• Dienstag, 05 November 2024
  • 13:15 Uhr Frankfurt
  • 12:15 Uhr London
  • 07:15 Uhr New York
  • 07:15 Uhr Toronto
  • 04:15 Uhr Vancouver
  • 23:15 Uhr Sydney

Metal Energy Details Drill Plans for Lithium Brine Potential at SourceRock, Drilling Planned for Next Week

03.01.2024  |  Newsfile

Toronto, January 3, 2024 - Metal Energy Corp. (TSXV: MERG) (OTCQB: MEEEF) (the "Company" or "Metal Energy") is pleased to provide a detailed update for the Company's inaugural drill program at the SourceRock lithium brine project ("SourceRock" or the "Project") near Thunder Bay, Ontario, scheduled to begin in early January.

For an in-depth perspective on SourceRock and our plans, please watch this video from CEO James Sykes:

SourceRock's Drill Program Update

"We are excited to start our first drill program exploring for lithium brines on SourceRock in the coming days. If our thesis is correct, SourceRock could be a significant project of merit in the global lithium supply chain. SourceRock is hosted within an ancient sedimentary basin with all the criteria for discovering Ontario's first lithium brines. Historic drilling on the Project from multiple companies exploring for commodities other than lithium reported salty waters, dolomitic sediments, and interstitial to bedded gypsum, clays, and halites, which are all globally recognized characteristics frequently related to the presence of lithium brines," commented James Sykes, CEO of Metal Energy.

SourceRock Exploration Plans

SourceRock is a drill-ready project with an exploration permit from the Ontario Ministry of Mines for up to 20 drill pads. Historic drilling and geophysical data have identified saline brine drill targets on the Project. However, the brines have never been tested for lithium or other elements. The Company remains engaged with local Indigenous groups, communities, and stakeholders and anticipates a drill program to commence shortly in January 2024.

About the SourceRock Li Brine Project

SourceRock is highly prospective for lithium ("Li") brines in the Thunder Bay-Nipigon area of northwestern Ontario. The Project is exceptionally large, covering 913 square kilometres within an area measuring approximately 10 to 20 km wide by 95 km long (Figure 1), a size equivalent to the world's second largest lithium producing jurisdiction, Chile's Salar de Atacama's Central Salt Belt.

SourceRock encompasses 91,477 hectares within the Proterozoic Sibley sedimentary basin, Thunder Bay-Nipigon area, Ontario. The Project has excellent access to infrastructure and capacity that has supported previous exploration programs and mine development, including year-round highway, railroad, and seaport access, with power and natural gas lines crossing the Project.

For the latest videos from Metal Energy and other Ore Group companies, subscribe to our YouTube channel: youtube.com/@theoregroup

About Metal Energy Corp.

Metal Energy is a battery metal exploration company with two projects in politically stable Canadian jurisdictions; Manibridge (Ni-Cu-Co-PGE) in Manitoba, and SourceRock (Li-Na-K) in Ontario. The Manibridge Project is 85% owned by Metal Energy and 15% owned by Mistango River Resources Inc. (CSE: MIS). SourceRock is subject to earn-in agreement where the Company can acquire 100% exploration rights to the Project.

For further information, please contact:

Metal Energy Corp.
MERG on the TSXV
info@metalenergy.ca
www.metalenergy.ca

James Sykes, CEO
jsykes@oregroup.ca
306-221-8717

Reader Advisory

Certain information set forth in this news release contains forward-looking statements or information ("forward-looking ‎statements"), including details about the business of the Company. By their nature, forward-looking statements are subject to numerous risks ‎and uncertainties, some of which are beyond the Company's control, including the impact of general economic conditions, ‎industry conditions, volatility of commodity prices, currency fluctuations, environmental risks, operational risks, competition from ‎other industry participants, stock market volatility. Although the ‎Company believes that the expectations in its forward-looking statements are reasonable, its forward-looking statements have ‎been based on factors and assumptions concerning future events which may prove to be inaccurate. Those factors and ‎assumptions are based upon currently available information. Such statements are subject to known and unknown risks, ‎uncertainties and other factors that could influence actual results or events and cause actual results or events to differ materially ‎from those stated, anticipated or implied in the forward-looking statements. Accordingly, readers are cautioned not to place undue ‎reliance on the forward-looking statements, as no assurance can be provided as to future results, levels of activity or achievements. ‎Risks, uncertainties, material assumptions and other factors that could affect actual results are discussed in our public disclosure ‎documents available at www.sedarplus.ca including the Filing Statement dated November 15, 2021. Furthermore, the forward-looking statements contained in this document are made as of ‎the date of this document and, except as required by applicable law, the Company does not undertake any obligation to publicly ‎update or to revise any of the included forward-looking statements, whether as a result of new information, future events or ‎otherwise. The forward-looking statements contained in this document are expressly qualified by this cautionary statement.‎

Neither the TSX Venture Exchange Inc. nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.



FIGURE 1 - SourceRock project location map

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/7926/192739_79db408f94649863_005full.jpg

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/192739


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Metal Energy Corp.
Bergbau
A3C80P
CA5910881096
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.