• Montag, 22 Juli 2024
  • 14:18 Uhr Frankfurt
  • 13:18 Uhr London
  • 08:18 Uhr New York
  • 08:18 Uhr Toronto
  • 05:18 Uhr Vancouver
  • 22:18 Uhr Sydney

AXMIN Inc.: Phase I Drilling Program Indicate Open Pit Potential at Komahun Plus Promising Early Stage Results at Western Zone

29.06.2011  |  Marketwire

TORONTO, ONTARIO -- (Marketwire) -- 06/29/11 -- AXMIN Inc. (TSX VENTURE: AXM) is pleased to announce further results from the Phase I drilling program (10 holes), which consisted of 34 holes (5,077 metres), plus new trenching results at its 100% owned Nimini Licences in Sierra Leone. Both the drilling and trenching results confirm the potential for near-surface economic gold mineralisation at Komahun and strengthen the possibility that the deposit is open along strike to the east and down dip. In addition, the newly discovered Western Extension, Hole NWKD 193, intersected 3 metres of 2.01 g/t Au close to surface and confirms the project upside for near-surface mineralisation in this area.


President and CEO of AXMIN, Mr. George Roach, comments, 'Komahun continues to surprise us with more than 35 g/t Au over 10 metres in surface trenching and good results from the near-surface drilling, indicating the potential for open pit resources at the Main Zone. We are very pleased with the positive results of our initial phase of drilling and if the trend continues in the next phase of drilling we will expect to see an increase in resources at the Main Zone and be in position to further define the project upside at both the Western Extension and Sendekor prospects.'


Komahun contains an 110,000 ounce measured and indicated resource, 0.4 Mt with an average grade of 9.1 g/t Au, plus a 435,000 ounce inferred resource, 3.1 Mt at an average grade of 4.3 g/t Au. The next phase of drilling, planned to re-start in the fall will focus on depth extensions at Komahun Main Zone, potentially further defining the Western Zone and exploring the large Sendekor prospect. The Sendekor prospect, located 4 km to the southwest of Main Zone is defined by a banded iron stone formation ('BIF'), elongated geochemical anomaly ( 60 ppb) and pitting over a 2.8 km length. It is expected that the Company will initiate a resource update in the first quarter of 2012.


Drilling Details


The Main Zone was investigated with 15 core holes (one repeat) for 2,556 metres, drilled to both tighten the spacing between some of the previous intersections and to continue to explore the eastern strike and down dip extensions of the deposit. Near-surface results include Hole NWKD 196, which intersected 12 metres of 3.07 g/t Au from surface and confirms and enhances the strong mineralisation observed close to surface in Hole NWKD195a and NWKD 195b (see press release June 1, 2011). These results combined with the recent trenching results, which include 35.48 g/t Au over 10 metres in trench AX101 and 3.73 g/t Au over 10 metres in trench AX100, suggest that open pit resources at Main Zone could be uncovered as drilling continues in the fourth quarter.


In addition, Hole NWKD 202 intersected 3.01 metres of 2.09 g/t Au at shallow depth, which continues to indicate the potential that the deposit remains open along strike to the east. More drilling will be required in a next phase to better understand this hypothesis.


The Western Extension, located approximately 500 metres northwest of the Komahun Main Zone, defined by a northeast-southwest trending gold in soil anomaly approximately 500 metres along strike, has been investigated by a series of pits and trenches. During this phase of drilling, the zone was tested by 17 shallow core holes for 2,242 metres along 500 metres of strike. In the newly discovered Western Extension, Hole NWKD 193 intersected 3 metres of 2.01 g/t Au close to surface and confirms the potential for near surface mineralisation in this area.


All intersection lengths reported in this Press Release are core length. See attached map for locations of drill holes, and refer to the tables below for trenching and drill assay results.


To view the map associated with this release, please visit the following link:

http://media3.marketwire.com/docs/axminmp.pdf



Main Zone Trench Results
----------------------------------------------------------------------------
Length Azimuth From To Interval Gold
Trench (m) UTME UTMN (deg) (m) (m) (m) (g/t Au)
----------------------------------------------------------------------------
AX100 31 262358 949842 140 0 29 29 1.34
----------------------------------------------------------------------------
including 10 20 10 3.73
----------------------------------------------------------------------------
AX101 63.5 262350 949878 140 1.0 25.0 25.0 14.47
----------------------------------------------------------------------------
including 8.0 18.0 10 35.48
----------------------------------------------------------------------------


Drill Results Table
----------------------------------------------------------------------------
EOH Dip Azimuth From To Interval Gold
Hole (m) (deg) (deg) (m) (m) (m) (g/t Au) Comments
----------------------------------------------------------------------------
Main
Zone
----------------------------------------------------------------------------
NWKD195b 167 -62 320 111.15 115.2 4.05 0.9 Infill
----------------------------------------------------------------------------

----------------------------------------------------------------------------
NWKD196 116 -55 320 1.0 13.0 12.0 3.07 Infill
----------------------------------------------------------------------------
including 2.5 7.5 5.0 7.07
----------------------------------------------------------------------------
and 79.0 81.25 2.25 2.39
----------------------------------------------------------------------------

----------------------------------------------------------------------------
NWKD199 251 -66 320 244.35 248.5 4.15 2.99 Infill
----------------------------------------------------------------------------

----------------------------------------------------------------------------
NWKD 200 284 -66 320 161.0 164.7 3.7 1.96 Infill
----------------------------------------------------------------------------

----------------------------------------------------------------------------
NWKD204 263 -60 320 146.4 159.3 12.9 1.1
----------------------------------------------------------------------------
and 174.0 176.8 2.8 6.58
----------------------------------------------------------------------------

----------------------------------------------------------------------------
Main Zone - Eastern Extension
----------------------------------------------------------------------------
NWKD201 40m east
154 -45 320 102.5 103.8 1.5 4.48 extension
----------------------------------------------------------------------------

----------------------------------------------------------------------------
NWKD202 116 -46.5 320 84.4 87.5 3.1 2.09
----------------------------------------------------------------------------

----------------------------------------------------------------------------
Western Extension
----------------------------------------------------------------------------
NWKD192 149 -45 140 26.4 29.1 2.7 1.17
----------------------------------------------------------------------------

----------------------------------------------------------------------------
NWKD193 182 -45 140 4 7.0 3.0 2.01
----------------------------------------------------------------------------

----------------------------------------------------------------------------
NWKD194 137 -45 140 102.9 105.3 2.4 3.49
----------------------------------------------------------------------------

----------------------------------------------------------------------------


Quality Control Procedures and Qualified Persons


All soil samples were sun dried and sieved to collect a 150g sample of less than 180 micron diameter grains at AXMIN Nimini exploration camp and sent to independent ALS Labs Bamako (Mali) for assaying.


All drill holes were collared in HQ diameter size and width was reduced to NQ size core with depth, at angle varying from -45 to -70. Recuperation within the clayish lateric section varied from 50 to 70%, while in the saprolite and hard rock, recuperation was usually better than 95%. The HQ and NQ core is measured by AXMN geologists at the Nimini camp and then split into 2 halves. Half the sample is sealed and sent to Kankan Guinee accompanied by an AXMIN geologist and handed over to an ALS representative. The half split core sample in Bamako is crushed and pulverised to 200 mesh (80 micron) and a 50 gram split is analysed by fire assay with an AA finish. Blanks, standards and duplicates are being used to monitor laboratory performance during the analysis.


This press release has been reviewed by an in-house qualified person, Francois Auclair, M.Sc., AXMIN VP Exploration, Member of the Ordre des Geologues du Quebec and Fellow of the Geological Association of Canada, Qualified Person under the National Instrument 43-101.


About AXMIN


AXMIN is a Canadian exploration and development company with a strong focus on central and West Africa. AXMIN has projects in Central African Republic, Mali, Mozambique, Sierra Leone and Senegal. AXMIN is positioned to grow in value as it progresses its Passendro Gold Project towards development and builds on its project pipeline focusing on transitioning from an explorer to producer. For more information regarding AXMIN visit our website at www.axmininc.com.


This press release includes certain 'Forward-Looking Statements.' All statements, other than statements of historical fact included herein, including without limitation, statements regarding future plans and objectives of AXMIN; and statements regarding the ability to develop and achieve production at Passendro, to revalidate the BFS and to satisfy the terms of the Mining Licence as negotiated, are forward-looking statements that involve various risks and uncertainties.


There can be no assurance that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from AXMIN's expectations have been disclosed under the heading 'Risk Factors' and elsewhere in AXMIN's documents filed from time-to-time with the TSX Venture Exchange and other regulatory authorities. AXMIN disclaims any intention or obligation to update or revise any forward-looking statements whether resulting from new information, future events or otherwise, except as required by applicable law.


Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Contacts:

AXMIN Inc.

George Roach

President & CEO

Direct T: 44 779 626 3999


AXMIN Inc.

Judy Webster

Manager Investor Relations

416 368 0993 ext 221
ir@axmininc.com
www.axmininc.com



Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Axmin Inc.
Bergbau
A1JUGD
CA05461V2012

Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.