• Samstag, 23 November 2024
  • 08:36 Uhr Frankfurt
  • 07:36 Uhr London
  • 02:36 Uhr New York
  • 02:36 Uhr Toronto
  • 23:36 Uhr Vancouver
  • 18:36 Uhr Sydney

Timmins Gold Intersects Gold Below the Open Pit and Along Strike at San Francisco Gold Project Intersects 11.93 grams per tonne gold over 4.57 metres

14.07.2011  |  Marketwire

Intersects 11.93 grams per tonne gold over 4.57 metres

VANCOUVER, BRITISH COLUMBIA -- (Marketwire) -- 07/14/11 -- Timmins Gold Corp. (TSX: TMM) is pleased to announce that its ongoing drill program continues to extend, expand and deepen the mineralization at the San Francisco Gold Mine, located in the State of Sonora, Mexico.


During the four months from March to the end of June, 2011, the Company completed 38,623 metres of reverse circulation drilling in 268 holes and 10,015 metres of core drilling in 26 holes. The ongoing drill program is focused around the existing pit in a zone 2 kilometres E-W by 1 km N-S, and also beneath the presently planned pit depth of 240 metres. Drilling has also started around the La Chicharra pit 2 kilometres to the west of the San Francisco pit. Significant gold values have been intersected in all directions around the San Francisco pit including beneath the planned San Francisco pit bottom.


As a result of the success of the ongoing program the Company has expanded the drill program and has on site 6 reverse circulation drill rigs and 3 core drill rigs, one of which is capable of drilling to depths of 1,000 metres. The Company has engaged independent consulting firm Micon International Inc. of Toronto to provide an updated NI 43-101 Reserve and Resource Estimate which will incorporate assay results obtained from over 85,000 metres of drilling conducted from June 30, 2010 to July 15, 2011.


Significant mineral intercepts from the program around the San Francisco pit are as follows: 4.57 metres of 11.932 gpt gold and 39.62 metres of 1.613 gpt gold in Hole TF-1280, 6.09 metres of 4.27 gpt gold in hole TF-1099; 10.67 metres of 1.62 gpt gold and 6.09 metres of 1.43 gpt gold, both in hole TF-1100; 7.62 metres of 1.52 gpt gold in hole TF-1117; 6.10 metres of 2.28 gpt gold in hole TF-1119. Hole TF-1168 had multiple mineral intercepts including 6.10 metres of 1.65 gpt gold, 7.62 metres of 1.43 gpt gold and 4.57 metres of 8.31 gpt gold including an interval of 1.53 metres of 24.63 gpt gold. Hole TF-1196 intercepted three mineralized zones including, 4.57 metres of 3.25 gpt gold. Hole TF-1234 intersected 6.09 metres of 3.41 gpt gold and 6.10 metres of 1.082 gpt gold. Hole TF-1240 intersected multiple zones including 12.19 metres of 2.0 gpt gold, 3.05 metres of 8.294 gpt gold, 3.05 metres of 1.12 gpt gold and 7.62 metres of 1.40 gpt gold.


The drill program has included exploring below the currently planned pit bottom of 240 metres using reverse circulation drilling and core drilling for holes deeper than 250 metres. The returned assays indicate the mineralization is extending in parallel mineral bodies up to 40 metres in width below the currently planned pit bottom and has shown mineralized zones at depths of 100 metres below the currently planned pit bottom.


Results from deep core drilling underneath the planned pit bottom were very encouraging. The previously stated Hole TF-1280 intersected 4.57 metres of 11.932 gpt gold and 39.62 metres of 1.613 gpt gold. Hole TFD-90 intersected 4.50 metres of 2.219 gpt gold at a depth of 385 metres and Hole TFD-80 intersected 1.50 metres of 3.097 gpt gold at a depth of 421.50 metres. Directly underneath the planned pit bottom hole TF-1246 intersected 12.19 metres of 1.031 gpt gold and hole TF-1279 intersected several intervals including 4.57 metres of 1.036 gpt gold, 4.57 metres of 1.89 gpt gold and 6.09 metres of 2.48 gpt gold.


The current exploration below the planned pit bottom supports the theory from the Company's geological team, that the mineralized system may extend to greater depths. This is consistent in 'Mesothermal' systems, which have significant depth extent, and have the potential to yield high grade feeder systems at depth.


Core drilling continuing along strike in a zone 600 metres to the east of the pit returned values as high as 25.5 metres of 1.908 gpt gold in hole TFD-71. Results of holes in this new zone are confirming the continuity of the gold mineralization at least 600 metres to the East of the current pit limit. The Company has extended the core drill program in order to cover the next 400 metres to the east to determine whether the mineralization extends at least 1 kilometer to the east of the SF pit.


The table below highlights the better intercepts from the last four months of drilling:



Reverse Circulation Drilling
------------------------------------------------------------------
Drill True
Hole From To Width Au
Number (m) (m) (m) (g/t)
------------------------------------------------------------------
TF-1092 1.52 9.14 7.62 1.602
Includes 1.52 3.05 1.53 5.257
Includes 7.62 9.14 1.52 2.455
------------------------------------------------------------------
TF-1099 105.16 111.25 6.09 4.270
Includes 108.20 109.73 1.53 5.820
Includes 109.73 111.25 1.52 10.810
------------------------------------------------------------------
TF-1100 47.24 57.91 10.67 1.620
Includes 50.29 56.34 6.10 2.621
And 64.01 70.10 6.09 1.430
Includes 64.01 68.58 4.57 1.839
------------------------------------------------------------------
TF-1107 62.48 70.10 7.62 0.571
Include 62.48 65.53 3.05 1.274
And 102.11 103.63 1.52 2.724
------------------------------------------------------------------
TF-1109 94.49 103.63 9.14 0.859
Includes 100.58 103.63 3.05 2.362
------------------------------------------------------------------
TF-1114 80.77 86.87 6.10 1.613
Includes 80.77 82.30 1.53 5.556
------------------------------------------------------------------
TF-1116 160.02 176.78 16.76 1.832
Includes 160.02 164.59 4.57 1.571
Includes 169.16 170.69 1.52 14.250
------------------------------------------------------------------
TF-1117 143.26 150.88 7.62 1.516
Includes 146.30 149.35 3.05 3.449
------------------------------------------------------------------
TF-1119 33.53 39.62 6.09 0.941
Includes 33.53 36.58 1.53 1.499
And 83.82 89.92 6.10 2.283
Includes 85.34 86.87 1.52 7.777
------------------------------------------------------------------
TF-1122 73.15 79.25 6.10 1.503
Includes 76.20 77.72 1.52 5.212
And 100.58 109.73 9.15 0.771
Includes 100.58 102.11 1.53 3.020
Includes 106.68 108.20 1.52 1.125
------------------------------------------------------------------
TF-1127 74.68 82.30 9.14 1.412
Includes 77.72 80.77 3.05 3.075
------------------------------------------------------------------
TF-1129 45.72 48.77 3.05 1.143
And 96.01 100.58 4.57 4.541
Includes 96.01 97.54 1.53 10.985
------------------------------------------------------------------
TF-1152 15.24 24.38 9.14 4.368
Includes 21.34 24.38 3.04 12.760
------------------------------------------------------------------
TF-1158 47.24 53.34 6.10 1.829
Includes 48.77 53.34 4.57 2.176
------------------------------------------------------------------
TF-1159 100.58 108.20 7.62 1.035
Includes 105.16 106.68 1.52 3.269
------------------------------------------------------------------
TF-1162 138.68 147.83 9.15 0.938
Includes 140.21 141.73 1.52 2.713
Includes 144.78 146.30 1.52 1.200
And 155.45 163.07 7.62 1.430
Includes 156.97 158.50 1.53 6.052
------------------------------------------------------------------
TF-1168 0.00 6.10 6.10 1.649
Includes 4.57 6.10 1.53 4.818
And 18.29 25.91 7.62 1.492
Includes 21.34 24.38 3.04 2.940
And 103.63 108.20 4.57 8.308
Includes 103.63 105.16 1.53 24.633
And 138.68 150.88 14.20 0.470
Includes 140.21 141.73 1.52 0.928
Includes 149.35 150.88 1.53 1.165
------------------------------------------------------------------
TF-1170 24.38 33.53 9.15 1.631
Includes 25.91 28.96 3.05 3.907
------------------------------------------------------------------
TF-1186 35.05 38.10 3.05 4.372
Includes 35.05 36.58 1.53 8.501
------------------------------------------------------------------
TF-1188 13.72 18.29 4.57 0.913
Includes 15.24 16.76 1.52 2.466
------------------------------------------------------------------
TF-1196 4.57 13.72 9.15 0.695
Includes 7.62 9.14 1.52 2.696
And 103.63 108.20 4.57 3.253
Includes 103.63 105.16 1.53 8.547
And 135.64 143.26 7.62 0.682
Includes 135.64 138.68 3.04 1.199
------------------------------------------------------------------
TF-1204 112.78 118.87 6.09 1.175
Includes 117.35 118.87 1.52 2.991
------------------------------------------------------------------
TF-1207 73.15 79.25 6.10 1.381
Includes 77.72 79.25 1.53 4.836
------------------------------------------------------------------
TF-1209 9.14 13.72 4.58 1.159
And 120.40 126.49 6.09 1.008
------------------------------------------------------------------
TF-1210 36.58 41.15 4.57 1.184
------------------------------------------------------------------
TF-1216 128.02 132.59 4.57 2.935
Includes 128.02 129.54 1.52 8.285
And 149.35 152.40 3.04 0.877
------------------------------------------------------------------
TF-1220 128.02 149.35 21.33 1.063
Includes 141.73 144.78 3.05 3.669
------------------------------------------------------------------
TF-1222 126.49 141.73 15.24 0.477
Includes 126.49 128.02 1.52 1.223
Includes 134.11 135.64 1.53 1.338
------------------------------------------------------------------
TF-1234 36.58 42.67 6.09 3.410
And 62.48 68.58 6.10 1.082
And 74.68 97.54 22.86 0.586
Includes 79.25 83.20 3.95 1.442
------------------------------------------------------------------
TF-1236 47.24 53.34 6.10 1.253
Includes 48.77 51.82 3.05 2.338
------------------------------------------------------------------
TF-1240 50.29 62.48 12.19 2.001
Includes 57.91 60.96 3.05 8.294
And 82.30 85.35 3.05 3.117
And 88.39 94.49 6.10 0.449
Include 89.92 91.44 1.52 1.296
And 105.16 112.78 7.62 1.398
Includes 111.25 112.78 1.53 4.836
------------------------------------------------------------------
TF-1251 83.82 88.39 4.57 1.537
Includes 85.34 86.87 1.53 4.148
------------------------------------------------------------------
TF-1254 30.48 45.72 15.24 0.726
Includes 30.48 32.00 1.52 2.653
Includes 44.20 45.72 1.52 1.174
And 100.58 114.30 13.72 0.710
Includes 109.73 112.78 3.05 2.932
And 137.16 140.21 3.05 0.973
Includes 138.68 140.21 1.53 1.828
------------------------------------------------------------------
TF-1259 54.86 65.53 10.67 1.150
Includes 57.91 60.96 3.05 2.667
------------------------------------------------------------------
TF-1270 3.05 6.10 3.05 5.693
And 18.29 19.81 1.52 3.305
And 59.44 62.48 3.04 0.620
And 68.58 77.72 9.14 0.521
Includes 73.15 76.2 3.05 1.194
And 132.59 134.11 1.52 0.237
------------------------------------------------------------------
TF-1278 21.34 48.77 27.43 1.401
Includes 21.34 24.38 3.04 2.958
Includes 28.96 39.62 10.66 1.909
And 57.91 70.10 12.19 1.637
Includes 60.96 67.06 6.10 2.773
And 83.82 88.39 4.57 0.446
Includes 83.82 85.34 1.52 1.101
And 102.11 103.63 1.52 0.266
And 106.68 108.2 1.52 0.214
And 124.97 146.3 21.33 0.393
Includes 128.02 129.54 1.52 1.218
------------------------------------------------------------------
TF-1279 0.00 18.29 18.29 0.536
Includes 6.10 10.67 4.57 1.036
And 24.38 27.43 3.05 0.233
And 33.53 36.58 3.05 0.296
And 51.82 56.39 4.57 1.899
Includes 51.82 54.86 3.04 2.775
And 60.96 64.01 3.05 1.084
Includes 60.96 62.48 1.52 1.777
And 68.58 76.20 7.62 0.565
Includes 71.63 73.15 1.52 2.140
And 80.77 83.82 3.05 0.214
And 89.92 96.01 6.09 2.48
Includes 89.92 94.49 4.57 3.259
And 111.25 115.82 4.57 2.336
------------------------------------------------------------------
TF-1280 15.24 30.48 15.24 1.431
Includes 25.91 27.43 1.52 9.798
And 33.53 42.67 9.14 0.762
Includes 33.53 36.58 3.05 1.799
And 56.39 68.58 12.19 0.647
Includes 56.39 57.91 1.52 1.683
And 73.15 76.20 3.05 0.226
And 88.39 92.96 4.57 11.932
Includes 88.39 91.44 3.05 17.57
Includes 89.92 91.44 1.52 25.674
And 106.68 141.73 35.05 1.807
Includes 109.73 118.87 9.14 4.456
------------------------------------------------------------------
TF-1282 0.00 9.14 9.14 1.982
Includes 6.10 9.14 3.04 3.659
And 24.38 35.05 10.67 1.778
Includes 32.00 33.53 1.52 9.013
And 77.72 79.25 1.52 0.356
And 129.54 140.21 10.67 0.343
Includes 132.59 134.11 1.52 1.039
------------------------------------------------------------------

Core Drilling
------------------------------------------------------------------
Drill True
Hole From To Width Au
Number (m) (m) (m) (g/t)
------------------------------------------------------------------
TFD-71 68.00 99.50 31.50 1.570
Includes 68.00 93.50 25.50 1.908
Includes 80.00 83.00 3.00 4.740
Includes 90.50 93.00 3.00 4.696
And 138.50 146.00 7.50 0.602
------------------------------------------------------------------
TFD-72 36.00 39.00 3.00 0.942
And 49.50 54.00 4.50 1.483
Includes 51.00 54.00 3.00 2.038
And 181.50 184.50 3.00 0.949
------------------------------------------------------------------
TFD-75 96.00 100.50 4.50 3.136
Include 97.50 99.00 1.50 3.136
And 115.50 118.50 3.00 8.868
Includes 117.00 118.50 1.50 16.969
And 175.50 181.50 6.00 0.722
Includes 178.50 180.00 1.50 2.260
And 205.50 208.50 3.00 2.369
------------------------------------------------------------------
TFD-81 48.00 60.00 12.00 1.813
Includes 55.50 60.00 4.50 3.331
------------------------------------------------------------------
TFD-83 139.50 144.00 4.50 1.841
Includes 139.50 141.00 1.50 4.672
------------------------------------------------------------------
TFD-85 150.00 159.00 9.00 2.176
Includes 153.00 154.50 1.50 10.268
------------------------------------------------------------------
TFD-89 51.00 58.50 4.50 0.880
And 150.00 153.00 3.00 1.696
And 177.00 186.00 9.00 0.437
Includes 177.00 178.50 1.50 1.795
And 216.00 220.50 4.50 2.118
------------------------------------------------------------------
TFD-90 120.00 145.50 25.50 0.424
Includes 120.00 123.00 3.00 1.179
And 240.00 268.50 28.50 1.058
Includes 240.00 246.00 6.00 1.470
Includes 253.50 256.50 3.00 2.674
Includes 264.00 265.50 1.50 2.889
And 289.50 292.50 3.00 5.537
And 315.00 336.00 21.00 0.571
Includes 315.00 316.50 1.50 2.603
Includes 321.00 322.50 1.50 1.308
And 367.50 399.00 31.50 0.721
Includes 373.50 375.00 1.50 1.998
Includes 385.50 387.00 1.50 1.264
Includes 388.50 393.00 4.50 2.219
And 462.00 469.50 7.50 0.450
Includes 468.00 469.50 1.50 1.465
------------------------------------------------------------------


The size of the gold mineralization zone, its presence within large shear zones and the continuous nature of the gold within these zones form the basis of management's expectation that the ongoing drill program could lead to a significant increase in the mineral resource at San Francisco and could potentially also lead to the discovery of additional satellite deposits within the existing land package.


The samples collected during the drilling were prepared by The Company and assayed by Inspectorate Lab using fire assay and AA finish Gold values above 10 g/t Au are re-assayed and checked by fire assay and gravimetric finish. Strict sampling and QA-QC protocol were followed to ensure the best practices in sampling and analysis of the drill samples. Duplicates, standards and blanks were inserted into the sampling stream at intervals of 25 samples.


About Timmins Gold


Timmins Gold Corp. is a gold production and development company. In April 2010, Timmins Gold commenced commercial production at its wholly owned San Francisco gold mine in Sonora, Mexico. Timmins Gold has projected production at a rate of approximately 100,000 ounces of gold per year at a life of mine cash cost of approximately $489 per ounce. (Micon International Preliminary Feasibility Study, November 2010).


This press release was reviewed and prepared by Lawrence A. Dick, Ph.D., P.Geo, a director of the Company, who is recognized as a Qualified Person under the guidelines of National Instrument 43-101 and by Miguel Soto, P. Geo., a director and the COO of the Company. For further information contact Timmins Gold Corp. at 604-682-4002 or go to the website at www.timminsgold.com.


On behalf of the Board:


Bruce Bragagnolo, LLB, Chief Executive Officer


This News Release contains forward-looking statements. Forward-looking statements are statements which relate to future events. Such statements include estimates, forecasts and statements as to management's expectations with respect to, among other things, business and financial prospects, financial multiples and accretion estimates, future trends, plans, strategies, objectives and expectations, including with respect to production, exploration drilling, exploitation activities and events or future operations. Information inferred from the interpretation of drilling results and information concerning mineral resource estimates may also be deemed to be forward-looking statements, as it constitutes a prediction of what might be found to be present when, and if, a project is actually developed.


In some cases, you can identify forward-looking statements by terminology such as 'may', 'should', 'expects', 'plans, 'anticipates', believes', 'estimates', 'predicts', 'potential', or 'continue' or the negative of these terms or other comparable terminology. These statements are only predictions and involve known and unknown risks, uncertainties and other factors that may cause our or our industry's actual results, level of activity, performance or achievements to be materially different from any future results, levels of activity, performance, or achievements expressed or implied by these forward-looking statements.


While these forward-looking statements, and any assumptions upon which they are based, are made in good faith and reflect our current judgment regarding the direction of our business, actual results will almost always vary, sometimes materially, from any estimates, predictions, projections, assumptions or other future performance suggestions herein. Except as required by applicable law, Timmins Gold does not intend to update any forward-looking statements to conform these statements to actual results.


Neither the TSX nor its Regulation Services Provider (as that term is defined in the policies of the TSX) accepts responsibility for the adequacy or accuracy of this news release.

Contacts:

Timmins Gold Corp.

Bruce Bragagnolo, LLB

Chief Executive Officer

604-638-8980
bruce@timminsgold.com
www.timminsgold.com



Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Alio Gold Inc.
Bergbau
-
-
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.