First Phosphate Corp Reports Positive Drill Results at Bégin-Lamarche Project in Quebec
Passalacqua highlighted the progress, noting that 23 drill holes have been completed in the Phosphate Mountain Zone, with results from 14 holes showing grades exceeding 10% P2O5 over widths ranging from 7 to 92 meters. Notably, drill hole BL-24-67 intersected 11.85% P2O5 over 84.0 meters from a surface depth of 3.0 meters, indicating significant phosphate mineralization in the area.
Additionally, Passalacqua discussed drilling in the Southern Zone, where continuous widths of over 100 meters of phosphate mineralization have been observed. Drill hole BL-24-60 intersected 5.21% P2O5 over 194.0 meters from the surface, while drill hole BL-24-83 intersected 5.81% P2O5 over 216.1 meters, further confirming the project's potential.
Contact Details
Proactive Investors
+1 604-688-8158
na-editorial@proactiveinvestors.com
View source version on newsdirect.com: https://newsdirect.com/news/first-phosphate-corp-reports-positive-drill-results-at-begin-lamarche-project-in-quebec-711329175