• Montag, 22 Juli 2024
  • 17:44 Uhr Frankfurt
  • 16:44 Uhr London
  • 11:44 Uhr New York
  • 11:44 Uhr Toronto
  • 08:44 Uhr Vancouver
  • 01:44 Uhr Sydney

Aspire Mining Limited Confirms High Quality Coking Coal At Ovoot

06.04.2011  |  ABN Newswire
16:45 AEST Apr 6, 2011 ABN Newswire (C) 2004-2011 Asia Business News PL. All Rights Reserved.

Perth, Australia (ABN Newswire) - Aspire Mining Limited (ASX: AKM) (PINK: ASPXF) is pleased to announce that it has now received all outstanding raw coal sample analyses from its 2010 drilling programme. These results have confirmed the high quality of its coking coal resource at the Ovoot Coking Coal Project (Ovoot) in northern Mongolia.

Aspire will now incorporate the raw coal data into the Ovoot resource model for future mine planning and open pit optimisation.


High Quality Coal Confirmed

Under the ASTM coal ranking system, Ovoot coking coal is classified as High Volatile Bituminous - B.

Under the ISO coal classification standards, Ovoot coking coal is classified as Medium Rank B, high vitrinite, low ash, coking coal (washed 31.5 x 0 mm).

Under both classification systems, Ovoot coking coal has been confirmed as a high quality coking coal.

Infill Drilling Identifies Thick, Near-Surface Coal

Infill drilling commenced at the Ovoot Coking Coal Project in March 2011. Three holes have now been completed.

DH 246
- Upper Seam 35.6 metres of coal from 123.2 metres
- Lower Seam 9.8 metres of coal from 212.4 metres

DH 247
- Upper Seam 24.1 metres of coal from 83.5 metres
- Upper Seam 37.2 metres of coal from 114 metres
- Lower Seam 23.5 metres of coal from 219.5 metres

DH 248
- Upper Seam 22.8 metres of coal from 98.9 metres
- Lower Seam 9.4 metres of coal from 164.7 metres

All holes were cored through the coal seams to provide further samples for quality analysis.

It is expected that a small number of further infill holes will be required to confirm the most appropriate location for the starter pit for the Stage 1 DSO Project. This will enable the completion of a mine plan which will feed into the commenced DSO Scoping Study.


2011 Exploration Program

A second open hole drilling rig has now been mobilised to site. Aspire has also received an interpretation of two-dimensional seismic program undertaken over the winter.

The interpretation has provided a number of drilling targets, extending the resource area. It is expected these targets will be progressively tested over the coming months.

Two-dimensional seismic work continues to be performed over the Zuun Del Prospect on the eastern portion of the Ovoot licence area.

For the complete Aspire Mining announcement including tables and images, please view the following link:
http://www.abnnewswire.net/media/en/docs/536417.pdf


About Aspire Mining Limited :

Aspire Mining Limited (ASX: AKM) owns 100% of the Ovoot Coking Coal Project in northern Mongolia which, in 2010, announced a maiden 330 million tonne resource (93.3mt Measured, 182.4mt Indicated, and 55.0mt Inferred). Aspire is currently targeting resource upgrades at Ovoot, as well as progressing development of key infrastructure including access to rail.



Contact:

David Paull
Managing Director
Aspire Mining Limited
Tel: +61-8-9381-1995
Email: info@aspiremininglimited.com
http://www.aspiremininglimited.com
Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Aspire Mining Ltd.
Bergbau
A0PAZ1
AU000000AKM7

Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.