• Mittwoch, 24 Juli 2024
  • 11:25 Uhr Frankfurt
  • 10:25 Uhr London
  • 05:25 Uhr New York
  • 05:25 Uhr Toronto
  • 02:25 Uhr Vancouver
  • 19:25 Uhr Sydney

Trelawney Intersects 356.00 Metres of 1.35 g/t Gold From Continued Expansion Drilling at Cote Lake

29.08.2011  |  Marketwire

TORONTO, ONTARIO -- (Marketwire) -- 08/29/11 -- Trelawney Mining and Exploration Inc. (the 'Company' or 'Trelawney') (TSX VENTURE: TRR)(FRANKFURT: RTW) announces the results from 9 additional holes drilled on the Cote Lake Deposit on the Chester Project located halfway between Timmins and Sudbury in northern Ontario. The results are from the ongoing expansion and infill drilling on the Cote Lake Deposit. Drilling continues to intersect wide zones of low to moderate grade gold mineralization.


Highlights of the current drilling include:



-- Hole E11-72 - 30.0 metres of 0.92 g/t gold
-- Hole E11-74 - 126.00 metres of 0.82 g/t gold
-- Hole E11-76 - 91.00 metres of 1.41 g/t gold
-- Hole E11-77 - 303.00 metres of 1.27 g/t gold
-- Hole E11-78 - 356.00 metres of 1.35 g/t gold


Drill holes E11-77 and E11-78 are both located on section 88 00E, collared 85 metres apart and drilled south at approx. 47 degrees. This section is 100 metres west of the currently defined resource estimate. Updated sections and drill plan will be available shortly on the Company's website.


The inferred resource of the Cote Lake Deposit currently stands at 131 million tonnes grading 1.0 g/t for a total of 4.2 million ounces gold as reported in Trelawney's press release dated March 7, 2011. To date, mineralization of the Cote Lake Deposit has been intersected over a strike-length of 1,000 metres and outcrops at two known locations 500 metres apart. The zone remains open along strike and at depth on all sections that have been drilled. In section the zone attains widths of up to 300 metres. The mineralization delineated by drilling to date coincides well with a NE-SW-trending IP anomaly. The Cote Lake Deposit consists of low to moderate grade gold /- copper mineralization which is associated with brecciated intermediate to felsic, and locally mafic intrusive rocks. Mineralization occurs in the form of disseminated and fracture-controlled sulfides, which generally correlate to the gold values. Visible gold is commonly observed. The zones are bleached with the prevalent alteration being feldspathic, chloritic and biotitic. The nature of the alteration and mineralization is indicative of a porphyry-style deposit.


The expansion and exploration drill program currently includes six drills working on the Cote Lake Deposit. Three drills continue with the expansion drilling and three are undertaking infill drilling.


Greg Gibson, Trelawney's President and CEO commented, 'We are very pleased with the continued significant results of the step out drilling, and believe that this information will significantly expand the resource in our next estimate update. Definition drilling continues to be encouraging, with the current holes confirming original zones found in the wider spaced drilling. We will continue our aggressive exploration program and initial engineering studies to enable us to fast-track the development of this deposit.'



Cote Lake Deposit Drilling Results:
----------------------------------------------------------------------------
Gold Au cut Gold
Section Hole From To Length (g/t) Grade (oz/t) Comments
-------------------------------------------
cut to
(m) (m) (m) uncut 25g/t(i) uncut
----------------------------------------------------------------------------
89 00E E11-72 21.10 23.60 2.50 2.56 0.07 outside resource
----------------------------------------------------------------------------
55.00 62.00 7.00 2.60 0.08
----------------------------------------------------------------------------
195.00 196.40 1.40 1.08 0.03
----------------------------------------------------------------------------
223.00 225.05 2.05 1.12 0.03
----------------------------------------------------------------------------
238.00 268.00 30.00 0.92 0.03
----------------------------------------------------------------------------
285.00 286.00 1.00 1.58 0.05
----------------------------------------------------------------------------

----------------------------------------------------------------------------
91 50E E11-73 60.00 61.00 1.00 1.46 0.04 infill
----------------------------------------------------------------------------
64.00 65.00 1.00 2.96 0.09
----------------------------------------------------------------------------
83.00 84.00 1.00 1.04 0.03
----------------------------------------------------------------------------
92.00 102.00 10.00 0.73 0.02
----------------------------------------------------------------------------
190.00 191.00 1.00 3.01 0.09
----------------------------------------------------------------------------
197.00 199.00 2.00 2.22 0.06
----------------------------------------------------------------------------
226.00 228.00 2.00 1.08 0.03
----------------------------------------------------------------------------
236.00 238.00 2.00 1.05 0.03
----------------------------------------------------------------------------
275.00 320.00 45.00 0.71 0.02
----------------------------------------------------------------------------
329.00 330.00 1.00 1.13 0.03
----------------------------------------------------------------------------
338.00 339.00 1.00 1.80 0.05
----------------------------------------------------------------------------
361.00 363.00 2.00 1.50 0.04
----------------------------------------------------------------------------
371.00 375.00 4.00 1.25 0.04
----------------------------------------------------------------------------
429.00 430.00 1.00 26.10 25.00 0.76
----------------------------------------------------------------------------

----------------------------------------------------------------------------
91 00E E11-74 274.00 282.00 8.00 1.29 0.04 infill
----------------------------------------------------------------------------
294.00 295.00 1.00 2.62 0.08
----------------------------------------------------------------------------
317.00 355.00 38.00 0.83 0.02
----------------------------------------------------------------------------
374.00 375.00 1.00 9.45 0.28
----------------------------------------------------------------------------
417.00 429.00 12.00 0.96 0.03
----------------------------------------------------------------------------
471.00 597.00 126.00 0.82 0.02
----------------------------------------------------------------------------
incl 565.00 570.00 5.00 5.32 0.16
----------------------------------------------------------------------------
617.00 618.00 1.00 57.85 25.00 1.69
----------------------------------------------------------------------------
640.00 641.00 1.00 2.87 0.08
----------------------------------------------------------------------------
645.00 646.00 1.00 2.40 0.07
----------------------------------------------------------------------------

----------------------------------------------------------------------------
85 00E E11-75 47.00 48.00 1.00 1.25 0.04 outside resource
----------------------------------------------------------------------------
57.00 58.00 1.00 1.27 0.04
----------------------------------------------------------------------------
94.00 95.00 1.00 2.16 0.06
----------------------------------------------------------------------------
115.00 117.00 2.00 6.73 0.20
----------------------------------------------------------------------------
124.00 125.00 1.00 3.41 0.10
----------------------------------------------------------------------------
149.00 150.00 1.00 1.33 0.04
----------------------------------------------------------------------------
191.00 192.00 1.00 2.26 0.07
----------------------------------------------------------------------------
206.00 207.00 1.00 2.87 0.08
----------------------------------------------------------------------------
213.00 214.00 1.00 1.05 0.03
----------------------------------------------------------------------------
292.00 294.00 2.00 1.02 0.03
----------------------------------------------------------------------------

----------------------------------------------------------------------------
92 50E E11-76 23.00 114.00 91.00 1.41 1.31 0.04 infill
----------------------------------------------------------------------------

----------------------------------------------------------------------------
88 00E E11-77 317.00 323.00 6.00 1.17 0.03 outside resource
----------------------------------------------------------------------------
355.00 658.00 303.00 1.27 1.14 0.04
----------------------------------------------------------------------------
incl 355.00 543.00 188.00 1.36 1.16 0.04
----------------------------------------------------------------------------
with 392.00 395.00 3.00 21.28 10.89 0.62
----------------------------------------------------------------------------
with 420.00 421.00 1.00 31.40 25.00 0.92
----------------------------------------------------------------------------
and incl 573.00 658.00 85.00 1.47 0.04
----------------------------------------------------------------------------

----------------------------------------------------------------------------
88 00E E11-78 241.00 597.00 356.00 1.35 1.31 0.04 outside resource
----------------------------------------------------------------------------
incl 263.00 425.00 162.00 2.15 2.06 0.06
----------------------------------------------------------------------------
with 270.00 295.00 25.00 5.19 4.61 0.15
----------------------------------------------------------------------------
with 382.00 391.00 9.00 6.87 0.20
----------------------------------------------------------------------------
and incl 530.00 596.00 66.00 1.41 0.04
----------------------------------------------------------------------------

----------------------------------------------------------------------------
86 00E E11-79 117.00 118.00 1.00 1.11 0.03 outside resource
----------------------------------------------------------------------------
153.00 154.00 1.00 1.79 0.05
----------------------------------------------------------------------------
171.00 212.00 41.00 0.55 0.02
----------------------------------------------------------------------------
231.00 232.00 1.00 5.72 0.17
----------------------------------------------------------------------------
237.00 238.00 1.00 1.12 0.03
----------------------------------------------------------------------------
269.00 270.00 1.00 2.28 0.07
----------------------------------------------------------------------------
313.00 315.70 2.70 1.04 0.03
----------------------------------------------------------------------------
392.00 393.00 1.00 1.60 0.05
----------------------------------------------------------------------------
433.00 434.00 1.00 1.32 0.04
----------------------------------------------------------------------------
445.00 446.00 1.00 1.56 0.05
----------------------------------------------------------------------------

----------------------------------------------------------------------------
85 00E E11-80 69.40 70.40 1.00 1.43 0.04 outside resource
----------------------------------------------------------------------------
90.00 92.00 2.00 2.41 0.07
----------------------------------------------------------------------------
96.00 97.00 1.00 3.24 0.09
----------------------------------------------------------------------------
115.50 116.80 1.30 1.08 0.03
----------------------------------------------------------------------------
165.00 166.00 1.00 3.36 0.10
----------------------------------------------------------------------------
253.00 255.00 2.00 4.89 0.14
----------------------------------------------------------------------------
Notes
- True widths of intersections are unknown at this time
- (i)Only intervals with assays cut to 25 g/t gold are shown
- Intervals are graded with a lower cut of 0.30 g/t with internal waste and
low grade material within graded zones of up to 20 metres in length


Trelawney has implemented a quality-control, quality assurance program to ensure best practice principals are being applied in the sampling and analysis of the drill core. Samples are crushed to -8 mesh then a 1,000 gram subset of each sample is pulverized to 90% passing -150 mesh. Assays have been completed using a standard fire assay with a 30 gram aliquot and an AA finish. For samples that return values of between two to five grams per tonne gold, another pulp is taken and fire assayed with a gravimetric finish. Samples returning values greater than 5 grams per tonne are re-analyzed by pulp metallic analysis, NQ size drill core is saw cut, and half the drill core is sampled in standard intervals. The remaining half of the core is stored in a secure location. The drill core is transported in security-sealed bags to the Accurassay prep lab in Sudbury, Ontario by Trelawney personnel. Accurassay is an ISO/IEC 17025 certified Laboratory by the Standards Council of Canada. In addition to quality assurance controls at the laboratory, blanks and certified standards have been inserted into the sample stream at random intervals.


David Beilhartz, Vice President, Exploration of Trelawney, a Qualified Person under NI 43-101, has prepared or supervised the scientific or technical information for the property and verified the data disclosed in this press release.


Trelawney is a Canadian junior mining and exploration company with a focus on Archean gold deposits. The Company's current focus is directed towards the continued exploration and development of the Cote Lake Deposit, located in Chester Township, 20 kilometres southwest of Gogama, Ontario.


This news release may contain forward-looking statements including but not limited to comments regarding the timing and content of upcoming work programs, geological interpretations, receipt of property titles, potential mineral recovery processes, etc. Forward-looking statements address future events and conditions and therefore, involve inherent risks and uncertainties. Actual results may differ materially from those currently anticipated in such statements.


Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Contacts:

Trelawney Mining and Exploration Inc.

Greg Gibson

President and CEO

416-363-8567
ggibson@trelawneymining.com
www.trelawneymining.com



Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Trelawney Mining and Exploration Inc.
Bergbau
-
-

Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.