• Donnerstag, 26 Dezember 2024
  • 04:46 Uhr Frankfurt
  • 03:46 Uhr London
  • 22:46 Uhr New York
  • 22:46 Uhr Toronto
  • 19:46 Uhr Vancouver
  • 14:46 Uhr Sydney

Pan Global Resources Inc. Intersects 6.5m Of 1.22 G/T Gold And 14m Of 0.46% Copper

18.07.2024  |  CNW
Expanding Mineralization At Cañada Honda Discovery, Escacena Project, Southern Spain

  • VMS-style copper and stacked-vein-hosted gold mineralization associated with a 3km-long, coincident gravity and heliborne-electromagnetic target

  • Latest drilling confirms copper-gold mineralization continues down-dip to the north, with higher grades coincident with the gravity anomaly

  • Multiple stacked-vein-hosted gold intersections, with new intercept grades up to 6.5g/t gold

  • VANCOUVER, July 18, 2024 - Pan Global Resources Inc. ("Pan Global" or the "Company") (TSXV: PGZ) (OTCQX: PGZFF) (FSE: 2EU) is pleased to announce results for three additional holes from the ongoing drill program at the Cañada Honda copper-gold (Cu-Au) discovery, in the Company's 100% owned Escacena Project in the Iberian Pyrite Belt, southern Spain. The drillholes are part of an 11-hole step-out drill program at Cañada Honda that started in November, with eight completed and three additional drillholes planned. Cañada Honda is located 3.5km north of Pan Global's La Romana copper-tin-silver deposit, where delineation drilling continues.

    "These latest drill results testing the northern edge of the gravity target at Cañada Honda have successfully confirmed the down-dip continuation of the copper and gold mineralization and expanded the surface extent to more than 450m x 450m. All the drilling to-date is at the eastern end of a very large, mostly untested, 3km east-west, coincident gravity and heliborne electro-magnetic ("HEM") target. The scale of the geophysics targets, combined with drillhole confirmation that mineralization is associated with the anomaly, suggests Cañada Honda mineralization may be extensive. Next planned drillholes are aiming to test for higher grades and expand the mineralization to the west," said Tim Moody, Pan Global's President & CEO.

    Drill highlights:

    Drillhole CHD14

    • 1m at 0.17% Cu, 6.52g/t Au, 5.8g/t Ag from 290m, and
    • 6.5m at 1.22g/t Au, 1.4g/t Ag from 315.5m, and
    • 14m at 0.46% Cu, 0.16g/t Au, 5.2g/t Ag from 355m

    Drillhole CHD16

    • 13m at 0.62g/t Au from 239m including
      • 1m at 0.65% Cu, 1.92g/t Au, 2.7g/t Ag
    • 1m at 5.53g/t Au, 1.1g/t Ag from 322m
    • 15m at 0.23% Cu, 0.51g/t Au, 1.1g/t Ag from 340m, including
      • 1m at 0.14% Cu, 3.55g/t Au, 5.4g/t Ag

    Drillhole locations are shown in Figure 1 below. Drillhole assay results are summarized in Table 1 and drillhole collar details are presented in Table 2 below.

    The three new holes were drilled along the northern margin of the gravity target, confirming continuation of the mineralization down-dip to the north, including multiple gold intersections. Copper grades appear to be decreasing down-dip and away from the gravity anomaly. Downhole electromagnetic ("DHEM") surveys completed in all three drillholes indicates potential stronger sulphide mineralization up-dip and coincident with the modelled gravity target, consistent with higher copper-gold grades in the previous drilling. The next three planned drillholes will test for higher-grade extensions of the mineralization to the west following vectors from the drill results and geophysics.

    Additional drill results will be reported as soon as available from the ongoing drilling, including the La Romana deposit where 183 holes have been drilled to date. In the coming weeks, the Company also anticipates commencing exploration at the large Bravo gravity target east of La Romana.

    Table 1 - Cañada Honda Selected Drill Results

    Hole ID

    From

    To

    Interval1

    Cu

    Au

    Ag

    Co

    Pb

    Zn

    m

    m

    m

    %

    g/t

    g/t

    ppm

    ppm

    ppm

    CHD14

    100

    103

    3

    0.07

    0.37

    7.2

    78

    1673

    2889

    and

    134

    135

    1

    0.05

    1.29

    11.2

    36

    2870

    5450

    and

    271

    272

    1

    0.33

    0.63

    23.0

    63

    4930

    3160

    and

    290

    291

    1

    0.17

    6.52

    5.8

    154

    253

    201

    and

    315.5

    322

    6.5

    0.07

    1.22

    1.4

    122

    30

    66

    Incl.

    317.5

    318.5

    1

    0.24

    1.94

    4.7

    275

    88

    133

    and

    356

    370

    14

    0.46

    0.16

    5.2

    74

    70

    112

    Incl.

    360

    364

    4

    0.87

    0.17

    10.5

    109

    144

    140

    Incl.

    362

    363

    1

    1.24

    0.22

    21.0

    66

    239

    193

    CHD15

    No significant results

    CHD16

    115

    116

    1

    <0.01

    1.37

    0.8

    81

    118

    54

    and

    239

    252

    13

    0.06

    0.62

    0.4

    33

    5

    47

    Incl.

    251

    252

    1

    0.65

    1.92

    2.7

    118

    24

    72

    and

    265.5

    266.5

    1

    0.11

    1.17

    3.4

    216

    197

    1200

    and

    322

    323

    1

    0.03

    5.53

    1.1

    204

    71

    54

    and

    340

    355

    15

    0.23

    0.51

    1.1

    134

    68

    145

    Incl.

    354

    355

    1

    0.14

    3.55

    5.4

    71

    178

    632

    1 Approximate true thickness

    Table 2 - Cañada Honda Drillhole Collar Information

    Hole ID

    Easting2

    Northing2

    Azimuth (º)

    Dip (º)

    Length (m)

    CHD14

    737080

    4156488

    175

    -72

    390.9

    CHD15

    737335

    4156454

    180

    -70

    293.4

    CHD16

    737201

    4156478

    175

    -75

    366.75

    2 Coordinate system: UTM29N ERTS89

    About the Escacena Project

    The Escacena Project comprises a large, contiguous, 5.760-hectare land package controlled 100% by Pan Global in the east of the Iberian Pyrite Belt. Escacena is located near the operating mine at Riotinto and is immediately adjacent to the former Aznalcóllar and Los Frailes mines where Minera Los Frailes/Grupo México is in the final permitting stage with construction anticipated to start in 2024. The Escacena Project hosts Pan Global's La Romana copper-tin-silver and Cañada Honda copper-gold discoveries and a number of other prospective targets, including, Bravo, Barbacena, El Pozo, Romana Norte, San Pablo, Zarcita, Hornitos, La Jarosa, Romana Deep, and Cortijo.

    About Pan Global Resources

    Pan Global Resources Inc. is actively targeting copper-rich mineral deposits, given copper's compelling supply-demand fundamentals and outlook for strong long-term prices as a critical metal for global electrification and energy transition. The Company's flagship Escacena Project is located in the prolific Iberian Pyrite Belt in southern Spain, where a favourable permitting track record, excellent infrastructure, mining and professional expertise, and support for copper as a Strategic Raw Material by the European Commission collectively define a tier-one jurisdiction for mining investment. The Pan Global team comprises proven talent in exploration, discovery, development, and mine operations - all of which are committed to operating safely and with utmost respect for the environment and our partnered communities. The Company is a member, and operates under the principles of, the United Nations Global Compact.

    QA/QC Procedures

    Core size was HQ (63mm) and all samples were ½ core. Nominal sample size was 1m core length and ranged from 0.5 to 2m. Sample intervals were defined using geological contacts with the start and end of each sample physically marked on the core. Diamond blade core cutting and sampling was supervised at all times by Company staff. Duplicate samples of ¼ core were taken approximately every 30 samples and Certified Reference materials inserted every 25 samples in each batch.

    Samples were delivered to ALS laboratory in Seville, Spain and assayed at the ALS laboratory in Ireland. All samples were crushed and split (method CRU-31, SPL22Y), and pulverized using (method PUL-31). Gold analysis was by 50gm fire assay with ICP finish (method Au-ICP22) and multi element analysis was undertaken using a 4-acid digest with ICP AES finish (method ME-ICP61). Over grade base metal results were assayed using a 4-acid digest ICP AES (method OG-62).

    Qualified Persons

    Álvaro Merino. Vice President Exploration for Pan Global Resources and a qualified person as defined by National Instrument 43-101, has approved the scientific and technical information for this media release. Mr. Merino is not independent of the Company.

    Forward-looking statements

    Statements which are not purely historical are forward-looking statements, including any statements regarding beliefs, plans, expectations, or intentions regarding the future. It is important to note that actual outcomes and the Company's actual results could differ materially from those in such forward-looking statements. The Company believes that the expectations reflected in the forward-looking information included in this media release are reasonable, but no assurance can be given that these expectations will prove to be correct and such forward-looking information should not be unduly relied upon. Risks and uncertainties include, but are not limited to, economic, competitive, governmental, environmental, and technological factors that may affect the Company's operations, markets, products, and prices. Readers should refer to the risk disclosures outlined in the Company's Management Discussion and Analysis of its audited financial statements filed with the British Columbia Securities Commission.

    The forward-looking information contained in this media release is based on information available to the Company as of the date of this media release. Except as required under applicable securities legislation, the Company does not intend, and does not assume any obligation, to update this forward-looking information.

    NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE

    SOURCE Pan Global Resources Inc.



    Contact
    FOR MORE INFORMATION PLEASE CONTACT: Jason Mercier, VP Investor Relations and Communications, jason@panglobalresources.com / investors@panglobalresources.com, Tel: +1-778-372-7101 / +1-236-886-9518, www.panglobalresources.com

    Bewerten 
    A A A
    PDF Versenden Drucken

    Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



    Mineninfo
    Pan Global Resources Inc.
    Bergbau
    A2JKW3
    CA69806A1084
    Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
    Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
    Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.