More Positive Drill Results From Richmont's Monique Project

22.06.2011  |  Marketwire

MONTREAL, QUEBEC -- (Marketwire) -- 06/22/11 -- Richmont Mines Inc. (TSX: RIC)(NYSE Amex: RIC), ('Richmont') is pleased to provide updated drill results from the completed 8,117 metre exploration drill program on the G and J zones of the Monique project (the 'Property'), located near Val-d'Or, Quebec.


Highlights:



-- Favourable new results obtained from the G Zone include 4.77 g/t Au over
15.3 metres, 2.28 g/t Au over 19.8 metres, 2.81 g/t Au over 17.5 metres,
and 3.31 g/t Au over 17.9 metres (true width);

-- Condemnation drilling intersects a new gold mineralized zone in the
central part of the Property (6.69 g/t Au over 4.40 metres);

-- A 12km IPower 3D induced polarization survey identified 2 anomalies that
will be drill tested later this year;

-- Geotechnical and geomechanical work completed.


Martin Rivard, President and CEO of Richmont Mines commented: 'Results from our completed 8,117 metre drill program on the G and J zones of the Monique project continue to be favourable, and provide additional support for our objective of evaluating the potential for a small open pit operation on the Property. All required geotechnical and geomechanical work has been completed, and we will use complete results from the drill campaign to finalize a Regulation 43-101 compliant technical report during the fourth quarter of 2011.'


Drill Results


The 8,117 metre drill program consisted of 47 holes on the G and J zones, two previously identified gold zones on the Property. New results obtained to date from the G Zone are outlined in Table 1 and in the longitudinal section (see link on next page). Pending results from the outstanding 12 holes on the G Zone will be published in the third quarter, along with available drill results from the J Zone.



----------------------------------------------------------------------------
TABLE 1
NEW MONIQUE PROPERTY DRILL RESULTS - G ZONE(1)
----------------------------------------------------------------------------
True
Hole Length From ToWidth(me Grade(2) Vertical Depth of
Number (metres) (metres) (metres) tres) (g/t Au) Intersection (metres)
----------------------------------------------------------------------------
MO-112-01 150 121.70 125.00 2.93 8.30 92.00
----------------------------------------------------------------------------
MO-112-02 171 128.30 139.00 8.41 1.55 115.55
----------------------------------------------------------------------------
MO-114-01 98 68.70 80.70 10.11 2.45 61.50
----------------------------------------------------------------------------
MO-114-02 131 79.80 88.90 6.14 3.19 78.59
----------------------------------------------------------------------------
MO-114-03 177 135.20 144.30 6.92 5.20 123.59
----------------------------------------------------------------------------
MO-115-01 234 207.20 232.00 18.09 1.88 199.12
----------------------------------------------------------------------------
MO-118-07 269 149.50 167.10 7.59 5.15 157.90
----------------------------------------------------------------------------
MO-118-08 189 151.70 170.00 12.99 1.79 147.79
----------------------------------------------------------------------------
MO-120-01 110 78.10 92.00 11.50 4.45 70.50
----------------------------------------------------------------------------
MO-120-02 138 133.00 137.60 3.89 3.03 109.37
----------------------------------------------------------------------------
MO-120-03 190 161.20 167.50 4.65 3.33 146.76
----------------------------------------------------------------------------
MO-120-04 195 165.60 172.60 5.06 1.56 154.39
----------------------------------------------------------------------------
MO-120-05 216 177.00 196.00 11.72 3.55 178.89
----------------------------------------------------------------------------
MO-120-06 180 132.40 150.50 15.02 2.77 116.07
----------------------------------------------------------------------------
MO-120-07 252 204.20 230.00 17.92 3.31 198.44
----------------------------------------------------------------------------
MO-120-08 300 227.00 253.00 17.54 2.81 226.11
----------------------------------------------------------------------------
MO-121-01 152 83.30 96.70 10.44 2.56 77.94
----------------------------------------------------------------------------
MO-121-02 170 93.40 117.30 16.71 2.54 97.54
----------------------------------------------------------------------------
MO-121-03 186 113.50 124.00 6.58 4.21 113.90
----------------------------------------------------------------------------
MO-122-01 125 76.90 99.10 19.79 2.28 66.81
----------------------------------------------------------------------------
MO-122-02 95 43.00 62.50 16.81 1.55 41.80
----------------------------------------------------------------------------
MO-122-03 205 164.00 184.30 13.20 2.61 164.45
----------------------------------------------------------------------------
MO-122-04 252 191.00 211.00 15.28 4.77 178.34
----------------------------------------------------------------------------
MO-123-02 195 148.20 160.90 10.05 3.93 133.94
----------------------------------------------------------------------------
Total: 4,380
----------------------------------------------------------------------------

1. Please see the Regulation 43-101 at the end of this release for full
analysis details.
2. High values cut at 34.28 g/t Au.


Link to Chart 1: G Zone longitudinal section: http://media3.marketwire.com/docs/Longitudinale_Section_EN.pdf


Project Update


Richmont completed geotechnical, geomechanical and hydrogeological testing on the Property in anticipation of permit application requirements for this project. In addition, the Company completed a 12 km IPower 3D induced polarization survey that identified 2 anomalies which will be drill tested later this year. Furthermore, 3,504 metres of condemnation drilling was also performed to evaluate the areas where surface infrastructure is planned, during which a new gold zone was identified in the central part of the Property. Specifically, hole MO-200-02 returned a value of 6.69 g/t Au over 4.40 metres from 51.9 to 56.3 metres. This zone will be a priority target for the next drilling program.


About Richmont Mines Inc.


Richmont Mines has produced over 1,200,000 ounces of gold from its operations in Quebec, Ontario and Newfoundland since beginning production in 1991. The Company currently produces gold from its Island Gold and Beaufor mines, and expects to begin commercial production from its Francoeur Mine in the first quarter of 2012, which will increase Richmont's production to 100,000 ounces of gold on an annual basis. With extensive experience in gold exploration, development and mining, the Company is well positioned to cost-effectively build its North American reserve base through a combination of organic growth, strategic acquisitions and partnerships. Richmont routinely posts news and other important information on its website (www.richmont-mines.com).


Forward-Looking Statements


This news release contains forward-looking statements that include risks and uncertainties. When used in this news release, the words 'estimate', 'project', 'anticipate', 'expect', 'intend', 'believe', 'hope', 'may' and similar expressions, as well as 'will', 'shall' and other indications of future tense, are intended to identify forward-looking statements. The forward-looking statements are based on current expectations and apply only as of the date on which they were made.


The factors that could cause actual results to differ materially from those indicated in such forward-looking statements include changes in the prevailing price of gold, the Canadian-United States exchange rate, grade of ore mined and unforeseen difficulties in mining operations that could affect revenue and production costs. Other factors such as uncertainties regarding government regulations could also affect the results. Other risks may be set out in Richmont Mines' Annual Information Form, Annual Reports and periodic reports.


Regulation 43-101


The exploration program was conducted by qualified persons as defined by Regulation 43-101. Specifically, the program was overseen by Mr. Raynald Vincent, Eng., MPM, Chief Exploration Projects, a qualified person as defined by Regulation 43-101, and an employee of Richmont Mines Inc.


The analyses were conducted at the ALS Minerals laboratory in Val-d'Or, Quebec, by means of fire assay fusion with atomic absorption or gravimetric finish.

Contacts:

Investor Relations:

Jennifer Aitken

Richmont Mines Inc.

514 397-1410
jaitken@richmont-mines.com
www.richmont-mines.com


Media Contact:

Ian Bolduc

Edelman Public Relations

514 844-6665 ext. 224
ian.bolduc@edelman.com



Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Richmont Mines Inc.
Bergbau
-
-

Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.