• Freitag, 27 Dezember 2024
  • 04:15 Uhr Frankfurt
  • 03:15 Uhr London
  • 22:15 Uhr New York
  • 22:15 Uhr Toronto
  • 19:15 Uhr Vancouver
  • 14:15 Uhr Sydney

F3 Hits 12.0% U3O8 Over 2.0m Within 2.66% Over 10.5m

29.10.2024  |  Newsfile

Discovers A1 Shear Extension 3.2km South of JR

Kelowna, October 29, 2024 - F3 Uranium Corp. (TSXV: FUU) (OTC Pink: FUUFF) ("F3" or "the Company") is pleased to announce assay results for thirteen drillholes of the ongoing 2024 drill program on the PLN Property, including PLN24-161 at the JR Zone (see NR August 13, 2024) which returned 10.5m of 2.66% U3O8, including a high grade 2.0m interval averaging 12.0% U3O8, further including an ultra-high grade core of 0.5m of 20.7% U3O8. Significant mineralization over a 13.5m interval was intersected in PLN24-184 on line 105S at JR, including 1.5m off-scale radioactivity (>65,535 cps) between 235.60 and 240.10m.

Exploration drilling focused mainly on the B1 area close to, and south of the Harrison Fault, with a number of very prospective drill holes, highlighted by PLN24-187 which was drilled on line 3240S, approximately 400m south of the Harrison Fault, and on section with PLN24-183. PLN24-183 was the first hole to intersect what is interpreted to be the southern extension of the A1 shear zone hosting the JR Zone. Due to encouraging alteration and intense shearing a down dip hole was drilled, and PLN24-187 encountered intense alteration and anomalous radioactivity (see Table 1 and Photo 1).

Sam Hartmann, Vice President Exploration, commented:

"Today's update includes scintillometer results of drilling in the JR Zone, where three holes successfully targeted high grade mineralization in areas of lower drill hole density, as well as high-grade assay results of drillholes completed and previously announced earlier in the program. Exploration drilling south of the Harrison Fault discovered the A1 Shear Extension, ~400m beyond the previously interpreted southern extent of the A1 shear, as a discrete continuation, and parallel to the B1 structures. This potential for stacked and parallel structure south of Harrison Fault provides further high priority drill targets for high grade uranium mineralization."

JR Zone Assay Highlights:

PLN24-161 (line 035S):

  • 10.5m @ 2.66% U3O8 (206.5m to 217.5m), including:
  • 2.0m @ 12.0% U3O8 (207.5m to 209.5m), further including:
  • 0.5m @ 20.7% U3O8 (208.0m to 208.5m)

PLN24-163 (line 095S):

  • 13.0m @ 0.45% U3O8 (197.0m to 210.0m), including:
  • 2.5m @ 1.77 % U3O8 (204.0m to 206.5m)

JR Zone Handheld Spectrometer Highlights:

PLN24-184 (line 105S):

  • 13.5m mineralization from 228.5m - 242.0m, including
    • 3.80 m cumulative mineralization of >10,000 cps radioactivity between 233.00m - 240.30m, including 1.5m cumulative off-scale radioactivity (>65,535 cps) between 235.60 -240.10m

PLN24-185 (line 025S)

  • 13.0m mineralization from 218.0m - 231.0m, including
    • 2.30 m cumulative mineralization of >10,000 cps radioactivity between 223.00m - 230.50m, including 0.5m cumulative off-scale radioactivity (>65,535 cps) between 223.00 -2424.00m

Exploration Handheld Spectrometer Highlights:

PLN24-178 (line 2835S): B1 Exploration

  • 0.5m radioactivity from 446.5m - 447m with a peak of 310 cps

PLN24-180 (line 1125S): A1 South Exploration

  • 0.5m radioactivity from 319.0m - 319.5m with a peak of 700 cps

PLN24-181 (line 2880S): B1 Exploration

  • 0.5m radioactivity from 377.5m - 378.0m with a peak of 360 cps

PLN24-187 (line 3240S): B1 Exploration

  • 0.5m radioactivity from 549.0m - 549.5m with a peak of 300 cps



Figure 1: JR Zone Assay and Spectrometer Results

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8110/228040_figure1.jpg



Figure 2: 2024 Drilling on A1 and B1 Shear Zones and new A1 Shear Extension

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8110/228040_plndrill2.jpg



Photo 1. A1 Extension in PLN24-187

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8110/228040_2deb68b6544e78ce_003full.jpg

Table 1. Drill Hole Summary and Uranium Assay Results


Collar Information

Assay Results
Hole ID Grid Line Easting Northing Elevation Az Dip From
(m)
To
(m)
Interval
(m)
U3O8 weight %
PLN24-153 555S 588064.37 6410321.99 534.56 -72.0 55.6 A1 Exploration; no mineralization >0.05
PLN24-154 2100S 587534.07 6408053.06 531.83 -60.2 35.9 A3 Exploration; no mineralization >0.05
PLN24-155 1215S 588507.31 6409827.87 536.43 -69.9 58.0 A1 Exploration; no mineralization >0.05
PLN24-156 1335S 588571.28 6409726.11 543.90 -70.0 53.2 A1 Exploration; no mineralization >0.05
PLN24-157 2745S 589215.28 6408451.38 540.75 -65.3 54.2 A1 Exploration; no mineralization >0.05
PLN24-158 2040S 588934.86 6409122.90 543.88 -70.1 56.5 A1 Exploration; no mineralization >0.05
PLN24-159 2235S 589041.26 6408957.53 543.16 -70.5 52.4 A1 Exploration; no mineralization >0.05
PLN24-160 2430S 589122.80 6408773.08 543.36 -71.5 59.0 A1 Exploration; no mineralization >0.05
PLN24-161 035S 587790.97 6410763.91 546.37 -80.3 57.0 206.50 207.50 1.00 0.19







207.50 209.50 2.00 12.0






incl 208.00 208.50 0.50 20.7







209.50 217.00 7.50 0.49






incl 215.50 216.00 0.50 2.31
PLN24-162 2850S 589301.35 6408383.61 538.03 -67.9 54.5 A1 Exploration; no mineralization >0.05
PLN24-163 095S 587813.11 6410709.84 546.85 -78.5 52.4 197.00 204.00 7.00 0.09







204.00 206.50 2.50 1.77






incl 205.50 206.00 0.50 3.32







206.50 210.00 3.50 0.24
PLN24-164 2880S 589259.50 6408356.75 538.22 -65.3 68.9 A1 Exploration; no mineralization >0.05
PLN24-165 3195S 589613.77 6408183.67 535.01 -72.4 55.0 B1 Exploration; no mineralization >0.05











Assay composite parameters:
1: Minimum Thickness of 0.5 m
2: Assay Grade Cut-Off: 0.05% U3O8 (weight %)
3. Maximum Internal Dilution: 2.0 m

Table 2. Drill Hole Summary and Handheld Spectrometer Results

Collar Information * Hand-held Spectrometer Results On Mineralized Drillcore (>300 cps / >0.5m minimum) Athabasca Unconformity Depth (m) Total Drillhole Depth (m)
Hole ID Section Line Easting Northing Elevation Az Dip From
(m)
To
(m)
Interval (m) Max CPS
PLN24-178 2835S 589250.1 6408364.9 537.6 -66.5 53.5 446.50 447.00 0.50 310 175.4 554
PLN24-179 4245S 590177.8 6407292.3 542.2 -64.3 54.2 B1 MSZ Exploration; no radioactivity
>300 cps
372.8 533
PLN24-180 1125S 588192.3 6409710.1 542.3 -60.1 54.4 319.00 319.50 0.50 700 n.a. 556
PLN24-181 2880S 589300.5 6408383.0 539.6 -65.1 79.3 377.50 378.00 0.50 360 200.0, 308.6, 360.3 466
PLN24-182 5280S 590644.1 6406355.3 539.2 -71.8 53.6 B1 MSZ Exploration; no radioactivity
>300 cps
342.7 446
PLN24-183 3240S 589413.8 6407982.6 530.1 -59.0 54.1 B1 MSZ Exploration; no radioactivity
>300 cps
392.6 743
PLN24-184 105S 587752.6 6410654.2 544.6 -62.1 53.2 207.50 208.00 0.50 540 194.4 290







228.50 229.00 0.50 980








229.00 229.50 0.50 560








229.50 230.00 0.50 1100








230.00 230.50 0.50 540








230.50 231.00 0.50 <300








231.00 231.50 0.50 2400








231.50 232.00 0.50 690








232.00 232.50 0.50 680








232.50 233.00 0.50 540








233.00 233.50 0.50 36100








233.50 233.80 0.30 22100








233.80 234.00 0.20 9900








234.00 234.50 0.50 350








234.50 235.00 0.50 7200








235.00 235.50 0.50 8700








235.50 235.60 0.10 65500








235.60 235.90 0.30 >65535








235.90 236.00 0.10 65500








236.00 236.50 0.50 550








236.50 237.00 0.50 16900








237.00 237.50 0.50 730








237.50 238.00 0.50 1700








238.00 238.15 0.15 65500








238.15 238.50 0.35 >65535








238.50 238.65 0.15 65500








238.65 239.00 0.35 >65535








239.00 239.20 0.20 23300








239.20 239.50 0.30 9900








239.50 239.60 0.10 65500








239.60 240.00 0.40 >65535








240.00 240.10 0.10 >65535








240.10 240.30 0.20 65500








240.30 240.50 0.20 9900








240.50 241.00 0.50 520








241.00 241.50 0.50 620








241.50 242.00 0.50 440








244.00 244.50 0.50 750








244.50 245.00 0.50 810

PLN24-185 025S 587736.8 6410738.8 545.3 -65.9 52.9 218.00 218.50 0.50 570 197.2 278







218.50 219.50 1.00 <300








219.50 220.00 0.50 800








220.00 220.50 0.50 630








220.50 221.00 0.50 380








221.00 222.00 1.00 <300








222.00 222.50 0.50 6100








222.50 223.00 0.50 5600








223.00 223.30 0.30 >65535








223.30 223.50 0.20 59400








223.50 223.80 0.30 58700








223.80 224.00 0.20 >65535








224.00 224.50 0.50 46700








224.50 224.85 0.35 23200








224.85 225.00 0.15 9800








225.00 225.25 0.25 17600








225.25 225.50 0.25 9100








225.50 226.00 0.50 8300








226.00 226.50 0.50 4600








226.50 227.00 0.50 8000








227.00 227.50 0.50 800








227.50 228.00 0.50 380








228.00 228.50 0.50 800








228.50 230.00 1.50 <300








230.00 230.30 0.30 5200








230.30 230.50 0.20 33000








230.50 231.00 0.50 1100

PLN24-186 035S 587810.1 6410777.2 545.7 -79.2 50.9 186.50 187.00 0.50 360 175.0 263







187.00 187.50 0.50 810








187.50 188.00 0.50 310








188.00 188.50 0.50 350








188.50 189.00 0.50 <300








189.00 189.50 0.50 560








189.50 190.00 0.50 1100








190.00 190.50 0.50 1400








190.50 191.00 0.50 1700








191.00 191.50 0.50 2400








191.50 191.65 0.15 4100








191.65 192.00 0.35 13100








192.00 192.50 0.50 2600








192.50 193.00 0.50 2000








193.00 193.50 0.50 13300








193.50 194.00 0.50 9400








194.00 194.50 0.50 7000








194.50 195.00 0.50 2800








195.00 195.50 0.50 3500








195.50 196.00 0.50 330








196.00 196.50 0.50 1700








196.50 197.00 0.50 1300








197.00 197.50 0.50 470

PLN24-187 3240S 589410.2 6407980.4 530.8 -65.4 53.8 549.00 549.50 0.50 300 373.0 713













Handheld spectrometer composite parameters:
1: Minimum Thickness of 0.5m
2: CPS Cut-Off of 300 counts per second
3: Maximum Internal Dilution of 2.0m

Natural gamma radiation in the drill core that is reported in this news release was measured in counts per second (cps) using a handheld Radiation Solutions RS-125 scintillometer. The Company considers greater than 300 cps on the handheld spectrometer as anomalous, >10,000 cps as high grade and greater than 65,535 cps as off-scale. The reader is cautioned that scintillometer readings are not directly or uniformly related to uranium grades of the rock sample measured and should be used only as a preliminary indication of the presence of radioactive materials.

Composited weight % U3O8 mineralized intervals are summarized in Table 1. Samples from the drill core are split in half sections on site. Where possible, samples are standardized at 0.5m down-hole intervals. One-half of the split sample is sent to SRC Geoanalytical Laboratories (an SCC ISO/IEC 17025: 2005 Accredited Facility) in Saskatoon, SK while the other half remains on site for reference. Analysis includes a 63 element suite including boron by ICP-OES, uranium by ICP-MS and gold analysis by ICP-OES and/or AAS.

The Company considers uranium mineralization with assay results of greater than 1.0 weight % U3O8 as "high grade" and results greater than 20.0 weight % U3O8 as "ultra-high grade."

All depth measurements reported are down-hole and true thickness are yet to be determined.

About Patterson Lake North:

The Company's 4,078-hectare 100% owned Patterson Lake North property (PLN) is located just within the south-western edge of the Athabasca Basin in proximity to Fission Uranium's Triple R and NexGen Energy's Arrow high-grade world class uranium deposits which is poised to become the next major area of development for new uranium operations in northern Saskatchewan. PLN is accessed by Provincial Highway 955, which transects the property, and the new JR Zone uranium discovery is located 23km northwest of Fission Uranium's Triple R deposit.

Qualified Person:

The technical information in this news release has been prepare in accordance with the Canadian regulatory requirements set out in National Instrument 43-101 and approved on behalf of the company by Raymond Ashley, P.Geo., President & COO of F3 Uranium Corp, a Qualified Person. Mr. Ashley has verified the data disclosed.

About F3 Uranium Corp:

F3 Uranium is a uranium exploration company advancing its newly discovered high-grade JR Zone and exploring for additional mineralized zones on its 100%-owned Patterson Lake North (PLN) Project in the southwest Athabasca Basin. PLN is accessed by Provincial Highway 955, which transects the property, and the new JR Zone discovery is located ~25km northwest of Fission Uranium's Triple R and NexGen Energy's Arrow high-grade uranium deposits. This area is poised to become the next major area of development for new uranium operations in northern Saskatchewan. The PLN project is comprised of the PLN, Minto and Broach properties. The Broach property incorporates the former PW property which was obtained from CanAlaska as a result of a property swap.

Forward-Looking Statements

This news release contains certain forward-looking statements within the meaning of applicable securities laws. All statements that are not historical facts, including without limitation statements regarding future estimates, plans, programs, forecasts, projections, objectives, assumptions, expectations or beliefs of future performance, including statements regarding the suitability of the Properties for mining exploration, future payments, issuance of shares and work commitment funds, entry into of a definitive option agreement respecting the Properties, are "forward-looking statements." These forward-looking statements reflect the expectations or beliefs of the management of the Company based on information currently available to it. Forward-looking statements are subject to a number of risks and uncertainties, including those detailed from time to time in filings made by the Company with securities regulatory authorities, which may cause actual outcomes to differ materially from those discussed in the forward-looking statements. These factors should be considered carefully, and readers are cautioned not to place undue reliance on such forward-looking statements. The forward-looking statements and information contained in this news release are made as of the date hereof and the Company undertakes no obligation to update publicly or revise any forward-looking statements or information, whether as a result of new information, future events or otherwise, unless so required by applicable securities laws.

The TSX Venture Exchange and the Canadian Securities Exchange have not reviewed, approved or disapproved the contents of this press release, and do not accept responsibility for the adequacy or accuracy of this release.

F3 Uranium Corp.
750-1620 Dickson Avenue
Kelowna, BC V1Y9Y2

Contact Information
Investor Relations
Telephone: 778 484 8030
Email: ir@f3uranium.com

ON BEHALF OF THE BOARD
"Dev Randhawa"
Dev Randhawa, CEO

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/228040


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
F3 Uranium Corp.
Bergbau
A40KCK
CA30336Y1079
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.