• Freitag, 22 November 2024
  • 20:18 Uhr Frankfurt
  • 19:18 Uhr London
  • 14:18 Uhr New York
  • 14:18 Uhr Toronto
  • 11:18 Uhr Vancouver
  • 06:18 Uhr Sydney

Trade Winds Intersects 4.37 g/t gold over 15 metres on Block A

09.06.2011  |  Business Wire
  • 4.37 g/t Au over 15.0 m and 1.86 g/t Au over 9.0 m in Hanging Wall
  • 1.89 g/t Au over 7.6 m and 1.24 g/t Au over 7.0 m in M Zone
  • 1.44 g/t Au over 10.0 m and 1.02 g/t Au over 15.0 m in Foot Wall
  • Exceptional gold intercepts of 127.0 g/t over 0.3 m and 53.1 g/t
    over 1.0 m in hanging wall, 46.5 g/t over 1.0 m in M Zone and 113.0
    g/t over 1.0 m in footwall


Trade Winds Ventures Inc. (TSX-V: TWD, FSE: TVR) is pleased to announce
additional drilling results on the Block A Joint Venture project (50%
Trade Winds / 50% Detour Gold), located adjacent to Detour Gold′s Detour
Lake gold project in northeastern Ontario. The 2011 drilling program of
69 drill holes totalling 29,756.5 metres was completed on May 2, 2011.
Trade Winds is the operator of the Joint Venture exploration program.


Shown below are the significant mineralized (uncut) sections intersected
in the 9 diamond drill holes (TWDDH282A to TWDDH290), all infill drill
holes located within the pit shell on Block A.


  

  

Hanging Wall Zone


  

TWDDH-284

TWDDH-285

TWDDH-286


4.37 g/t Au over 15.0 m

1.34 g/t Au over 5.0 m

27.83 g/t Au over 2.5 m

  

TWDDH-289

TWDDH-290

TWDDH-290


0.99 g/t Au over 6.0 m

1.02 g/t Au over 4.0 m

1.86 g/t Au over 9.0 m

  

M Zone


  

TWDDH-283

TWDDH-286

TWDDH-287


0.85 g/t Au over 9.0 m

1.24 g/t Au over 7.0 m

1.89 g/t Au over 7.6 m

  

TWDDH-288

TWDDH-289

TWDDH-290


1.19 g/t Au over 5.0 m

10.23 g/t Au over 5.2 m

1.6 g/t Au over 5.0 m

  

Foot Wall Zone


  

TWDDH-283

TWDDH-284

TWDDH-285


2.74 g/t Au over 3.0 m

2.96 g/t Au over 4.0 m

1.02 Au g/t over 15.0 m

  

TWDDH-286

TWDDH-287

TWDDH-290


0.95 g/t Au over 4.3 m

1.80 g/t Au over 4.0 m

1.44 Au g/t over 10.0 m

1.72 Au g/t over 5.0 m


Additional results are listed below in the press release.


The winter 2011 drill program began on January 5th, 2011 was
completed on May 2nd, 2011 with 72 diamond drill holes
completed (including 3 abandoned drill holes) with a total of 29,756.5
metres drilled. One planned drill hole was not completed due to ground
conditions. Core logging has been completed and the core sampling is to
be completed by the end of June.


Similar to the 2010 program, the 2011 program sought to address more
than one objective: infill drilling, particularly large gap areas, and
exploration drilling. One of the recommendations of the 2009 NI 43-101
report by Watts Griffis and McOuat (WGM) was the infill drilling of
numerous drilling gaps, also termed data gaps, within the pit shell area
to increase the confidence level of the mineral resources. On Block A,
drill spacing of closer than 80 metres is required for the category of
inferred resources and closer than 40 metres for indicated resources.
The 2010 and 2011 winter program targeted regions with spacing greater
than 80 metres within the pit area.  A total of 53 drill holes,
approximately 76% of the winter 2011 drill program, were drilled on 40
metre by 40 metre centres to increase the confidence level of the
mineral resources.  All nine drill holes are part of the infill drilling
area of Block A.


Ian Lambert, CEO of Trade Winds, commented 'Our 2011 winter drill
program has been successful, with the total metres being drilled within
the scheduled time frame. We are continuing to process and sample
drilled core as planned, and are very pleased with the results announced
to date. The first twenty three of sixty nine drill holes within the
infill zone of the pit shell contain numerous intercepts of above
pit-grade mineralization, and will add confidence to the updated Block
Model and resource calculation to be undertaken at the end of this
year′s program.?

Current Results from Block A ? Winter 2011 Drill Program:

Drill Hole
  
Zone
  
From
  
To
  
Length
  
Grade
  
Single or
metresmetresmetresg/t AuComposite
uncutSample

TWDDH282A

Hanging Wall

24.0

25.0

1.0

4.13

S

TWDDH282A

Hanging Wall

42.6

44.0

1.4

1.14

S

TWDDH282A

Hanging Wall

137.0

137.6

0.6

4.86

S

TWDDH282A

Hanging Wall

172.8

174.0

1.2

1.45

S

TWDDH282A

Hanging Wall

216.5

217.2

0.7

1.30

S

TWDDH282A

Hanging Wall

280.0

281.0

1.0

1.74

S

TWDDH282A

Foot Wall

330.0

331.0

1.0

1.26

S

TWDDH282A

Foot Wall

353.0

354.0

1.0

1.02

S

TWDDH282A

Foot Wall

365.0

366.0

1.0

1.56

S

  

TWDDH283

Hanging Wall

15.0

17.0

2.0

1.23

C

TWDDH283

M Zone

49.0

58.0

9.0

0.85

C

including

50.0

50.5

0.5

4.18

S

TWDDH283

M Zone

61.0

63.0

2.0

3.83

C

including

62.0

63.0

1.0

7.10

S

TWDDH283

M Zone

72.0

75.0

3.0

2.74

C

including

74.0

75.0

1.0

7.76

S

TWDDH283

M Zone

80.0

82.0

2.0

0.99

C

TWDDH283

Foot Wall

106.0

107.0

1.0

1.85

S

  

TWDDH284

Hanging Wall

67.0

68.0

1.0

1.37

S

TWDDH284

Hanging Wall

86.0

87.0

1.0

1.14

S

TWDDH284

Hanging Wall

135.0

136.0

1.0

1.64

S

TWDDH284

Hanging Wall

140.0

155.0

15.0

4.37

C

including

149.7

150.0

0.3

127.00

S

TWDDH284

M Zone

159.0

162.0

3.0

1.56

C

TWDDH284

M Zone

193.0

193.3

0.3

5.81

S

  
Drill HoleZoneFromToLengthGradeSingle or
metresmetresmetresg/t AuComposite
uncutSample

TWDDH284

Foot Wall

279.0

280.0

1.0

0.98

S

TWDDH284

Foot Wall

285.0

286.0

1.0

0.98

S

TWDDH284

Foot Wall

299.0

302.0

3.0

0.62

C

TWDDH284

Foot Wall

324.0

328.0

4.0

2.96

C

TWDDH284

Foot Wall

359.0

360.0

1.0

1.95

S

TWDDH284

Foot Wall

377.0

378.0

1.0

1.58

S

TWDDH284

Foot Wall

395.0

395.6

0.6

0.94

S

  

TWDDH285

Hanging Wall

32.0

37.0

5.0

1.34

C

TWDDH286

Foot Wall

37.6

38.0

0.4

1.38

S

TWDDH285

Hanging Wall

42.0

43.0

1.0

4.39

S

TWDDH285

Hanging Wall

61.0

63.0

2.0

2.35

C

including

61.0

61.3

0.3

12.40

S

TWDDH285

M Zone

108.0

109.0

1.0

1.19

S

TWDDH285

Foot Wall

139.0

154.0

15.0

1.02

C

including

153.1

154.0

0.9

5.48

S

TWDDH285

Foot Wall

176.7

180.0

3.3

0.77

C

TWDDH285

Foot Wall

186.0

187.0

1.0

1.55

S

TWDDH285

Foot Wall

217.0

219.0

2.0

0.93

C

TWDDH285

Foot Wall

235.0

236.6

1.6

0.98

C

TWDDH285

Foot Wall

307.0

308.0

1.0

5.17

S

TWDDH285

Foot Wall

371.0

372.0

1.0

1.24

S

TWDDH285

Foot Wall

376.0

377.0

1.0

7.59

S

TWDDH285

Foot Wall

383.0

384.0

1.0

1.62

S

  

TWDDH286

Hanging Wall

60.5

63.0

2.5

27.83

C

including

61.0

62.0

1.0

53.10

S

TWDDH286

Hanging Wall

66.0

68.0

2.0

0.84

C

TWDDH286

Hanging Wall

71.0

72.0

1.0

5.62

S

TWDDH286

M Zone

110.0

117.0

7.0

1.24

C

TWDDH286

Foot Wall

161.0

161.7

0.7

5.47

S

TWDDH286

Foot Wall

164.0

166.2

2.2

0.92

C

TWDDH286

Foot Wall

170.0

172.0

2.0

1.33

C

TWDDH286

Foot Wall

174.0

175.0

1.0

2.07

S

TWDDH286

Foot Wall

227.8

232.0

4.3

0.95

C

TWDDH286

Foot Wall

256.0

256.7

0.7

4.62

S

TWDDH286

Foot Wall

319.0

320.0

1.0

7.13

S

TWDDH286

Foot Wall

381.0

382.0

1.0

5.76

S

TWDDH286

Foot Wall

389.0

390.0

1.0

4.56

S

  

TWDDH287

Hanging Wall

42.0

43.0

1.0

0.91

S

TWDDH287

Hanging Wall

182.0

183.0

1.0

1.13

S

TWDDH287

Hanging Wall

202.0

205.0

3.0

1.24

C

TWDDH287

Hanging Wall

214.0

218.0

1.0

0.78

S

TWDDH287

Hanging Wall

319.0

320.0

1.0

17.00

S

TWDDH287

M Zone

345.4

353.0

7.6

1.89

C

including

351.0

352.0

1.0

5.03

S

  
Drill HoleZoneFromToLengthGradeSingle or
metresmetresmetresg/t AuComposite
uncutSample

TWDDH287

Foot Wall

361.0

364.0

3.0

4.64

C

including

361.0

362.0

1.0

10.30

S

TWDDH287

Foot Wall

370.5

372.9

2.4

2.62

C

TWDDH287

Foot Wall

389.0

392.4

3.4

0.83

C

TWDDH287

Foot Wall

412.0

416.0

4.0

1.80

C

including

412.0

413.0

1.0

6.18

S

TWDDH287

Foot Wall

423.0

424.0

1.0

12.00

S

  

TWDDH288

Hanging Wall

27.0

28.0

1.0

1.64

S

TWDDH288

Hanging Wall

40.0

41.0

1.0

1.00

S

TWDDH288

Hanging Wall

86.0

87.0

1.0

2.72

S

TWDDH288

Hanging Wall

110.0

111.0

1.0

1.67

S

TWDDH288

M Zone

179.0

184.0

5.0

1.19

C

TWDDH288

Foot Wall

197.0

198.0

1.0

1.11

S

TWDDH288

Foot Wall

224.0

226.0

2.0

0.85

C

TWDDH288

Foot Wall

242.0

244.0

2.0

61.11

C

including

243.0

244.0

1.0

113.00

S

TWDDH288

Foot Wall

255.0

256.0

1.0

2.37

S

  

TWDDH289

Hanging Wall

57.0

63.0

6.0

0.99

C

TWDDH289

Hanging Wall

74.0

77.0

3.0

18.61

C

Including

76.0

77.0

1.0

32.20

S

TWDDH289

Hanging Wall

92.0

93.0

1.0

1.17

S

TWDDH289

Hanging Wall

101.0

103.4

2.4

3.45

C

Including

103.0

103.4

0.4

17.50

S

TWDDH289

Hanging Wall

112.0

115.0

3.0

1.10

C

TWDDH289

Hanging Wall

127.8

131.0

3.2

0.85

C

TWDDH289

Hanging Wall

137.0

143.0

6.0

0.72

C

including

142.0

143.0

1.0

2.41

S

TWDDH289

Hanging Wall

150.9

151.7

0.7

1.58

S

TWDDH289

M Zone

179.0

181.0

2.0

1.60

C

TWDDH289

M Zone

193.8

199.0

5.2

10.23

C

Including

197.0

198.0

1.0

46.50

S

TWDDH289

Foot Wall

239.2

240.0

0.8

1.11

S

TWDDH289

Foot Wall

252.3

253.1

0.8

1.94

S

TWDDH289

Foot Wall

290.0

291.0

1.0

1.07

S

TWDDH289

Foot Wall

299.0

300.0

1.0

3.37

S

TWDDH289

Foot Wall

305.0

308.0

3.0

0.92

C

TWDDH289

Foot Wall

329.6

330.0

0.4

1.07

S

TWDDH289

Foot Wall

351.0

352.0

1.0

1.24

S

  

TWDDH290

Hanging Wall

64.0

65.0

1.0

1.63

S

TWDDH290

Hanging Wall

82.4

82.8

0.4

3.05

S

TWDDH290

Hanging Wall

86.0

87.0

1.0

1.08

S

TWDDH290

Hanging Wall

97.0

101.0

4.0

1.02

C

TWDDH290

Hanging Wall

113.6

114.2

0.6

1.38

S

TWDDH290

Hanging Wall

116.5

117.0

0.5

2.23

S

  
Drill HoleZoneFromToLengthGradeSingle or
metresmetresmetresg/t AuComposite
uncutSample

TWDDH290

Hanging Wall

135.0

144.0

9.0

1.86

C

Including

142.0

142.4

0.4

12.00

S

TWDDH290

Hanging Wall

153.0

154.0

1.0

1.70

S

TWDDH290

M Zone

166.1

168.0

1.9

4.49

C

TWDDH290

M Zone

173.0

178.0

5.0

1.60

C

TWDDH290

M Zone

181.0

181.4

0.4

1.14

S

TWDDH290

Foot Wall

203.0

213.0

10.0

1.44

C

Including

212.1

212.5

0.4

15.40

S

TWDDH290

Foot Wall

216.0

219.0

3.0

0.84

C

TWDDH290

Foot Wall

236.0

238.0

2.0

3.99

C

TWDDH290

Foot Wall

259.0

262.0

3.0

2.30

C

TWDDH290

Foot Wall

266.0

267.0

1.0

1.18

S

TWDDH290

Foot Wall

283.0

284.0

1.0

1.90

S

TWDDH290

Foot Wall

289.0

297.0

8.0

0.80

C

TWDDH290

Foot Wall

342.0

343.0

1.0

1.20

S

TWDDH290

Foot Wall

359.0

360.0

1.0

1.36

S

TWDDH290

Foot Wall

381.0

386.0

5.0

1.72

C

TWDDH290

Foot Wall

408.5

410.0

1.5

1.20

C

TWDDH290

Foot Wall

418.0

419.0

1.0

2.33

S

  

Quality Assurance and Quality Control ('QA/QC?) Program for Core
Sampling


The Company has implemented a quality control program to ensure best
practices in sampling, analysis and security of core samples. The drill
core is first logged then sawn in half during the sampling process with
half being retained for verification and reference purposes. During
sample collection and assaying, there is an established QC procedure
which includes the insertion into the sample stream of standard
reference samples, sample duplicates and blank samples, including the
insertion of blank samples after all samples with visible gold.


The samples are delivered direct to Activation Laboratories Ltd.
(ActLabs) preparation facility in Timmins, Ontario by Trade Winds
personnel. The samples are analyzed for gold using the ActLabs procedure
1A2-50, which is a 50 g fire assay with AA finish. Samples returning
greater than 3 g/t Au are automatically processed using a fire
assay-gravimetric finish. Total metallic assays for gold were also
performed on selected intervals. All samples assayed by ActLabs include
a standard multi-element ICP package. The coarse rejects are kept in
Timmins for re-assaying purposes for a period of up to six months and
then returned to the Trade Winds site for long term storage. Selected
coarse rejects and pulps are check assayed by third party laboratories
other than ActLabs.


The material in this news release has been prepared and reviewed by
Stephen Wallace, P. Geo, VP Exploration, a Qualified Person as defined
in NI 43-101.

ABOUT TRADE WINDS VENTURES INC.


Trade Winds Ventures Inc. has been named to the 2011 TSX Venture 50, a
ranking of strong performing companies listed on TSX Venture Exchange.
The 2011 TSX Venture 50 is comprised of ten companies from each of five
sectors; Clean Technology, Mining, Oil & Gas, Diversified Industries,
and Technology & Life Sciences. The 2011 TSX Venture 50 companies were
chosen based on the following criteria, with equal weighting assigned to
each: share price appreciation, trading volume, market capitalization
growth and analyst coverage. TSX Venture 50 is a trade-mark of TSX Inc.
and is used under license.

Forward Looking Information


Certain information included in this news release constitutes
'forward-looking statements'. The words 'expect', 'will', 'intend',
'estimate' and similar expressions identify forward-looking statements.
Forward-looking statements are necessarily based upon a number of
estimates and assumptions that, while considered reasonable by
management, are inherently subject to significant business, economic and
competitive uncertainties and contingencies. Trade Winds cautions the
reader that such forward-looking statements involve known and unknown
risks, uncertainties and other factors that may cause the actual
results, performance or achievements of Trade Winds to be materially
different from Trade Winds′ estimated future results, performance or
achievements expressed or implied by those forward-looking statements
and the forward-looking statements are not guarantees of future
performance. These risks, uncertainties and other factors include, but
are not limited to, risks associated with the mining industry such as
government regulation, environmental and reclamation risks, title
disputes or claims, success of mining activities, future commodity
prices, costs of production, possible variation in mineral reserves,
mineral resources, grade or recovery rates, failure of plant, equipment
or processes to operate as anticipated, accidents, labour disputes, the
timing of estimated future production, capital expenditures, financial
market fluctuations, requirements for additional capital, conclusions of
economic evaluations, limitations on insurance coverage, risks
associated with using third-party contractors and inflation. Trade Winds
disclaims any intention or obligation to update or revise any
forward-looking statements whether as a result of new information,
future events or otherwise, except as required by applicable law.


Neither TSX Venture Exchange nor its Regulation Services Provider (as
that term is defined in the policies of the TSX Venture Exchange)
accepts responsibility for the adequacy or accuracy of this release.


Trade Winds Ventures Inc.

Ian D. Lambert, 416-840-9843

CEO/President

or

Terry
McGee, Toll Free 866-698-9187 ext 228

Investor Relations

604-648-6228

info@tradewindsventures.com

www.tradewindsventures.com



Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Trade Winds Ventures Inc.
Bergbau
-
-
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.