Wesdome Gold Mines Limited 2010 Year End Reserves and Resources Estimates Grow

02.02.2011  |  CNW
TORONTO, Feb. 2 /CNW/ - Wesdome Gold Mines Ltd. (WDO-TSX) is pleased to release updated mineral reserve and resources estimates for its 100% owned Eagle River, Kiena and Mishi gold mines as of December 31, 2010.


HIGHLIGHTS

- Proven and Probable reserves increased 70%, net of depletion to 319,000 ounces

- Measured and Indicated resources increased 365% to 629,000 ounces

President and CEO Donovan Pollitt, P.Eng., commented "We worked hard in 2010 to demonstrate the potential and long-life nature of our mines and are pleased to see our reserves and resources grow significantly. We will continue to develop growth projects such as Mishi and Dubuisson to leverage existing infrastructure capacity. As always, we continue to examine opportunities to repeat our success elsewhere."


RESERVES AND RESOURCES

RESERVES ESTIMATES* December 31, 2010
Mine Category Tonnes Grade
(gAu/tonne) Ounces
Eagle River Proven 88,400 11.0 31,000
Probable 256,600 16.5 136,000
Proven + Probable 345,000 15.0 167,000

Kiena Proven 534,000 2.9 50,000
Probable 563,000 2.7 49,000
Proven + Probable 1,097,000 2.8 99,000

Mishi Proven 174,000 2.7 14,000
Probable 535,000 2.5 39,000
Proven + Probable 709,000 2.6 53,000

Total 319,000


RESOURCES ESTIMATES* December 31, 2010
Mine 	Category 	Tonnes 	Grade
(gAu/tonne) Ounces
Eagle River Indicated 83,000 7.9 21,000
Inferred 331,000 6.6 70,000

Kiena Measured 409,000 3.6 47,000
Indicated 956,000 4.0 123,000
Measured + Indicated 1,365,000 3.9 170,000

Mishi Measured 281,000 2.5 22,000
Indicated 5,455,000 2.4 416,000
Measured + Indicated 5,736,000 2.4 438,000
Inferred 1,202,000 3.6 140,000

Total Measured + Indicated 629,000

* All Mineral Reserves and Mineral Resources estimates have been made in accordance with the Standards of the Canadian Institute of Mining, Metallurgy and Petroleum and National Instrument 43-101.

All Mineral Resources are in addition to Mineral Reserves except for the Mishi mine where Mineral Reserves are a subset of Mineral Resources.

Mineral Resources are not in the current mine plan and therefore do not have demonstrated economic viability.

As per section 4.2(ii) of National Instrument 43-101, the change in mineral reserves and resources for the Eagle River and Kiena mines does not constitute a material change in the affairs of the Company. For the Eagle River mine refer to the Technical Report filed on SEDAR, dated December, 2005, by Strathcona Mineral Services Ltd. For the Kiena mine refer to the Technical Report dated April 15, 2005, by Geologica Groupe Conseil, also filed on SEDAR.

The Mishi mine Mineral Resource estimates were completed by InnovExplo Inc. in a 43-101 Technical Report dated August 25, 2010, and filed on SEDAR. The Mishi Mineral Reserves estimates were compiled in a 43-101 Report by InnovExplo Inc. dated January 12, 2011, and also filed on SEDAR.

Qualified Persons for the Mineral Reserves and Mineral Resources estimates as per 43-101 are as follows:
- Eagle River: George N. Mannard, P.Geo., Vice President Exploration, W. Lucko, P.Geo., Senior Geologist, Eagle River mine
-Kiena: Ron Leber, P.Geo., Chief Mine Geologist, Kiena mine, Marc Ducharme, P.Geo., Chief Exploration Geologist, Kiena mine
- Mishi: Carl Pelletier, P.Geo., InnovExplo Inc., independent, Karine Brosseau, P.Eng., InnovExplo Inc., independent, Nathalie Gauthier, P.Eng., InnovExplo Inc., independent


The Company is a Producing Issuer as per national Instrument 43-101.


5-YEAR RESERVES - PRODUCTION RECONCILIATION
EAGLE RIVER MINE
Proven + Probable Reserves Estimates Actual Production
Date Tonnes Grade Ounces Date Tonnes Grade Ounces
Dec 31, 2005 217,000 11.3 7,800 2006 135,000 10.1 43,699
Dec 31, 2006 253,000 12.9 105,000 2007 76,676 13.1 32,299
Dec 31, 2007 265,000 10.8 92,000 2008 118,916 13.0 49,660
Dec 31, 2008 231,000 9.8 73,000 2009 132,004 14.3 60,754
Dec 31, 2009 400,000 8.6 110,000 2010 155,500 7.4 37,000
Dec 31, 2010 345,000 15.0 167,000
CUMULATIVE PRODUCTION: 618,196 11.2 223,412
KIENA MINE
Proven + Probable Reserves Estimates Actual Production
Date Tonnes Grade Ounces Date Tonnes Grade Ounces
Dec 31, 2005 - - - 2006 94,200 3.1 9,300
Dec 31, 2006 795,000 4.4 113,000 2007 284,757 3.9 35,404
Dec 31, 2007 534,700 4.5 76,900 2008 241,641 5.2 40,344
Dec 31, 2008 733,000 4.3 102,000 2009 302,034 3.6 35,398
Dec 31, 2009 600,000 4.1 78,000 2010 285,500 3.5 32,000
Dec 31, 2010 1,097,000 2.8 99,000
CUMULATIVE PRODUCTION: 1,208,132 3.9 152,446


At the Eagle River mine, proven and probable reserves in terms of contained ounces rose 50% net of depletion. More importantly, the quality of the reserves improved with the average diluted grade increasing to 15.0 gAu/tonne. A 35% dilution factor is employed at Eagle River. The higher average grades are weighted by some high grade ore outlined in the 811 zone between depths of 700 and 850 metres. This material will start being introduced into the mining sequence in 2012.

At Kiena, proven and probable reserves in terms of contained ounces increased 25% net of depletion. Significant additions came from the 388 and S50 zones. The grades at Kiena are lower and therefore gold prices will have to maintain current levels to ensure viability.

The Mishi mine looks very profitable at current gold prices. An eight month period of pre-stripping is required to reach sustainable mining over a 5-year life as currently planned. Work will systematically continue to evaluate potential scenarios to fully delineate and develop the much larger resource.

In 2011, we will continue to evaluate our existing assets for organic growth potential. 2010 demonstrated positive drill results and we aim for another busy year of drilling. Acquisition opportunities which fit our regional development strategy will continue to be examined with discipline.


ABOUT WESDOME

Wesdome is an established Canadian gold producer with wholly-owned mining and milling complexes located in Wawa, Ontario and Val d'Or, Québec. Wesdome has been producing gold continually for 20 years on an unhedged basis and to date has produced in excess of 1.2 million ounces. The Company has 101.2 million shares issued and outstanding and trades on the Toronto Stock Exchange under the symbol "WDO".



This news release contains "forward-looking information" which may include, but is not limited to, statements with respect to the future financial or operating performance of the Company and its projects. Often, but not always, forward-looking statements can be identified by the use of words such as "plans", "expects", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates", or "believes" or variations (including negative variations) of such words and phrases, or state that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved. Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. Forward-looking statements contained herein are made as of the date of this press release and the Company disclaims any obligation to update any forward-looking statements, whether as a result of new information, future events or results or otherwise. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. The Company undertakes no obligation to update forward-looking statements if circumstances, management's estimates or opinions should change, except as required by securities legislation. Accordingly, the reader is cautioned not to place undue reliance on forward-looking statements.



For further information:

Donovan Pollitt, P.Eng., CFA
President & CEO
416-360-3743 ext 25

8 King St. East, Suite 1305
Toronto, ON, M5C 1B5
Toll Free: 1-866-4-WDO-TSX
Phone: 416-360-3743, Fax: 416-360-7620
Email: invest@wesdome.com, Website: www.wesdome.com
Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Wesdome Gold Mines Ltd.
Bergbau
A0JC4E
CA95083R1001

Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.