• Montag, 22 Juli 2024
  • 19:24 Uhr Frankfurt
  • 18:24 Uhr London
  • 13:24 Uhr New York
  • 13:24 Uhr Toronto
  • 10:24 Uhr Vancouver
  • 03:24 Uhr Sydney

Zinco Announces Signing of Drill Contract With Major Drilling for Continuation of Exploration Work on Its San Juan and Jesus Maria Prospects in the Cuale District, Jalisco VMS Project, Mexico

11.05.2011  |  Marketwire

SURREY, BC -- (Marketwire) -- 05/11/11 --




ZINCO MINING CORPORATION (TSXV - ZIM)
205 - 16055 Fraser Highway
Surrey, B.C. V4N 0G2\


Telephone (604) 507-2181
Fax: (604) 507-2187


May 10, 2011


Zinco Mining Corporation (TSX-V: ZIM, FRA: 61Z) is pleased to announce
that it
has signed a 1500 meter drill contract with Major Drilling de Mexico
S.A. de
C.V. to commence diamond core drilling on its mineral prospects in the
Cuale
volcanogenic massive sulfide (VMS) camp. The main objective of the
program is
to expand on significant reverse circulation drilling intercepts
from two
prospects, San Juan and Jesus Maria. From San Juan, Zinco's previous
intercepts
include:


I. ZIM9 with 85.7 meters of 185 g/t Ag, 1.5% Zn and 0.8% Pb,
II. ZIM3, collared 41 m east-northeast of ZIM9, with 108.1 meters of 58
g/t Ag, 1.4% Zn and 0.7% Pb.
III. ZIM1, collared 135 m north-northeast of ZIM9, with 14.3 meters of
127 g/t Ag, 2.9% Zn and 0.9% Pb.
IV. ZIM5, collared 215 m north-northeast of ZIM9, with 25.5 meters of
72 g/t Ag, 0.4% Zn and 0.2% Pb.

From Jesus Maria, the 2008 campaign returned results of:
I. ZIM30 with 41.82 meters of 5% Zn, 1.4% Pb, 0.2% Cu and 14 g/t Ag,
II. ZIM19, collared 170 meters southwest of ZIM30, with 17.34 meters of
4.2% Zn, 1.6% Pb, 0.1% Cu and 5 g/t Ag,
III. ZIM16, collared 40 meters southwest of ZIM30, with 17.34 meters of
4.9% Zn, 0.1% Pb, 0.2% Cu and 5 g/t Ag.


Plan maps and cross-sections of these results are on Zinco's
website at
http://www.zincomining.com/s/Mineralization.asp.


The two areas of interest are characterized by multiple intersections of
VMS-
style mineralization and have grades of economic interest, with zinc and
silver
dominating the polymetallic assemblage. Diamond drilling is being
initiated at
both sites to test for physical continuity of the mineralization
identified by
the earlier reverse circulation drilling program. The company has been
active in
camp preparation and drill pad preparation in anticipation of diamond
drilling
commencing in the near future.


Qualified Person


This press release was reviewed by Michelle Robinson, M.A.Sc.,
P.Eng., a
Director of Zinco Mining Corporation, who acts as Zinco's qualified
person as
defined by NI 43-101. Details regarding sampling and assaying are
appended to
Zinco's News Release dated 21 February 2011.



Further information about the Jalisco VMS Project can be reviewed on
Zinco's
website www.zincomining.com


ON BEHALF OF THE BOARD,


David Elgee,


PRESIDENT


Certain information regarding the Company including management's
assessment of
future plans and operations, may constitute forward-looking statements
under
applicable securities laws and necessarily involve risks associated with
mining
exploration and development, volatility of prices, currency
fluctuations,
imprecision of resource estimates, environmental and permitting risks,
access to
labour and services, competition from other companies and ability to
access
sufficient capital. As a consequence, actual results may differ materially
from
those anticipated in the forward-looking statements.


NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS
THAT
TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE)
ACCEPTS
RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS NEWS RELEASE.








This announcement is distributed by Thomson Reuters on behalf of
Thomson Reuters clients. The owner of this announcement warrants that:


(i) the releases contained herein are protected by copyright and
other applicable laws; and


(ii) they are solely responsible for the content, accuracy and
originality of the information contained therein.


Source: Zinco Mining Corporation via Thomson Reuters ONE


[HUG#1514408]

Zinco Mining Corporation:

Telephone (604) 507-2181

Fax: (604) 507-2187



Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Zinco Mining Corp.
Bergbau
-
-

Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.