• Mittwoch, 25 Dezember 2024
  • 16:58 Uhr Frankfurt
  • 15:58 Uhr London
  • 10:58 Uhr New York
  • 10:58 Uhr Toronto
  • 07:58 Uhr Vancouver
  • 02:58 Uhr Sydney

First Lithium Completes Drill Program at Mollie River

25.04.2011  |  Marketwire
VANCOUVER, BRITISH COLUMBIA -- (Marketwire) -- 04/25/11 -- First Lithium Resources Inc. (the 'Company') (TSX VENTURE: MCI) (PINK SHEETS: FLNTF) (FRANKFURT: MHN) announces the completion of their drill program at Mollie River. First Lithium returned to the property to assess the area beneath hole MR-10-10 for a wider zone of gold and associated copper mineralization. The hole was re-entered and deepened to 293 m and the 47 samples collected from this new drill core were assayed for gold, copper and nickel. Results are summarized in table form below.
----------------------------------------------------------------------------
Summary of Assay Results, Mollie River DDH MR-10-10 to 293 m.
----------------------------------------------------------------------------
(Cattarello Assayers, Rouyn-Noranda) Range in Au (g/t)
----------------------------------------------------------------------------
Method: 'FA-GEO' 0.005-0.055
----------------------------------------------------------------------------
(Cattarello Assayers, Timmins) Range in Cu (ppm) Range in Ni (ppm)
----------------------------------------------------------------------------
Method: 'AAT-7' 62-437 15-164
----------------------------------------------------------------------------

Results indicate that no significant gold intercept was discovered below the narrow 1.8 g/t intercept initially documented in drill hole MR-10-10 (see news release March 2, 2011). No further work is anticipated on these 2 claims. The Company will evaluate the merits of further exploring the 3rd, non-contiguous claim which lies 2 km to the west, toward Trelawney Mining and Exploration Inc.'s Chester Gold Complex.


ON BEHALF OF THE BOARD

Craig Naughty
President & CEO



This news release has been prepared on behalf of the First Lithium Resources Inc. Board of Directors, which accepts full responsibility for its contents. The contents of this release have been reviewed and approved by Mark Fedikow, a qualified person as defined by National Instrument 43-101.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.




Contacts:

First Lithium Resources Inc.
Craig Naughty, President & CEO
(604) 669-0401 OR Toll Free: (877) 669-0401

(604) 669-0414 (FAX)
info@firstlithiumresources.com
www.firstlithiumresources.com
Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Golden Virtue Resources Inc.
Bergbau
-
-
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.