• Freitag, 22 November 2024
  • 16:07 Uhr Frankfurt
  • 15:07 Uhr London
  • 10:07 Uhr New York
  • 10:07 Uhr Toronto
  • 07:07 Uhr Vancouver
  • 02:07 Uhr Sydney

Abcourt Mines Inc.: Additional Excellent Drilling Results Obtained at the Eastern End of Elder Mine and a New Mineralized Zone Discovered 165 Meters Below the Main Zone

16.05.2011  |  Marketwire

MONT-ST-HILAIRE, QUEBEC, CANADA -- (Marketwire) -- 05/16/11 -- Mr. Renaud Hinse, President and C.E.O. of Abcourt Mines Inc. (TSX VENTURE: ABI)(BERLIN: ABI)(FRANKFURT: ABI) (the 'Company'), is pleased to report that additional excellent results were obtained at the eastern end of the Elder mine located 10 km north-west from the town of Rouyn-Noranda. The mineralization remains open to the east, to the north and at depth.


DRILLING RESULTS AT EASTERN END OF ELDER MINE



----------------------------------------------------------------
HOLE SECTION FROM TO LENGTH GOLD
NO. METERS METERS METERS GRAM/TONNE
----------------------------------------------------------------
E10-44 5850E 199.10 200.60 1.50 6.85
----------------------------------------------------------------
E10-45 5700E 155.00 156.60 1.60 10.21
169.30 170.50 1.20 3.40
----------------------------------------------------------------
E10-46 5600E 141.00 142.80 1.80 3.18
----------------------------------------------------------------
E10-47 5700E 164.50 165.20 0.70 4.92
----------------------------------------------------------------
E10-57 5500E 40.80 42.30 1.50 3.32
----------------------------------------------------------------


The length of intersections is approximately equal to true widths.


All assays were done by Techni-Lab S.G.B. Abitibi Inc., an approved laboratory.


NEW MINERALIZED ZONE DISCOVERED AT DEPTH.


Three of the holes drilled at the eastern end of the Elder mine were deepened and they intersected a new mineralized structure, 165 meters below the main zone. The rock types and alteration are identical to the main zone and it carries some gold. The best values were obtained in hole E11-56 with 3.2 meters grading 1.07 gram of gold per tonne. Additional holes will be drilled to locate an area of enrichment.


'Our goal is always to build significantly on the 2009 NI-43-101 resource estimate for the Elder Property and we're very confident that with the drilling that we are doing and the discovery of a new zone, we're going to succeed', stated Renaud Hinse, President and CEO. 'We're gaining a much better understanding of the entire structural model for Elder and this is aiding us immensely as our aggressive drill campaign continues. We're also very excited with the potential of the Tagami property, immediately to the north where much more drilling will be taking place. We are strongly focused on re-opening the Elder mine as quickly and efficiently as possible'.


From 1944 to 1964, the Elder mine produced 350,000 ounces of gold.


In July 2009, a revision of the resources for the Elder property was completed by an independent qualified person, Mr Jean-Pierre Berube, P. Eng., consultant from Trois-Rivieres, Quebec. This revision was made according to NI 43-101 standards.


Below is a summary of the non-diluted resources:



Cut-off grade 3.8 grams/tonne 5.1 grams/tonne

Description Tonnes Au gr/t Ounces Tonnes Au gr/t Ounces
Measured 402,286 6.5 83 635 256,379 7.7 63,736
Indicated 402,742 6.6 85 502 287,296 7.7 71,422
------------------------------------------------------
Maesured &
indicated 805,028 6.5 169 137 543,675 7.7 135,158
Inferred 237,289 6.1 46 722 159,704 7.2 37,067


Meanwhile, a major drill program continues at Abcourt-Barvue Silver-Zinc Property near Val-d'Or, (more results pending). Drilling there is designed to upgrade and augment existing NI 43-101 all category reserves and resources.


About Abcourt Mines Inc.


Abcourt Mines Inc. is an exploration and development company with strategically located properties in northwestern Quebec, Canada. The Elder Mine with 43-101 gold resources, the Abcourt-Barvue Project with 43-101 silver-zinc ore reserves and resources and the Aldermac property with historical copper-zinc resources are all former producers. Abcourt is now focused on bringing the Elder and Abcourt-Barvue projects back into production with Elder as the first priority. At the same time the company is working on other projects (Aldermac, Jonpol and Vendome) to increase its mineral resources inventory. A 43-101 resource calculation was completed in July, 2009, for the Elder Mine. A positive 43-101 feasibility study was completed by GENIVAR in 2007 on the Abcourt-Barvue Project. In addition, mill equipment was purchased. To know more about Abcourt, please visit our web site at www.abcourt.com.


FORWARD-LOOKING STATEMENTS: Certain of the information contained in this news release may contain 'forward-looking information'. Forward-looking information and statements may include, among others, statements regarding the future plans, costs, objectives or performance of Abcourt Mines Inc. (the 'Company'), or the assumptions underlying any of the foregoing. In this news release, words such as 'may', 'would', 'could', 'will', 'likely', 'believe', 'expect', 'anticipate', 'intend', 'plan', 'estimate' and similar words and the negative form thereof are used to identify forward-looking statements. Forward-looking statements should not be read as guarantees of future performance or results, and will not necessarily be accurate indications of whether, or the times at or by which, such future performance will be achieved. Forward-looking statements and information are based on information available at the time and/or management's good-faith belief with respect to future events and are subject to known or unknown risks, uncertainties, assumptions and other unpredictable factors, many of which are beyond the Company's control. These risks, uncertainties and assumptions include, but are not limited to, those described under 'Risk Factors' in the Company's amended and restated annual information form dated November 26, 2010 and could cause actual events or results to differ materially from those projected in any forward-looking statements. The Company does not intend, nor does the Company undertake any obligation, to update or revise any forward-looking information or statements contained in this news release to reflect subsequent information, events or circumstances or otherwise, except if required by applicable laws.


This press release was prepared by Mr. Renaud Hinse, a qualified person, President of Abcourt Mines Inc.


Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Contacts:

Renaud Hinse

President and Chief Executive Officer

819 768-2857 / 450 446-5511

819 768-5475 / 450 446-3550 (FAX)
rhinse@abcourt.com



Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Abcourt Mines Inc.
Bergbau
862198
CA00288E3005
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.