• Samstag, 23 November 2024
  • 00:28 Uhr Frankfurt
  • 23:28 Uhr London
  • 18:28 Uhr New York
  • 18:28 Uhr Toronto
  • 15:28 Uhr Vancouver
  • 10:28 Uhr Sydney

Rio Alto Drills 173 Metres of 1.53 Grams of Gold Per Tonne

26.04.2011  |  Marketwire

VANCOUVER, BRITISH COLUMBIA -- (Marketwire) -- 04/26/11 -- Rio Alto Mining Limited ('Rio Alto' or the 'Company') (TSX VENTURE: RIO)(OTCQX: RIOAF)(BVLAC: RIO)(DBFrankfurt: MS2) is pleased to report assay results from 14 reverse circulation drill holes within and around the Calaorco Pit at the La Arena Gold Oxide Mine ('Oxide Mine') located in Peru.


Significant intercepts were:



Intercept Gold Grade
Hole (mts) (g/t)
------------------------------------------------------------
CA-R11-004 282 0.61
CA-R11-006 208 1.20
CA-R11-007 173 1.53


The objectives of the 2011 oxide drilling program at Calaorco are; (a) to move material in the resource model from inferred to indicated, (b) fill gaps in the resource model in and around the current Calaorco pit design, (c) test a new structural interpretation that has been developed by Rio Alto's geologists from the re-interpretation of previous core drilling; and (d) identify the mineral continuity below the current pit design. The current plan is to drill 11,700 m of RC holes comprising 41 holes, each of approximately 300 m in length. Mineralization above 0.2 grams per tonne gold cut-off was encountered in 13 of the 14 holes drilled to date. Based on the results of the first 14 RC holes, the Company has improved its knowledge of the geological model and is re-orienting the remaining holes in the current program.


The results of the first 3,755 m of drilling within the oxide breccia sandstone are outlined below:


Drill Results


References to 'Pit Location' in the following table refer to intercepts within ('Inside') the Calaorco Oxide Pit or drill hole intercepts that extended below ('Below') the Calaorco Oxide Pit. A map illustrating drill hole locations and selected drill hole cross sections related to this press release may be accessed by following this link: http://media3.marketwire.com/docs/RIO0426.pdf



Pit
Hole ID From To Length Au g/t Ag g/t Location
-----------------------------------------------------------------------

RC1 22 104 82 0.53 2.95 Inside
RC2 Below Cut Off Grade
RC3 20 50 30 0.72 0.65 Inside
-----------------------------------------------------------------------
RC4 16 298 282 0.61 0.41 Below
Including 54 88 34 2.89 1.69 Inside
-----------------------------------------------------------------------
RC5 66 216 150 0.29 0.33 Inside
-----------------------------------------------------------------------
RC6 6 214 208 1.20 0.35 Inside
Including 32 96 64 2.22 0.61 Inside
-----------------------------------------------------------------------
RC6 292 300 8 0.55 0.35 Below
-----------------------------------------------------------------------
RC7 74 247 173 1.53 0.27 Inside
Including 110 132 22 6.43 0.37 Inside
Including 112 118 6 13.28 0.63 Inside
-----------------------------------------------------------------------
RC8 0 24 24 0.81 0.28 Inside
RC8 126 230 104 0.27 0.27 Below
RC8 282 324 42 0.21 0.22 Below
Including 320 324 4 0.92 0.20 Below
-----------------------------------------------------------------------
RC9 138 200 62 0.45 0.29 Inside
RC9 270 306 36 3.38 0.32 Below
Including 278 302 24 4.92 0.34 Below
Including 290 294 4 21.19 0.45 Below
-----------------------------------------------------------------------
RC10 98 212 114 0.42 0.45 Inside
RC10 234 298 64 0.98 0.48 Below
Including 256 270 14 2.40 0.43 Below
-----------------------------------------------------------------------
RC11 112 184 72 0.25 0.29 Inside
RC11 232 306 74 0.33 0.21 Below
-----------------------------------------------------------------------
RC12 28 68 40 0.29 0.23 Inside
RC12 156 204 48 0.11 0.20 Inside
RC12 234 298 64 0.38 0.25 Below
-----------------------------------------------------------------------
RC13 0 48 48 0.95 1.10 Inside
RC13 66 190 124 0.30 0.28 Below
-----------------------------------------------------------------------
RC14 16 148 132 0.77 0.27 Inside


There are two RC drill rigs working at La Arena and a third RC drill rig is scheduled to arrive on site in June. Also in June, four diamond drill rigs are scheduled to arrive on site. In March, Rio Alto designed an exploration program for its La Arena Project that included 40,000m of RC drilling and 10,000m of core drilling. Based on the early positive results from the drill holes at Calaorco, the previously announced results from the San Andres RC drilling (see Rio Alto press release issued March 14, 2011) and surface sampling in an unexplored area to the north of the Calaorco Pit, the Company is in the process of revising its 2011 drilling and exploration program. Once a revised program has been approved the Company will provide an update.


Quality Control and Assurance


Sampling of the reverse circulation drilling and sample preparation were performed by Rio Alto personnel and were carried out under strict protocols recommended in the NI 43-101 Technical Report dated July 31, 2010 prepared by Coffey Mining Pty Ltd for the Company. Samples were taken every 2m and split in half to yield seven to ten kilogram samples. Drill sample recovery was generally in excess of 90 %. Rio Alto has a rigorous QA/QC program to control the chain-of-custody of samples and the insertion of blanks, duplicates, and certified reference standards in each batch of samples. Samples were shipped to CIMM-Peru in Lima where they were dried, crushed, pulverized, and assayed. All gold assays were obtained by standard 50g fire assaying with AA finish. All silver assays reported in the press release were obtained by Aqua-Regia dissolution followed by ICP measurement. CIMM-Peru is an ISO 9001:2000 certified laboratory.


Enrique Garay, M Sc. P. Geo. (AIG Member), Vice President Geology of Rio Alto is the Qualified Person responsible for the management of the exploration program and disclosure of the drill results as defined by National Instrument 43-101. Mr. Ian Dreyer, B.App.Sc (AUSIMM Member), of Coffey Mining Pty Ltd, a Qualified Person as defined by National Instrument 43-101, designed and reviewed the Quality Control and Assurance program carried out by the Company with respect to these drill results. Each of Mr. Garay and Mr. Dreyer has read and approved the scientific and technical information in this news release.


This news release contains certain forward-looking information including statements concerning the expected timing for the arrival of drills at La Arena and the announcement of a revised exploration program. All statements included herein, other than statements of historical fact, are forward-looking information and such information involves various risks and uncertainties. There can be no assurance that such information will prove to be accurate, and actual results and future events could differ materially from those anticipated in such information. A description of assumptions used to develop such forward-looking information and a description of risk factors that may cause actual results to differ materially from forward-looking information can be found in Rio Alto's disclosure documents on the SEDAR website at www.sedar.com. Rio Alto does not undertake to update any forward-looking information except in accordance with applicable securities laws.


To learn more about Rio Alto Mining Limited, please visit: www.rioaltomining.com or Rio Alto's SEDAR profile at www.sedar.com.


ON BEHALF OF THE BOARD OF RIO ALTO MINING LIMITED


Alex Black, President & COO


Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts the responsibility for the adequacy or accuracy of this release.

Contacts:

Rio Alto Mining Limited

Alex Black

President & COO

51 1 625 9900

51 99279 4655 (FAX)
alexb@rioaltomining.com


Rio Alto Mining Limited

Alejandra Gomez

Investor Relations

1 604 628 1401

1 866 393 4493 (FAX)
alejandrag@rioaltomining.com
www.rioaltomining.com



Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Rio Alto Mining Ltd.
Bergbau
-
-
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.