Hana Mining Ltd.: Infill Drilling Continues to Encounter Thick Intersections of Copper-Silver Mineralization Along the North Limb of the Banana Zone

30.05.2011  |  Marketwire

VANCOUVER, BRITISH COLUMBIA -- (Marketwire) -- 05/30/11 -- Hana Mining Ltd. ('Hana' or the 'Company') (TSX VENTURE: HMG)(FRANKFURT: 4LH) is pleased to announce its most recent drilling results from the completion of 27 infill diamond drill holes in the Banana Zone at its Ghanzi sediment hosted Copper-Silver Project in Botswana.


Infill drilling was carried out on the North Limb area (between sections 63925 to 65750 at North Limb North; Figures 1 and 2) to convert a substantial amount of the NI 43-101 compliant resources within this area into the Indicated category from the Inferred category.


These results are from new holes and are in addition to those used in the most recent NI 43-101 compliant Inferred mineral resource calculation (see Table 1 at the end of this press release for the results from all 27 drill holes). The mineralization remains open at depth.


Highlights of Recent Drilling Results:



-- Drilling is progressing as scheduled. Total drilling to date is
approximately 12,297 metres (core and reverse circulation).
-- These latest results confirm the continuity of copper-silver
mineralization along the North Limb of the Banana Zone.
-- Intercepts of 0.56% Cu and 11.0 g/t Ag over 27.9 metres (including 3.49%
Cu and 69.0 g/t Ag over 1.5 metres) in hole HA-265-D, 0.47% Cu and 3.0
g/t Ag over 27.6 metres (including 1.24% Cu and 7.0 g/t Ag over 7.9
metres) in hole HA-273-D, 0.61% Cu and 11.0 g/t Ag over 16.8 metres
(including 1.02% Cu and 21.0 g/t Ag over 8.6 metres) in hole HA-267-D
and 0.54% Cu and 9.0 g/t Ag over 21.4 metres (including 0.89% Cu and
13.0 g/t Ag over 8.5 metres) in hole HA-260-D.


Discussion of Results:


The infill drilling program at North Limb North has confirmed that copper-silver mineralization is continuous and has consistent widths and in some sections it bifurcates into two high-grade zones within a very wide, lower grade, mineralized envelope (Figure 3). This drilling will allow for the conversion more mineral resources from the Inferred category into the Indicated category.


To view the three images associated with this release, please click the following link: http://media3.marketwire.com/docs/530hmgmaps.pdf.


Development Update:


The following engineering and consultation activities are ongoing:



-- Drilling is continuing at the Banana Zone (five core drills) with
another drill expected to be mobilized to site within the next couple of
weeks.
-- The Terms of Reference ('ToR') meeting was held recently with the
Botswana Department of Environmental Affairs. The ToR will dictate the
parameters of the Environmental Impact Assessment.


Hana Mining's CEO and Chairman, Marek Kreczmer, Commented as Follows:


'The infill drilling program continues to show that copper-silver mineralization at the Banana Zone is thick and has good continuity. We continue to be pleased with the results from the infill drilling program at the Banana Zone which will allow for the conversion of a substantial amount of Inferred Resources into the Indicated category.'


Qualified Person and Quality Assurance/Quality Control:


The drilling program and results are reviewed and approved by Fred Stahlbush, VP Engineering for Hana. He is the qualified person as defined in NI 43-101 and has reviewed the technical information in this press release.


Drill core is logged and photographed. Mineralized intervals are split in half by sawing and sampled at site. The remainder of the core is kept as a permanent record. Samples are placed into labelled bags, closed and packed into sealed bags that are shipped to ALS Chemex Laboratory in Johannesburg, South Africa. Hana has implemented an industry-standard QA/QC program that includes the blind insertion of certified standards, duplicates and blanks into the sample stream.


About Hana Mining's Ghanzi Copper-Silver Project in Botswana:


The Ghanzi Project is located in the center of the Kalahari Copper Belt in northwestern Botswana. The Ghanzi property covers 2,149 square kilometres, and contains sediment-hosted copper-silver deposits with a demonstrated cumulative tested strike length of 70 kilometres. This favorable geology extends over an estimated strike length of 600 kilometres. Hana Mining released results of its most recent NI 43-101 compliant resource estimate for the Ghanzi Project on December 20, 2010, announcing an Indicated mineral resource of 762 million pounds of copper and 16 million ounces of silver from 37.4 million tonnes at a grade of 0.93% copper and 13.4 g/t silver. All of the Indicated resources are from the Banana Zone. There are also Inferred resources of 5.6 billion pounds of copper and 85.4 million ounces of silver from 423.9 million tonnes. This Inferred mineral resource estimate consists of 225.4 million tonnes grading 0.64% Cu and 8.1 g/t Ag in the Banana Zone, 20.7 million tonnes grading 1.23% Cu and 8.7 g/t Ag in Zone 5, 16.7 million tonnes grading 0.86% Cu and 4.0 g/t Ag in Zone 6, and 161.1 million tonnes grading 0.45% Cu and 3.6 g/t Ag in the Chalcocite Zone; all at a cut-off grade of 0.30% Cu.


The Banana Zone exhibits certain areas of higher grade Cu and Ag mineralization, particularly between sections 49700 to 52000 on the North limb and sections 63000 to 71000 on both the North and South limbs, which represent an opportunity to locate starter pits and mine initial tonnages at higher than average grades. These higher grade pockets tend to be well within open pit depth parameters and represent opportunities to improve early cash flow and overall returns in development.


The project will benefit from proposed rail and power infrastructure expansions, along with proximity to local population centers and workforce. A feasibility study is currently underway (funded by the World Bank and the governments of Botswana and Namibia) to support completion of a rail line link that would connect Botswana with the Namibian port of Walvis Bay, on the Atlantic coast. The closest existing railhead to port is at Gobabis, in Namibia, approximately 550 km from our property. Construction has begun on the 600MW expansion of the government-owned Moropule Power Plant, having secured US$825 million project funding in May 2009. The Ghanzi Copper-Silver Project is currently accessed by the paved Trans-Kalahari highway, which passes within 15 km of the property.


The Ghanzi property is one of Africa's premier future copper-silver resources.



Table 1: Drill Results from North Limb, Banana Zone, Sections 63925 to
65750 - Interval indicates down hole interval

Hole # Section Mineralized Zone From To Interval Cu Ag
(m) (m) (m) (%) (g/t)
--------------------------------------------------------------------------
HA-257-D NL63925 North Limb North 91.00 116.00 25.00 0.43 12.0
includes 103.00 108.00 5.00 1.51 42.0
includes 106.00 108.00 2.00 2.97 81.0
--------------------------------------------------------------------------
HA-258-D NL63925 North Limb North 136.47 147.80 11.33 0.36 8.0
includes 136.47 146.38 9.91 0.40 9.0
HA-258-D 154.00 157.88 3.88 0.54 14.0
includes 156.00 157.00 1.00 1.35 34.0
--------------------------------------------------------------------------
HA-259-D NL63925 North Limb North 53.00 70.00 17.00 0.29 4.0
includes 62.00 67.00 5.00 0.64 7.0
--------------------------------------------------------------------------
HA-260-D NL64775 North Limb North 83.70 105.10 21.40 0.54 9.0
includes 84.50 93.00 8.50 0.89 13.0
includes 102.00 103.00 1.00 1.06 26.0
--------------------------------------------------------------------------
HA-261-D NL64675 North Limb North 25.00 44.00 19.00 0.47 4.0
includes 29.00 33.00 4.00 1.78 10.0
includes 29.00 31.82 2.82 2.30 7.0
--------------------------------------------------------------------------
HA-262-D N64875 North Limb North 27.00 48.00 21.00 0.31 3.0
includes 35.24 38.15 2.91 1.46 11.0
includes 35.24 37.28 2.04 1.70 8.0
--------------------------------------------------------------------------
HA-263-D NL64675 North Limb North 48.00 73.00 25.00 0.45 7.0
includes 51.40 56.00 4.60 0.81 4.0
includes 53.00 54.00 1.00 1.18 5.0
includes 69.02 72.00 2.98 1.11 30.0
includes 70.50 71.10 0.60 3.75 101.0
--------------------------------------------------------------------------
HA-264-D NL64875 North Limb North 65.25 90.50 25.25 0.31 5.0
includes 65.68 67.45 1.77 0.63 3.0
includes 79.61 82.00 2.39 1.06 21.0
includes 79.61 81.37 1.76 1.11 22.0
--------------------------------------------------------------------------
HA-265-D N64675 North Limb North 100.47 128.36 27.89 0.56 11.0
includes 100.47 120.00 19.53 0.72 14.0
includes 101.00 102.50 1.50 1.09 4.0
includes 106.50 106.75 0.25 4.42 87.0
includes 111.89 112.14 0.25 1.45 32.0
includes 116.67 118.20 1.53 3.49 69.0
----------------------------------------------------------------------------
HA-266-D N65075 North Limb North 28.00 49.00 21.00 0.31 3.0
includes 38.30 42.00 3.70 0.79 11.0
----------------------------------------------------------------------------
HA-267-D N65075 North Limb North 63.84 80.65 16.81 0.61 11.0
includes 71.41 80.04 8.63 1.02 21.0
includes 71.41 72.00 0.59 3.81 87.0
includes 74.20 74.46 0.26 2.20 52.0
includes 77.68 78.40 0.72 2.86 54.0
----------------------------------------------------------------------------
HA-268-D N65175 North Limb North 34.00 59.00 25.00 0.37 4.0
includes 42.83 47.27 4.44 1.47 14.0
includes 42.83 46.25 3.42 1.66 13.0
----------------------------------------------------------------------------
HA-269-D NL65275 North Limb North 64.00 80.70 16.70 0.31 5.0
includes 76.96 78.78 1.82 1.76 35.0
----------------------------------------------------------------------------
HA-270-D NL65075 North Limb North 104.65 129.28 24.63 0.52 11.0
includes 110.92 111.37 0.45 2.85 47.0
includes 116.92 118.47 1.55 2.23 44.0
includes 117.54 118.47 0.93 3.13 62.0
includes 127.97 129.28 1.31 3.77 96.0
----------------------------------------------------------------------------
HA-271-D N64875 North Limb North 113.23 136.00 22.77 0.55 8.0
includes 113.80 129.35 15.55 0.73 11.0
includes 113.80 116.00 2.20 1.27 4.0
includes 121.38 121.63 0.25 6.91 98.0
includes 125.87 129.35 3.48 1.30 26.0
----------------------------------------------------------------------------
HA-272-D N65275 North Limb North 111.70 136.47 24.77 0.23 3.0
includes 118.24 121.85 3.61 0.86 13.0
includes 119.98 121.85 1.87 1.15 19.0
----------------------------------------------------------------------------
HA-273-D N65475 North Limb North 23.00 50.60 27.60 0.47 3.0
includes 33.20 41.12 7.92 1.24 7.0
includes 33.80 36.72 2.92 2.57 8.0
includes 40.82 41.12 0.30 1.20 2.0
--------------------------------------------------------------------------
HA-274-D N65575 North Limb North 82.00 105.00 23.00 0.18 4.0
includes 97.17 99.88 2.71 0.53 12.0
--------------------------------------------------------------------------
HA-275-D N65275 North Limb North 151.90 153.50 1.60 0.40 2.0
HA-275-D 160.41 172.00 11.59 0.41 7.0
includes 160.41 162.80 2.39 1.51 26.0
includes 161.30 162.80 1.50 1.99 40.0
--------------------------------------------------------------------------
HA-276-D N65475 North Limb North 72.00 91.00 19.00 0.41 7.0
includes 76.17 79.30 3.13 1.76 37.0
includes 77.91 79.30 1.39 2.94 63.0
--------------------------------------------------------------------------
HA-277-D N65475 North Limb North 104.48 132.00 27.52 0.21 3.0
includes 118.55 124.00 5.45 0.57 11.0
includes 118.55 118.97 0.42 1.65 27.0
includes 120.15 120.72 0.57 1.65 32.0
--------------------------------------------------------------------------
HA-278-D NL65750 North Limb North 72.60 90.50 17.90 0.72 14.0
includes 72.60 74.32 1.72 1.57 10.0
includes 80.00 80.27 0.27 1.06 26.0
includes 82.47 87.50 5.03 1.20 29.0
--------------------------------------------------------------------------
HA-279-D NL65275 North Limb North 38.90 63.00 24.10 0.33 3.0
includes 50.20 53.91 3.71 1.01 10.0
includes 52.15 53.91 1.76 1.67 19.0
--------------------------------------------------------------------------
HA-280-D N65675 North Limb North 20.00 43.62 23.62 0.37 3.0
includes 28.79 31.50 2.71 1.51 6.0
includes 28.79 30.74 1.95 1.89 8.0
includes 42.79 43.20 0.41 1.87 8.0
--------------------------------------------------------------------------
HA-281-D NL65675 North Limb North 60.06 83.00 22.94 0.36 6.0
includes 70.00 82.00 12.00 0.59 11.0
includes 73.00 73.74 0.74 2.04 43.0
includes 73.00 75.10 2.10 1.17 24.0
includes 78.72 79.10 0.38 1.77 42.0
includes 81.00 82.00 1.00 1.22 25.0
--------------------------------------------------------------------------
HA-282-D NL65375 North Limb North 38.57 60.05 21.48 0.54 7.0
includes 51.63 58.00 6.37 1.24 20.0
includes 52.28 55.23 2.95 2.29 38.0
--------------------------------------------------------------------------
HA-286-D NL65675 North Limb North 116.70 130.00 13.30 0.28 4.0
includes 116.70 121.47 4.77 0.58 10.0
includes 118.92 119.32 0.40 2.63 56.0
--------------------------------------------------------------------------


Statements in this press release, other than purely historical information, including statements relating to the Company's future plans and objectives or expected results, may include forward-looking statements. Forward-looking statements are based on numerous assumptions and are subject to all of the risks and uncertainties inherent in resource exploration and development. As a result, actual results may vary materially from those described in the forward-looking statements.


The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.

Contacts:

Hana Mining Ltd.

Marek Kreczmer

Chief Executive Officer

(604) 676-0824

(778) 370-0146 (FAX)
info@hanamining.com


Hana Mining Ltd.

Patrick Donnelly

VP Corporate Development

(604) 676-0824

(778) 370-0146 (FAX)
patrick@hanamining.com
www.hanamining.com



Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Hana Mining Ltd.
Bergbau
-
-

Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.