi-element chemistry is analyzed by 4-Acid digestion of a 0.25-gram sample split (code MA300 or ME-ICP61) with detection by inductively coupled plasma emission spectrometer for a full suite of elements.

Gold assay techniques FA430 and Au-AA23 have an upper detection limit of 10 ppm. Any sample that produces an over-limit gold value via the initial assay technique is sent for gravimetric finish via method FA-530 or Au-GRA21. Silver analyses by MA300 and ME-ICP61 have an upper limit of 200 ppm and 100 ppm, respectively. Samples with over-limit silver values are re-analyzed by fire assay with gravimetric finish FA530 or Au-GRA21.

Both Bureau Veritas and ALS Labs are ISO/IEC accredited assay laboratories.

Qualified Person

Scott Smith, P.Geo., Executive Vice President of Exploration, is a qualified person for the purposes of National Instrument 43-101 and has reviewed and approved the technical content in this news release.

Additional Notes

Metres is represented by "m"; "etw" is Estimated True Width and is based on drill hole geometry or comparisons with other on-section drill holes; "Au" refers to gold, and "Ag" refers to silver; "gpt" is grams per metric tonne; some figures may not sum due to rounding; Composite assay grades presented in summary tables are calculated using a Au grade minimum average of 0.20 gpt or 1.0 gpt as indicated in "Au Cut-off" column of Summary Tables. Maximum internal waste included in any reported composite interval is 3.00 m. The 1.00 gpt Au cut-off is used to define higher-grade "cores" within the lower-grade halo.

About the Los Reyes Gold and Silver Project

Los Reyes is a rapidly evolving high-grade, low sulphidation epithermal gold-silver project located in Sinaloa State, Mexico. Since acquiring Los Reyes in 2019, Prime has spent approximately US$30 million on direct exploration activities and has completed over 120,000 m of drilling. On May 2, 2023, Prime announced an updated multi-million-ounce high-grade open pit constrained resource (see below, and refer to Note 1 and the May 2, 2023 press release for more details).

May 2, 2023 Resource Statement



Drilling is on-going and suggests that the three known main deposit areas (Guadalupe, Central and Z-T) are larger than previously reported. Potential also exists for new discoveries where mineralized trends have been identified outside of the currently defined resource areas.

Historic operating results indicate that an estimated 1 million ounces of gold and 60 million ounces of silver were recovered from five separate operations at Los Reyes between 1770 and 1990. Prior to Prime's acquisition, recent operators of Los Reyes had spent approximately US$20 million on exploration, engineering, and prefeasibility studies.

About Prime Mining

Prime is managed by an ideal mix of successful mining executives, strong capital markets personnel and experienced local operators all focused on unlocking the full potential of the Los Reyes Project. The company has a well-planned capital structure with a strong management team and insider ownership.

ON BEHALF OF THE BOARD OF DIRECTORS

Daniel Kunz
Chief Executive Officer

For further information, please contact:

Daniel Kunz
Chief Executive Officer and Director
Prime Mining Corp.
1307 S. Colorado Ave.
Boise, Idaho 83706
Telephone: +1 (208) 926-6379 office
email: daniel@primeminingcorp.ca

Scott Hicks
Executive Vice President
Prime Mining Corp.
710 - 1030 West Georgia Street
Vancouver, BC, V6E 2Y3
Telephone: +1 (604) 428-6128 office
email: scott.hicks@primeminingcorp.ca

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward-Looking Information

This news release contains certain "forward-looking information" and "forward-looking statements" within the meaning of Canadian securities legislation as may be amended from time to time, including, without limitation, statements regarding the perceived merit of the Company's properties, including additional exploration potential of Los Reyes, potential quantity and/or grade of minerals, the potential size of the mineralized zone, metallurgical recoveries, and the Company's exploration and development plans in Mexico. Forward-looking statements are statements that are not historical facts which address events, results, outcomes, or developments that the Company expects to occur. Forward-looking statements are based on the beliefs, estimates and opinions of the Company's management on the date the statements are made, and they involve several risks and uncertainties. Certain material assumptions regarding such forward-looking statements were made, including without limitation, assumptions regarding the price of gold, silver and copper; the accuracy of mineral resource estimations; that there will be no material adverse change affecting the Company or its properties; that all required approvals will be obtained, including concession renewals and permitting; that political and legal developments will be consistent with current expectations; that currency and exchange rates will be consistent with current levels; and that there will be no significant disruptions affecting the Company or its properties. Consequently, there can be no assurances that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Forward-looking statements involve significant known and unknown risks and uncertainties, which could cause actual results to differ materially from those anticipated. These risks include, but are not limited to: risks related to uncertainties inherent in the preparation of mineral resource estimates, including but not limited to changes to the cost assumptions, variations in quantity of mineralized material, grade or recovery rates, changes to geotechnical or hydrogeological considerations, failure of plant, equipment or processes, changes to availability of power or the power rates, ability to maintain social license, changes to interest or tax rates, changes in project parameters, delays and costs inherent to consulting and accommodating rights of local communities, environmental risks, title risks, including concession renewal, commodity price and exchange rate fluctuations, risks relating to COVID-19, delays in or failure to receive access agreements or amended permits, risks inherent in the estimation of mineral resources; and risks associated with executing the Company's objectives and strategies, including costs and expenses, as well as those risk factors discussed in the Company's most recently filed management's discussion and analysis, as well as its annual information form dated April 22, 2022, available on www.sedar.com. Except as required by the securities disclosure laws and regulations applicable to the Company, the Company undertakes no obligation to update these forward-looking statements if management's beliefs, estimates or opinions, or other factors, should change.

Photos accompanying this announcement are available at:
https://www.globenewswire.com/NewsRoom/AttachmentNg/29a68a39-6940-4acb-8c4d-7b903f38014d
https://www.globenewswire.com/NewsRoom/AttachmentNg/4381b492-294b-4435-9563-9138f8e6d0ad
https://www.globenewswire.com/NewsRoom/AttachmentNg/7f21272b-2eea-41fe-b2a6-02846b77cec9
https://www.globenewswire.com/NewsRoom/AttachmentNg/9c1047d6-c5c8-4d0c-9d88-0a0a176422f5
https://www.globenewswire.com/NewsRoom/AttachmentNg/42ed5a1b-9ac5-496c-9a9b-4b3d9c2d94a9
https://www.globenewswire.com/NewsRoom/AttachmentNg/a4603a9d-22a6-4292-b410-916cac0c3d33
https://www.globenewswire.com/NewsRoom/AttachmentNg/49f2c511-2f48-4e62-9f75-740ddb716b2b
https://www.globenewswire.com/NewsRoom/AttachmentNg/53ffae5c-e245-4e23-b1c9-c07c2d8faa15
https://www.globenewswire.com/NewsRoom/AttachmentNg/2cc39d53-cfc8-4ad6-aaf2-642884a56075



Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Prime Mining Corp.
Bergbau
A2PRDW
CA74167M1059
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.