• Montag, 25 November 2024
  • 00:27 Uhr Frankfurt
  • 23:27 Uhr London
  • 18:27 Uhr New York
  • 18:27 Uhr Toronto
  • 15:27 Uhr Vancouver
  • 10:27 Uhr Sydney

Pan Global Intersects 1.6% Copper Over 9.7 Meters Confirming Continuity Of La Romana Copper-tin-silver Discovery Over 1.4km

08.01.2024  |  CNW
VANCOUVER, Jan. 8, 2024 - Pan Global Resources Inc. ("Pan Global" or the "Company") (TSXV: PGZ) (OTCQX: PGZFF) (FSE: 2EU) is pleased to announce results for nine new drillholes from the La Romana copper-tin-silver (Cu-Sn-Ag) discovery in the Company's 100% owned Escacena Project in the Iberian Pyrite Belt, southern Spain. The drill holes are part of a 25-hole program aimed at delineating the western extension of the La Romana deposit.

The significance of these drill results:

  • The near surface copper mineralization is extended more than 50m west and is now continuous for a total strike length of 1.4km, remaining open for further expansion along strike to the northwest and down-dip
  • A new higher grade (1%-plus copper) sector has been identified with grades ranging as high as 7.7% copper over 1.7m. This mineralization is coincident with a 290m x 90m down-hole electromagnetic (DHEM) target, providing a strong guide to potential extensions for future drilling

Drilling Highlights:

  • LRD173: 9.7m at 1.69% CuEq1 (1.61% Cu, 0.02% Sn, 3.8 g/t Ag) from 99m, including 5.7m at 2.70% CuEq1 (2.58% Cu, 0.03% Sn, 6.2 g/t Ag);
  • LRD177: 8m at 1.48% CuEq1 (1.21% Cu, 0.10% Sn, 1.5 g/t Ag) from 55m, including 3.4m at 2.85% CuEq1 (2.72% Cu, 0.04% Sn, 3.2 g/t Ag);
  • LRD179: 18.1m at 0.65% CuEq1 (0.61% Cu, 0.01% Sn, 1.5g/t Ag) from 108m, including 6.1m at 1.50% CuEq1 (1.42% Cu, 0.02% Sn, 3.5g/t Ag);
  • LRD172: 12m at 0.74% CuEq1 (0.60% Cu, 0.05% Sn, 1.4 g/t Ag) from 76m, including 6m at 1.36% CuEq1 (1.09% Cu, 0.10% Sn, 2.6 g/t Ag);
  • Drilling to resume in 2024, including five holes in the current plan at La Romana

"These drill results highlight a significant new zone of higher-grade copper at La Romana that remains wide open to the northwest. Drilling continues to grow the La Romana deposit, demonstrating good continuity of the mineralization over 1.4 kilometers strike length, and from surface to more than 200m down-dip. We look forward to resuming drilling shortly and advancing the growing pipeline of high priority exploration targets in the Escacena Project, particularly the copper/gold discovery at Cañada Honda and high-priority Bravo target following access," said Tim Moody, President and CEO of Pan Global.

"Ongoing exploration continues to demonstrate multi-discovery potential with numerous targets not yet tested. The Project is located in a tier one mining jurisdiction, in close proximity with producing copper mines and advanced development projects, and excellent infrastructure," said Mr. Moody.

Drillhole locations are shown in Figure 1 below. Drillhole assay results are summarized in Table 1 and collar details are presented in Table 2 below.

The main La Romana copper mineralization occurs in two highly continuous layers, Zone B and Zone C, commencing from surface or directly below a thin cover of post-mineral sediments. The mineralization includes primary chalcopyrite and minor bornite, overprinted at shallow depths by secondary/supergene copper sulphide (chalcocite) and an overlying oxide zone with local native copper and copper oxides. The tin mineralization is cassiterite, the preferred mineral for commercial extraction.

Table 1 - La Romana new drill results summary

Hole ID

From

To

Interval

CuEq1

Cu

Sn

Ag


Au

Pb

Zn

True
Width


m

m

m

%

%

%

g/t


g/t

ppm

ppm

(m)

LRD172

76.00

88.00

12.00

0.74

0.60

0.05

1.4


0.02

8

86

12.0

including

82.00

88.00

6.00

1.36

1.09

0.10

2.6


0.03

14

109

6.0

including

84.00

87.00

3.00

1.55

1.28

0.09

3.3


0.03

9

116

3.0

and

123.00

135.00

12.00

0.20

0.15

0.02

0.3


0.01

4

75

12.0

LRD173

99.00

108.70

9.70

1.69

1.61

0.02

3.8


0.02

10

112

7.9

including

103.00

108.70

5.70

2.70

2.58

0.03

6.2


0.02

14

147

4.6

Including

107.00

108.70

1.70

7.93

7.73

0.04

19.1


0.08

35

313

1.4

and

142.00

146.00

4.00

0.36

0.29

0.03

0.7


0.02

8

68

3.3

LRD174

86.00

94.00

8.00

0.55

0.52

0.01

1.1


0.01

2.5

63

7.5

including

91.00

93.00

2.00

1.33

1.26

0.02

2.3


0.01

4

90

1.9

and

134.00

139.00

5.00

0.49

0.27

0.08

0.5


0.04

10

76

4.7

and

165.00

166.00

1.00

1.99

1.95

0.01

3.5


0.02

31

202

0.94

LRD175

55.00

68.00

13.00

0.14

0.11

0.01

0.4


0.0

3

62

13.0

LRD176

27.00

30.00

3.00

0.47

0.44

0.01

0.9


0.01

42

91

2.1

and

95.00

101.30

6.30

0.39

0.35

0.01

0.5


0.02

10

69

4.5

LRD177

4.00

12.00

8.00

0.25

0.23

0.0

0.2


0.0

1

112

3.4

and

55.00

63.00

8.00

1.48

1.21

0.10

1.5


0.02

16

93

3.4

including

56.00

59.4

3.40

2.85

2.72

0.04

3.2


0.04

23

118

1.4

Including

58.20

59.4

1.20

7.50

7.24

0.08

7.7


0.08

42

198

0.5

LRD178

114.20

115.10

0.90

2.20

1.95

0.08

5.6


0.08

63

120

0.64

LRD179

43.00

44.00

1.00

0.17

0.10

0.01

8.4


0.03

1.55 %

3.37 %

0.7

and

108.00

126.10

18.10

0.65

0.61

0.01

1.5


0.01

6

76

12.8

including

120.00

126.10

6.10

1.50

1.42

0.02

3.5


0.01

9

102

4.3

and

162.00

166.00

4.00

0.23

0.21

0.01

0.5


0.01

4

41

2.8

and

171.00

173.00

2.00

0.74

0.63

0.04

1.9


0.02

26

79

1.4

and

206.00

207.00

1.00

0.99

0.75

0.09

1.2


0.05

16

93

0.7

LRD180

119.00

132.00

13.00

0.66

0.60

0.02

1.2


0.01

10

86

9.8

including

127.00

131.00

4.00

1.55

1.45

0.03

2.8


0.02

17

122

3.0

1 Copper Equivalent = CuEq. CuEq is calculated using Cu, Sn, and Ag grades. Metallurgical recoveries include 86% for Cu, 68% for Sn and 56% for Ag, from preliminary studies by Wardell Armstrong International and MinePro. The CuEq calculation uses US$ 8,693/tonne Cu, US$ 29,069/tonne Sn and US$ 23.72/oz Ag, corresponding to the three-year monthly price averages to July 2023. The effective formula is [CuEq %] = [Cu %] + 2.6440 * [Sn %] + 0.0057 * [Ag ppm]

Table 2 - La Romana drillhole collar information (9 holes, total 1,590.1m)

Hole ID

Easting 2

Northing 2

Azimuth (o)

Dip (o)

Depth (m)

LRD172

735839

4152864

210

-45

203.4

LRD173

735840

4152867

190

-75

200.8

LRD174

735839

4152868

230

-50

182.7

LRD175

735721

4152836

210

-45

89.5

LRD176

735722

4152837

0

-90

159

LRD177

735719

4152837

100

-50

109.7

LRD178

735704

4152871

0

-90

190.5

LRD179

735870

4152842

0

-90

224.7

LRD180

735829

4152904

180

-75

229.8

2 Coordinate system: UTM29N ERTS89

About the Escacena Project

The Escacena Project comprises a large, contiguous, 5,760-hectare land package controlled 100% by Pan Global in the east of the Iberian Pyrite Belt. Escacena is located near operating mines at Las Cruces and Riotinto and is immediately adjacent to the former Aznalcóllar and Los Frailes mines where Minera Los Frailes/Grupo Mexico is in the final permitting stage to recommence mining. The Escacena Project hosts the La Romana copper-tin-silver discovery and a number of other prospective targets, including Cañada Honda, Romana North, Bravo, Barbacena, El Pozo, San Pablo, Zarcita, Hornitos, La Jarosa, and Romana Deep.

About Pan Global Resources

Pan Global Resources Inc. is actively targeting copper-rich mineral deposits, given copper's compelling supply-demand fundamentals and outlook for strong long-term prices as a critical metal for global electrification and energy transition. The Company's flagship Escacena Project is located in the prolific Iberian Pyrite Belt in southern Spain, where a favourable permitting track record, excellent infrastructure, mining and professional expertise, and support for copper as a Strategic Raw Material by the European Commission collectively define a tier-one jurisdiction for mining investment. The Pan Global team comprises proven talent in exploration, discovery, development, and mine operations - all of which are committed to operating safely and with utmost respect for the environment and our partnered communities. The Company is a member, and operates under the principles of, the United Nations Global Compact.

QA/QC Procedures

Core size was HQ (63mm) and all samples were ½ core. Nominal sample size was 1m core length and ranged from 0.5 to 2m. Sample intervals were defined using geological contacts with the start and end of each sample physically marked on the core. Diamond blade core cutting and sampling was supervised at all times by Company staff. Duplicate samples of ¼ core were taken approximately every 30 samples and Certified Reference materials inserted every 25 samples in each batch.

Samples were delivered to ALS laboratory in Seville, Spain and assayed at the ALS laboratory in Ireland. All samples were crushed and split (method CRU-31, SPL22Y), and pulverized using (method PUL-31). Gold analysis was by 50gm fire assay with ICP finish (method Au-ICP22) and multi element analysis was undertaken using a 4-acid digest with ICP AES finish (method ME-ICP61). Over grade base metal results were assayed using a 4-acid digest ICP AES (method OG-62). Over grade tin was determined using peroxide fusion with ICP finish (method Sn-ICP81x).

Qualified Persons

James Royall, Vice President Exploration for Pan Global Resources and a qualified person as defined by National Instrument 43-101, has approved the scientific and technical information for this media release. Mr. Royall is not independent of the Company.

www.panglobalresources.com

Forward-looking statements

Statements which are not purely historical are forward-looking statements, including any statements regarding beliefs, plans, expectations, or intentions regarding the future. It is important to note that actual outcomes and the Company's actual results could differ materially from those in such forward-looking statements. The Company believes that the expectations reflected in the forward-looking information included in this media release are reasonable, but no assurance can be given that these expectations will prove to be correct and such forward-looking information should not be unduly relied upon. Risks and uncertainties include, but are not limited to, economic, competitive, governmental, environmental, and technological factors that may affect the Company's operations, markets, products, and prices. Readers should refer to the risk disclosures outlined in the Company's Management Discussion and Analysis of its audited financial statements filed with the British Columbia Securities Commission.

The forward-looking information contained in this media release is based on information available to the Company as of the date of this media release. Except as required under applicable securities legislation, the Company does not intend, and does not assume any obligation, to update this forward-looking information.

NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.

SOURCE Pan Global Resources Inc.



Contact
Jason Mercier, VP Investor Relations and Communications, jason@panglobalresources.com / investors@panglobalresources.com, Tel: +1-778-372-7101 / +1-604-689-9930, www.panglobalresources.com

Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Pan Global Resources Inc.
Bergbau
A2JKW3
CA69806A1084
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.